USCGC Kingfisher Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Kingfisher RFQ.doc | DOC document | |
| Kingfisher_R0_Blank_Estimate.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(4/6/2010 / Rev 0)
USCGC KINGFISHER (WPB-87322)
87 FOOT PATROL BOAT
SPECIFICATION FOR DRYDOCK REPAIRS
Developed By:
CWO Donnie Boyer
PLM, Patrol Boat Product Line Surface Forces Logistics Center 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
USCGC KINGFISHER (WPB-87322) DRYDOCK AVAILABILITY 2010
Page i (Rev 0)
TABLE OF CONTENTS
Work Item Title Page
List of Sketches iv
Revisions Record v
List of Applicable References vi
List of Government-furnished Property xii
List of Critical Inspection Items xiv
Specification Feedback xv
Principal Characteristics xvi
General Requirements 1
1 Perform Ultrasonic Thickness Measurements (D) 9
2 Perform Ultrasonic Thickness Measurements (O) 11
3 Perform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) (O) 13
4 Clean and Inspect Dirty Oil Tank (D) 16
5 Clean and Inspect Oily Water Tank (D) 18
6 Clean and Inspect Fuel Service Tanks (D) 20
7 Clean and Inspect Grey Water Tank (D) 22
8 Clean and Inspect Sewage Tank (D) 25
9 Clean Grey Water Piping System (D) 28
10 Clean Sewage Piping System (D) 32
11 Inspect Pilothouse Deck (D) 36
12 Inspect RHIB Notch Skid Pads (D) 38
13 Renew RHIB Notch Skid Pad Studs (O) 40
Page ii (Rev 0)
14 Realign Main Engine/Reduction Gear (O) 42
15 Remove, Inspect, and Reinstall Propeller Shafts (D) 45
16 Repair Shaft (O) 56
17 Straighten Shaft (O) 59
18 Renew Intermediate Water-Lubricated Shaft Bearing
(O) 61
19 Renew Aft Water-Lubricated Shaft Bearing (O) 64
20 Renew Intermediate Bearing Carrier (O) 66
21 Renew Aft Bearing Carrier (O) 68
22 Remove, Inspect, and Reinstall Propellers (D) 70
23 Perform Minor Repair and Recondition of Propeller
(O) 74
24 Renew Depth Indicating Transducer (D) 78
25 Renew Sea Valves and Inspect Associated Piping and Strainers (D) 81
26 Remove, Inspect, and Reinstall Rudder Assemblies (D) 85
27 Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D) 90
28 Preserve Underwater Body – “Partial” (O) 94
29 Preserve Underwater Body – “100%” (O) 98
30 Preserve Stern Tubes (O) 101
31 Modify and Renew Cathodic Protection System (D) 103
32 Renew Transducer Fairing (O) 106
33 Routine Drydocking (D) 108
34 Provide Temporary Logistics (D) 113
35 Renew Hatch Coamings 116
36 Preserve Bilge Surfaces in the Lazarette (D) 120
Page iii (Rev 0)
37 Modify and Preserve the Forepeak (EC 087-A-033) 123
38 Install Dirty Oil Tank Level Indicator (EC 087-B-
039) (D) 134
39 Preserve Main Deck Surfaces (D) 154
40 Preserve Freeboard – 100% (D) 157
41 Renew HVAC System Sea Water Cooling Pipe Tree (D) 160
Page iv (Rev 0)
List of Sketches
Work Item Sketch Number Page
This section is not applicable to this package.
Page v (Rev 0)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.
Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page vi (Rev 0)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
MIL-A-18001, Aug 2008, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-PRF-16173, Jan 1993, Corrosion Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-24139, Mar 1987, Grease, Multipurpose, Water Resistant
MIL-PRF-24647, Feb 2005, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-1687, Sep 1994, Thermal Spray Processes For Naval Ship Machinery Application
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp�
Page vii (Rev 0)
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust-Petrolatum
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 6341_STD, 2004 Edition, Renew Deck Covering Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 1001_STD, 2004 Edition, Temporary Hull Accesses
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Code of Federal Regulations (CFR) Title 29, Part 1915, Subpart E, Jul 2004, Scaffolds, Ladders and Other Working Surfaces
DRAWINGS
Coast Guard Drawing 87 WPB 085-003, Rev C, Docking Plan
Coast Guard Drawing 87 WPB 085-010, Rev C, Docking Plan
Coast Guard Drawing 87 WPB 085-011, Rev B, Lifting Slings
Coast Guard Drawing 87 WPB 085-012, Rev-, Lifting Cradle
Page viii (Rev 0)
Coast Guard Drawing 87 WPB 111-001, Rev D, Shell Expansion
Coast Guard Drawing 87 WPB 113-001, Rev D, Platform Plating & Framing
Coast Guard Drawing 87 WPB 131-001, Rev H, Deck Construction Plan
Coast Guard Drawing 87 WPB 131-002, Rev-, Forepeak Void New Watertight Flat
Coast Guard Drawing 87 WPB 151-001, Rev H, Structural Details
Coast Guard Drawing 87 WPB 161-002, Rev-, Stern Tube Details Anode Access Ports
Coast Guard Drawing 87 WPB 163-001, Rev F, Sea Chest Details
Coast Guard Drawing 87 WPB 165-001, Rev D, Transducer Details
Coast Guard Drawing 87 WPB 167-002, Rev A, CG Schedule Of Doors, Manholes, Windows & Hatches
Coast Guard Drawing 87 WPB 182-001, Rev A, Main Engine and Generator Foundations
Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details
Coast Guard Drawing 87 WPB 245-002, Rev-, Propeller Details
Coast Guard Drawing 87 WPB 245-003, Rev A, Propeller Details
Coast Guard Drawing 87 WPB 252-001, Rev D, Pilothouse Console Arrangement
Coast Guard Drawing 87 WPB 252-002, Rev K, Alarm & Monitoring System
Coast Guard Drawing 87 WPB 256-001, Rev T, Deck Construction Plan
Coast Guard Drawing 87 WPB 256-001, Rev T, Sea Water Cooling Piping
Coast Guard Drawing 87 WPB 302-001, Rev P, Misc. Controls Wiring Diagram, sheets 1, 2, 3, 36, 39, & 42
Coast Guard Drawing 87 WPB 304-001, Rev C, Wireway Arrangement
Page ix (Rev 0)
Coast Guard Drawing 87 WPB 304-001, Rev C, Wireways Arrangement
Coast Guard Drawing 87 WPB 437-004, Rev B, Tank Level Indication System
Coast Guard Drawing 87 WPB 506-002, Rev E, Vent Fills and Sounds Piping
Coast Guard Drawing 87 WPB 526-001, Rev H, Scuppers & Deck Drains Piping
Coast Guard Drawing 87 WPB 529-001, Rev E, Bilge Piping
Coast Guard Drawing 87 WPB 561-001, Rev G, Steering System Details
Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details
Coast Guard Drawing 87 WPB 581-002, Rev-, Anchor Handling & Hawse Pipe Details
Coast Guard Drawing 87 WPB 583-001, Rev K, RHIB Deployment Structure
Coast Guard Drawing 87 WPB 583-001, Rev N, RIB Deployment Structure
Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping
Coast Guard Drawing 87 WPB 601-001, Rev F, Outboard Profile, General Arrangements
Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Coverings and Details
Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details
Coast Guard Drawing FL 6713-201, Rev B, Transducer adapter assembly
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Page x (Rev 0)
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Technical Publication (TP) 4506, Wartsila TM-EL- 68839, Issue A, Mar 2005, Rudderstock Seal Type EL
Coast Guard Technical Publication (TP) 4593C, Feb 2002, SWBS 243, Manufacturer's Instruction Book, 87' WPB Propulsion Shaft Seals, John Crane Type F.S.E.
Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange mounted BW 255
INDUSTRY STANDARDS
American Bureau of Shipping (ABS), 2, Rules for Survey After Construction, 2008, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2004, Brush-Off Blast Cleaning
Page xi (Rev 0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting
International Organization for Standardization (ISO), 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of diameter between 0.80 and
2.50 m, Inclusive
International Organization for Standardization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Page xii (Rev 0)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WOR
K
ITE
M
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
Y Alignment Kit N/A 1 ea. 5,000.00 N **Propeller shaft NSN: 2010-01-458-9175 2 ea. 9,566.14 N Type FSE Face (split) PN: H75440-01-2-2
NSN: 5330-01-521-3559 2 ea. 1,995.07
N Type FSE Seal (split) PN: H75440-01-1-1 NSN: 2040-01-521-2654 2 ea. 4,070.35
N Type FSE Seal Cup (split) PN: H75440-01-1-3 NSN: 3120-01-521-2390 2 ea. 188.24
N Type FSE O-Cord PN: H75440-01-1-4 NSN: 3120-01-521-2268 2 ea. 252.84
N Type FSE Emergency Seal PN: H75440-01-3-6 NSN: 5330-01-521-4855 2 ea. 260.92
N **Shaft Seal Bellow PN: H75440-01-2-1 NSN: 5340-01-521-3573 2 ea. 270.45
N *Compression Tool Assembly N/A 1 ea. 200.00 N *Alignment Kit N/A 1 set 3,000.00
N
**Thordon bearing, Grade Orange (5.5" OD x 4" ID x 7.87" (200mm) LG)
PN: F54615-02-8-1
NSN: 3120-21-914-2012 2 ea. 325.47
N
**Thordon bearing, Grade Orange (5.5" OD x 4" ID x 11.41" (290mm) LG)
PN: F54615-02-8-0
NSN: 3120-21-914-2011 2 ea. 399.50
Y **Starboard Propeller (RH) PN: RH706-3350.00 NSN: 2010-01-457-0573 1 ea. 12,498.00
Y **Port Propeller (LH) PN: LH706-3350.00 NSN: 2010-01-459-0421 1 ea. 12,498.00
N *Propeller Nut Wrench N/A 1 ea 200.00 N Propeller Nut NSN: 2010-01-458-9217 2 ea. 281.00 N Propeller Nut, Locking NSN: 5310-01-458-9125 2 ea. 252.94 N Anode, Propeller Nut NSN: 5342-01-481-8403 2 ea. 272.00 N ***Airmar Depth Sounder
Transducer PN: E660151/31-811-5-01 1 ea. 149.45
Y **Rudder Assembly, port NSN: 2040-01-461-1944 1 ea. 2,000.00 Y **Rudder Assembly, starboard NSN: 2040-01-461-1943 1 ea. 2,000.00 N Upper Roller Bearing NSN: 3110-01-512-5534 2 ea. 244.62 N Wartsila EL Seals Kit NSN: 2040-01-565-9776 2 ea. 6300.00 N Relief Fittings P/N: 1093K21 2 ea. 7.57 N SS Grease Fittings P/N: 1293K32 6 ea. 4.16 N *Transducer cover plate N/A 1 ea. 149.50
Page xiii (Rev 0)
WOR
K
ITE
M
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
N 24” x 24” QA Raised Hatch Coaming Fabricated by ISC Miami 3 ea. 1,300.00
N 24” x 24” QA Flush Hatch PN: 2424-H[K] (Freeman Marine) 1 ea. 3,566.50
N 18” Round Aluminum Manhole with SS Deck Ring
PN: 2404-0005 (Freeman Marine) 1 ea. 1,300.00
N Flash ROM Assembly NSN: 6320-01-F09-1474 PN: 9702Z0030-1 1 ea $162.39
N Signal Conditioner NSN:5895-01-470-5302 PN: 112300 1 ea $187.00
N Transmitter, liquid, quantity NSN:6680-01-537-6489 PN: 602120 1 ea $499.00
N Meter, Dirty Oil Tank NSN:6320-01-F09-1473 PN: CDT4A00101 1 ea $826.00
N Cooling Water Tree Assembly n/a 1 ea $800 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page xiv (Rev 0)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
1 Perform Ultrasonic Thickness Measurements (D)
2 Perform Ultrasonic Thickness Measurements (O)
11 Inspect Pilothouse Deck (D)
12 Inspect RHIB Notch Skid Pads (D)
15 Remove, Inspect, and Reinstall Propeller Shafts (D)
25 Renew Sea Valves and Inspect Associated Piping and Strainers (D)
26 Remove, Inspect, and Reinstall Rudder Assemblies (D)
27 Remove, Inspect, and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and washers (D)
30 Preserve Stern Tubes (O)
37 Modify and Preserve the Forepeak (EC 087-A-033)
Page xv (Rev 0)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.
