Spec 627 DS Rev 1.pdf
PDF 494 KB Posted
- Attached to
- Dockside Repairs to USCGC VIGOROUS (WMEC-627)
- Solicitation number
- HSCG80-09-Q-3FA744
About this file
Specification dated 2/5/09 Rev 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 01 Vigorous.pdf | ||
| Solicitation Vigorous DS Repairs.pdf | ||
| Spec 627 DS Rev 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC VIGOROUS (WMEC-627)
210 FOOT B CLASS MEDIUM ENDURANCE CUTTER
SPECIFICATION FOR DOCKSIDE REPAIRS
Developed By:
LTJG Dan Kahn
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
(Feb 05/ Rev-1)
USCGC VIGOROUS (WMEC-627) DOCKSIDE AVAILABILITY 2009
TABLE OF CONTENTS
Work Item Title Page
List of Sketches iii
Revisions Record iv
List of Applicable References v
List of Government-furnished Property x
List of Critical Inspection Items xi
Specification Feedback xii
Principal Characteristics xiii
General Requirements 1
1 Renew CMWDS and Firemain Valves 8
2 Install New Deck Covering System(s) 12
3 Renew Engine Room Sheathing and Piping Insulation 15
4 Overcoat Designated Bilge Surfaces - Pier Side 18
5 Remove Unused Skin Valves 22
6 Renew Laundry Room Bulkhead 25
7 Renew Door 28
8 Renew Partitions 31
9 Clean and Hydrostatically Test Hydro-Pneumatic Tanks 33
10 Repair Hot Water Tank Foundation 37
11 Clean and Inspect Heat Exchangers 39
12 Modify Welin Lambie TW PIV 5.0B Davit Arrangement 43
13 Modify RHIB Cradle and Strengthen the Davit Supporting Structure 48
Page i (Rev-1)
14 Renew and Weight Test Shipboard Davit Crane (Allied Marine Crane Model D5700CT) 50
15 Renew Single Point Davit Control Stand 53
16 Clean Galley, Engine Room, and Laundry Ventilation Systems 55
17 Clean Shipboard Ventilation Systems 58
18 Renew Ventilation Ducting 61
19 Overhaul Stack Dampener 64
Page ii (Rev-1)
List of Sketches
Work Item Sketch Number Page
5 MLCA Sketch 627 WMEC 07400-001 24
10 MLCA Sketch 627 WMEC 55110-001 38
12 MLCA Sketch 627 WMEC 58310-001 46
12 MLCA Sketch 627 WMEC 58310-002 47
18 MLCA Sketch 627 WMEC 51210_001 62
Page iii (Rev-1)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.
Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
05Feb09 1 GFP Changed Single Point Davit and Hook from
WI #12 to WI #14
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page iv (Rev-1)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
Commercial Item Description (CID) A-A-59588, Jul 2005, Rubber Silicone
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems
Page v (Rev-1) http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 5100_STD, 2004 Edition, Clean Shipboard Ventilation Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 6341_STD, 2004 Edition, Renew Deck Covering Systems
DRAWINGS
Coast Guard Drawing 627 WMEC 122-001, Rev D, Transverse Watertight Bulkheads FWD & AFT Midships
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second & Main Deck Plating & Supports
Coast Guard Drawing 627 WMEC 136-003, Rev -, Structural Mods Incidental to SPD/RHIB Replacement
Coast Guard Drawing 627 WMEC 167-001, Rev K, Schedule of Steel Doors, Hatches, Scuttles & Manholes
Coast Guard Drawing 627 WMEC 512-010, Rev G, Arrangement Vent & Air Conditioning Second Deck
Coast Guard Drawing 627 WMEC 512-011, Rev H, Arrangement Vent & Air Conditioning Main Deck
Coast Guard Drawing 627 WMEC 512-012, Rev D, Arrangement Vent & Air Conditioning 01 Deck
Coast Guard Drawing 627 WMEC 512-013, Rev E, Arrangement Vent & Air Conditioning 02 Deck and Above
Coast Guard Drawing 627 WMEC 512-029, Rev-, Arrangement Ventilation & Air Conditioning Second Deck
Coast Guard Drawing 627 WMEC 512-001, Rev D, Ventilation Equipment List
Coast Guard Drawing 627 WMEC 512-002, Rev D, Vent Weather Covers and Louvers
Coast Guard Drawing 627 WMEC 512-005, Rev C, Ventilation Diagram Third Deck
Coast Guard Drawing 627 WMEC 512-006, Rev D, Ventilation Diagram Second Deck
Page vi (Rev-1)
Coast Guard Drawing 627 WMEC 512-007, Rev D, Ventilation Diagram Main Deck
Coast Guard Drawing 627 WMEC 512-008, Rev D, Ventilation 01 Deck & Above