All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/defaul t.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm� http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm� http://www.uscg.mil/mlclant/vdiv/specfeedback.asp�
Page xvi (Rev 0)
PC_87_WPB
(21 Mar 2005)
Principal Characteristics
87' WPB Coastal Patrol Boat
Length Overall 87' 0"
Depth (main deck at frame 13 side to baseline) 10' 11"
Maximum Beam 19.4'
Height of Highest Projection (above DWL) 50.2'
Frame Spacing Various
Full Load Draft 5' 9"
Full Load Displacement 93.5 long tons
Shore Tie Voltage Requirements 450v
PROPELLERS / SHAFT
Number of Propellers 2
Number of Blades per Propeller 5
Diameter of Propeller 1040 mm
Pitch 1230 mm fixed
Revolutions per Minute (RPM) 828
Shaft Diameter 4"
Page 1 (Rev 0)
00000_DLA_FLT (23 Oct 2008)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
Page 2 (Rev 0)
3.2 Contractor-provided fire watch personnel. The Contractor
shall provide fire watch personnel and equipment.
WARNING!
Prior to performing welding, Ship’s Force will take precautions to isolate all electronic equipment installed on the cutter from welding current. Do not perform welding until proper isolation has been verified.
3.3 Welding and brazing requirements. The Contractor shall
perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.
3.5 Small boat storage. When a small boat (Motor Surf Boat
(MSB)/Motor Cargo Boat (MCB)/Rigid Hull Inflatable (RHI) boat) is removed as interference to Contractor-work, the Contractor shall provide a suitable pier side storage cradle, for safely storing said boat.
3.5.1 Cradle design. Ensure that the temporary cradle meets
the following criteria:
1. Structure is templated from the geometry and arrangement of the contact support areas of the existing cradle onboard the vessel, to provide same or more support area as that which is provided by the existing cradle.
2. Arrangement will allow ship's force to perform maintenance on the small boat, without modification of the cradle.
3. Structure is manufactured using the most economical methods and materials available, and is capable of supporting the full weight of the small boat under normal conditions experienced during routine maintenance.
4. Contact surfaces are no harder or rougher than the contact surfaces for existing cradle onboard the vessel.
Page 3 (Rev 0)
3.5.2 Boat accessibility. Ensure the storage is located in the vicinity of the vessel, and is unrestricted, to allow for ship's force to complete maintenance during normal working hours for the entire performance period.
3.5.3 Boat protection. Provide full protection that can be
safely and completely secured when the small boat is left unattended (e.g. watertight cover, storage in a warehouse or shop, etc.), in addition to isolating the boat from the elements.
3.5.4 Boat transportation. Transport each small boat to its
storage area within one week of docking the vessel and back to the vessel prior to the end of the performance period.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may
be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.
http://www.uscg.mil/directives/cim.asp�
Page 4 (Rev 0)
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 - COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 - STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 - TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 - FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @
77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 - RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
Page 5 (Rev 0)
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc?)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 6 (Rev 0)
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
• Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 7 (Rev 0)
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 8 (Rev 0)
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 9 (Rev 0)
11000_087(6 November 2009)
WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform 250 thickness measurements (UT shots) of hull plating and frames, by ultrasonic methods.
1.1.1 Areas that have been pre-determined to require testing.
None
1.2 Government-furnished property.
None.2. APPLICABLE DOCUMENTS
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
Coast Guard Drawing 87 WPB 113-001, Rev D, Platform Plating & Framing3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph:
• 3.2 (Thickness measurement particulars).
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work may include, but are not limited to the following:
• Grating and hardware.
• Wiring.
• Wiring hangers.
• False bulkheads.
• Piping.
• Pipe hangers.
Formatted: Normal, No widow/orphan control, Tabs: 50.4 pt, Left + 165.6 pt, Left + 223.2 pt, Left + 280.8 pt, Left + 338.4 pt, Left + 396 pt, Left + 453.6 pt, Left + 511.2 pt, Left + 568.8 pt, Left +
626.4 pt, Left + 684 pt, Left +
741.6 pt, Left + 799.2 pt, Left +
856.8 pt, Left + 914.4 pt, Left + 972 pt, Left + 1029.6 pt, Left
Page 10 (Rev 0)
• Valves.
• Framing.
• Deck plates.
• Water manifold.
• Hydraulic unit.
• Hoses.
• Hydraulic fluid.
3.2 Thickness measurement particulars. Using Coast Guard
drawing 87 WPB 113-001 as guidance, the Contractor shall perform 250 ultrasonic thickness measurements of hull and hull frame surfaces, in various locations designated by the Coast Guard Inspector (see paragraph 1.1.1 above for possible pre-determined locations). Submit a CIR. Ensure that the ultrasonic apparatus, procedure requirements, and report shall be in accordance with ASTM E797, and the report results shall additionally include the following, for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
3.3 Apparatus Standardization. The Contractor shall perform
ultrasonic equipment standardization in accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Technical Hazards).
3.4 Insulation and sheathing renewal. The Contractor shall
renew all disturbed insulation and sheathing.4. NOTES
This section is not applicable to this work item.
Page 11 (Rev 0)
11000_087(6 November 2009)
WORK ITEM 2: Perform Ultrasonic Thickness Measurements (O)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform up to 25 thickness measurements (UT shots) of hull plating and frames, by ultrasonic methods.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
Coast Guard Drawing 87 WPB 113-001, Rev D, Platform Plating & Framing3.
REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph:
• 3.2 (Thickness measurement particulars).
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work may include, but are not limited to the following:
• Grating and hardware.
• Wiring.
• Wiring hangers.
• False bulkheads.
• Piping.
• Pipe hangers.
Page 12 (Rev 0)
• Valves.
• Framing.
• Deck plates.
• Water manifold.
• Hydraulic unit.
• Hoses.
• Hydraulic fluid.
3.2 Thickness measurement particulars. After a Change Request has been release by the KO, using Coast Guard drawing 87 WPB 113-001 as guidance, the Contractor shall perform one or more, as specified in the Change Request, lots of 25 ultrasonic thickness measurements of hull and hull frame surfaces, in various locations designated by the Coast Guard Inspector.
Submit a CIR. Ensure that the ultrasonic apparatus, procedure requirements, and report shall be in accordance with ASTM E797, and the report results shall additionally include the following, for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
3.3 Apparatus Standardization. The Contractor shall perform
ultrasonic equipment standardization in accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Technical Hazards).
3.4 Insulation and sheathing renewal. The Contractor shall
renew all disturbed insulation and sheathing.
4. NOTES
Page 13 (Rev 0)
1100_TEF_ERODED_STL_WELD _87 (30 Oct 2008) 87355_TEF (30 Oct 2009)
WORK ITEM 3: Perform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) (O)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew up to 8 linear feet of eroded steel welds in various compartments.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Piping.
• Wiring.
• Frames.
• Deck plates.
Page 14 (Rev 0)
• Grating.
• HPU Unit.
• Strainers.
• Bilge floats.
• Valves.
• Water manifold.
• Work bench.
• Pump foundations.
• Lagging.
3.1.2 Renewal particulars. The Contractor shall renew up to 8 linear feet of eroded steel welds, as designated by the Coast Guard Inspector. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec
0740_STD.
3.2 Electronic equipment protection. The Contractor shall
safeguard electronic equipment before welding to prevent damage from stray current and electromagnetic interference.
Electrically isolate or disconnect ungrounded or sensitive equipment as necessary. Locate all welder ground connections as close to the work as possible.
3.3 Touch-up preservation. The Contractor shall prepare and
coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
NOTICE!
Surfaces being preserved are considered "critical-coated surfaces".
3.4 Insulation and sheathing renewal. The Contractor shall
renew all disturbed sheathing and insulation. Paint newly installed insulation systems, as applicable, in accordance with COMDTINST M10360.3, using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in Appendix B (Cutter and Boat Interior Paint Systems).
Page 15 (Rev 0)
4. NOTES
4.1 Electronic equipment protection. The Coast Guard Inspector will accomplish the following prior to welding:
• Secure wheelhouse power supply to the ODR, MCS, and RCS systems.
• Secure engine room power supply to the GCU and CCS box.
• Disconnect all cannon plugs to the main engine governors
(ECS-UNI).
• Remove all PIMS on MTU control systems.
• Disconnect all power to the Bridge electronics.
• Secure power to the battery chargers.
• Disconnect engine room batteries.
Page 16 (Rev 0)
12310_DLA_FLT (10 Sept 2008) 87 WPB (27 May 2008)
WORK ITEM 4: Clean and Inspect Dirty Oil Tank (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank:
TYPE OF TANK LOCATION CAPACITY
(GALLONS)
Dirty Oil Port Centerline 85
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 Operational test – initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs (oily water tank) to demonstrate existing operational condition. Submit a
CFR.
3.2 Cleaning requirements. The Contractor shall remove tank
cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.3 Tank content and waste disposal. The Contractor shall
Page 17 (Rev 0) dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.
3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
• Oily water tank - Tank Level Indicator (TLI) and/or float switch condition.
• Sounding tube and striker plate condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
• Strainers – verify that strainers are not touching the hull or tank bhds.