Coast Guard Drawing 627 WMEC 513-001, Rev C, Ventilation Arrangement Machinery Spaces
Coast Guard Drawing 627 WMEC 521-001, Rev B, Diagram Firemain, Sprinkling & Washdown
Coast Guard Drawing 627 WMEC 521-002, Rev F, Arr. Of Firemain, Sprinkling & Washdown System Main Deck & Above
Coast Guard Drawing 627 WMEC 521-003, Rev F, Arr. Of Firemain, Sprinkling & Washdown System 2nd Dk & Below
Coast Guard Drawing 627 WMEC 530-002, Rev -, 30” O.D. x 72” Vert Hot Water Storage Heater for US GOV’T
Coast Guard Drawing 627 WMEC 533-001, Rev E, 19 AUG 2002, Diagram Hot& Cold Potable Water System
Coast Guard Drawing 627 WMEC 533-007, Rev A, Reverse Osmosis Declinator Arrangement & Details
Coast Guard Drawing 627 WMEC 536-53, Rev -, Heat Exchangers
Coast Guard Drawing 627 WMEC 583-040, Rev F, OTHB Davit-Davit Arrangement
Coast Guard Drawing 627 WMEC 583-041, Rev D, OTHB Davit-Davit Installation
Coast Guard Drawing 627 WMEC 601-004, Rev C, General Arrangemnet Main and 01 Decks
Coast Guard Drawing 627 WMEC 634-001, Rev D, Deck Coverings
Coast Guard Drawing 627 WMEC 635-003, Rev B, Insulation & Sheathing in Machinery Spaces
Coast Guard Drawing 627 WMEC 644-003, Rev D, Sanitary Partitions
Coast Guard Fleet Drawing FL-3801-67, Rev B, Ventilation, Installation and Details, Sheets 1 through 10 of 50 (General Notes - Ductwork) and Sheet 39 of 50 (Handholes for W.T. & N.W.T. Ducts)
Page vii (Rev-1)
Fleet Drawing FL-2605-038, Rev A, Welin Lambie 5.0B RHI Cradle End Pads
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details
NAVSEA Drawing 804-5959212, 19 Feb 1985, Surface Ship Machinery, Insulation, Installation Details
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Technical Publication (TP) 3485A, Section 583-A, Oct 2008, Boat Davit, Single Point - Models D5000CT And D5700CT
Coast Guard Technical Publication (TP) 3903, July 2002, SWBS 233, Section A, Diesel Engine Overhaul/Maintenance Procedure Matrix – ALCO Model 251
INDUSTRY STANDARDS
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002, Butterfly Valves
Page viii (Rev-1)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
Page ix (Rev-1)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM MTI ITEM
DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
7 N
66” x 22” Quick-Acting Watertight Door W/8-dogs, LH
2040-00-912-5778 2 ea. 2,675.51
14 Y RHI Single Point Davit
Model: Allied
D5700CT 1 80,000.00
14 N Hook NSN: 4030 01 467 1005 1 400.00
15 N Control Stand PN: 58-672 1 ea. 20,600.00 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page x (Rev-1)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
2 Install New Deck Covering System(s)
4 Overcoat Designated Bilge Surfaces - Pier Side
6 Renew Laundry Room Bulkhead
9 Clean and Hydrostatically Test Hydro-Pneumatic Tanks
19 Overhaul Stack Dampener
Page xi (Rev-1)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.
All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/defaul t.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xii (Rev-1) http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
PC_210 A&B WMEC
(07 Jan 2004)
Principal Characteristics
210 (A & B Class) Medium Endurance Cutter
Length Overall 210' 6"
Depth (main deck at side to baseline) 19' 6"
Maximum Beam 34' 0"
Height of Highest Projection (above DWL) 88'0"
Frame Spacing 1' 0"
Full Load Draft 10' 6"
Full Load Displacement 1000 long tons
Shore Tie Voltage Requirements 400A/440V
PROPELLERS / SHAFT
Number of Propellers 2
Number of Blades per Propeller 4
Diameter of Propeller 7' 6"
Pitch controllable
Revolutions per Minute (RPM) 300
Shaft Diameter 8.25"
Page xiii (Rev-1)
00000_PWB_FLT (08 Apr 2008)
General Requirements
1. SCOPE
1.1 Scope. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor
shall provide portable fire extinguishers.
3.3 Welding and brazing requirements. The Contractor shall
perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's
Page 1 (Rev-1)
Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may
be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.