3.5 Tank closing. After satisfactory inspection by the Coast
Guard Inspector, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
3.6 Operational test – final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLI(s) to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational tests.
Page 18 (Rev 0)
12310_DLA_FLT (10 Sept 2008) 87 WPB (27 May 2008)
WORK ITEM 5: Clean and Inspect Oily Water Tank (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank:
TYPE OF TANK LOCATION CAPACITY
(GALLONS)
Oily Water (coated)
Stbd Centerline 85
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 Operational test – initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs (oily water tank) to demonstrate existing operational condition. Submit a
CFR.
3.2 Cleaning requirements. The Contractor shall remove tank
cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean
3.3 Tank content and waste disposal. The Contractor shall
Page 19 (Rev 0) dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.
3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
• Oily water tank - Tank Level Indicator (TLI) and/or float switch condition.
• Sounding tube and striker plate condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
• Strainers – verify that strainers are not touching the hull or tank bhds.
3.5 Tank closing. After satisfactory inspection by the Coast
Guard Inspector, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
3.6 Operational test – final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLI(s) to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
Page 20 (Rev 0)
12312_DLA_FLT (10 Sept 2008) 87 WPB (27 May 2008)
WORK ITEM 6: Clean and Inspect Fuel Service Tanks (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tanks:
TYPE OF TANK LOCATION CAPACITY
(GALLONS)
Diesel fuel Stbd, 3-9-1-F 1450 Diesel fuel Port, 3-9-2-F 1450
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 Operational test - initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
NOTICE!
Vessel may come in with less tank fluid contents than specified above.
3.2 Cleaning requirements. The Contractor shall remove tank
cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the tank level indicators (TLIs). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean
Page 21 (Rev 0)
3.3 Tank content and waste disposal. The Contractor shall
dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.
3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Tank level indicators (TLIs).
• Sounding tube and striker plate condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel, 5/16” or 3/8” screws).
• Strainers – verify that strainers are not touching the hull or tank bhds.
3.5 Tank closing. The Contractor shall ensure that the tanks
remain open for approximately 24 hours after completion of all authorized repair and preservation procedures. Notify the COTR at least 24 hours prior to closing the tanks. After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
3.6 Operational test - final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
Page 22 (Rev 0)
12318_DLA_FLT (10 Sept 2008) 87 WPB (05 Sept 2008)
WORK ITEM 7: Clean and Inspect Grey Water Tank (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the below designated tank:
TYPE OF TANK LOCATION CAPACITY
(GALLONS)
Grey Water (stainless steel, uncoated)
Below Hold Deck between Frames 8 and 9, 3-7-1-W
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Stateroom berthing locker.
• Piping.
• Tank level indicator (TLI).
3.2 Cleaning requirements. The Contractor shall do the
following for the designated tank listed in paragraph 1.1:
3.2.1 Operational test - initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by
Page 23 (Rev 0)
Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
3.2.2 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations.
3.2.3 Cleaning requirements. Remove manhole cover(s). Clean
the designated structure's interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the TLI. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.2.4 Inspection. Visually inspect all interior surfaces;
including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Tank level indicator (TLI).
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
3.3 Closing. The Contractor shall ensure that the tank remains open for approximately 24 hours after completion of the tasks specified above. Notify the COTR at least 24 hours prior to closing the tank. After satisfactory inspection by the Coast Guard Inspector and after authorized repairs, if any, reinstall manhole cover(s) with new gasket material conforming to ASTM D1330.
3.4 Operational test - final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.
Page 24 (Rev 0)
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
Page 25 (Rev 0)
12319_DLA_FLT (10 Sept 2008) 87 WPB (05 Sept 2008)
WORK ITEM 8: Clean and Inspect Sewage Tank (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the below designated tank:
TYPE OF TANK LOCATION CAPACITY
(GALLONS)
Sewage (stainless steel, uncoated)
Hold Deck between Frames 6 and 8, 3-7-0-W 363
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Pump.
• Piping.
3.2 Cleaning requirement. The Contractor shall do the
following for the designated tank listed in paragraph 1.1:
3.2.1 Operational test - initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
Page 26 (Rev 0)
3.2.2 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations.
3.2.3 Cleaning requirements. Remove manhole cover(s). Clean
the designated structure's interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the tank level indicator (TLI). Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths.
Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.2.4 Inspection.