Page 2 (Rev-1) http://www.uscg.mil/directives/cim.asp
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 - COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 - STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 - TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 - FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @
77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 - RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
Page 3 (Rev-1)
QA-2: QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc?)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 4 (Rev-1)
QA-3: QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
• Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 5 (Rev-1)
QA-4: QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 6 (Rev-1)
QA-5: QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 7 (Rev-1)
52100_DLA_FLT (18 Mar 2008) S52110_DNK_627(22 Sep 2008)
WORK ITEM 1: Renew CMWDS and Firemain Valves
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the below-designated CMWDS and Firemain valves.
TYPE SIZE
(INCHES) MATERIAL DESCRIPTION
FRAME
LOCATION/
VALVE NO
CONNECTION
RATED
PRESSURE
CLASS (#)
Gate 2.5 Brass CMWDS Isolation 1-141-1 4 Bolt Double Flanged
Gate 2 Brass CMWDS Isolation 1-151-1 4 Bolt Double Flanged
Gate 2.5 Brass CMWDS Isolation 1-64-1 4 Bolt Double Flanged
Gate 2.5 Brass CMWDS Isolation 1-31-1 4 Bolt Double Flanged
Gate 2 Brass CMWDS Isolation 02-80-2 Double Female Brazed
Gate 2.5 Brass Fire Plug 01-114-2 4 Bolt Single Flanged
Gate 2.5 Brass Fire Plug 01-114-1 4 Bolt Single Flanged
Gate 1.5 Brass Fire Plug 1-21-1 Threaded Double Female
Gate 1.5 Brass Fire Plug 2-76-0 4 Bolt Single Flanged
Page 8 (Rev-1)
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Coast Guard Drawing 627 WMEC 521-001, Rev B, Diagram Firemain, Sprinkling & Washdown
Coast Guard Drawing 627 WMEC 521-002, Rev F, Arr. Of Firemain, Sprinkling & Washdown System Main Deck & Above
Coast Guard Drawing 627 WMEC 521-003, Rev F, Arr. Of Firemain, Sprinkling & Washdown System 2nd Dk & Below
3. REQUIREMENTS
3.1 General.
Page 9 (Rev-1)
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Piping.
• Insulation.
3.2 Removal. The Contractor shall remove all designated valves in Section 1.1. Immediately after valve removal, install the appropriate replacement valve. Use Coast Guard Drawing 627 WMEC 521-001, 521-002, and 521-003 as guidance.
3.3 Renewal. The Contractor shall renew all designated with
commercial-standard type valves, conforming to the applicable standard listed in Table I (Valve Standards).
TABLE I. VALVE STANDARDS
VALVE TYPE INDUSTRY STANDARD
Steel Valves MSS SP-61 Butterfly Valve MSS SP-67 Ball Valves, Flanged or Butt-Welded Ends MSS SP-72
Bronze Gate, Globe, Angle and Check Valves
MSS SP-80
All others ASME B16.34
NOTICE!
The Contractor shall replace any mil-std valves listed for renewal with equivalent commercial standard valves.
3.4 Valve reinstallation/installation. Upon completion of all authorized work, the Contractor shall accomplish the following:
• Remove and dispose of all blank flanges and associated gaskets.
• Reinstall/install all new valves with new flange gaskets with neoprene rubber.
• Renew all missing or damaged valve label plates.
• Renew all bolting hardware.
Page 10 (Rev-1)
• Touch-up preserve all new and disturbed surfaces to match existing adjacent areas, in accordance with COMDTINST M10360.3. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
3.5 Valve labeling. The Contractor shall install valve label
plates on all new valves in accordance with ASTM F992.
3.6 Leak test. After all authorized repairs of mechanical
(i.e. threaded, bolted, etc.) joints, the Contractor shall perform an operational test of the firemain system using the system fluid at normal operating pressure. Be aware that no visible leakage or deformation is acceptable. Repair all leaks and discrepancies found. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
Page 11 (Rev-1)
S63410_DLA_SWIT (18 Mar 2008) S63410_DNK_627(22 Sep 2008)
WORK ITEM 2: Install New Deck Covering System(s)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to install new deck covering system in compartment 2- 99-0-L.
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 6341_STD, Renew Deck Covering Systems
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
Coast Guard Drawing 627 WMEC 634-001, Rev D, Deck Coverings
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
• 3.4 (Inspection)
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Deck drain(s).
Page 12 (Rev-1)
• Sink Foundations.
• Toilets.
• Showers.
3.2 Protective measures. The Contractor shall protect non-
affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in paragraph 3.11.4(Protective measures) in Std Spec
0000_STD.
3.3 Deck covering removal. The Contractor shall remove
existing terrazzo decking down to deck plating in compartment 2- 99-0-L.
3.4 Inspection. Upon the removal of the existing terrazzo
decking, the Contractor shall perform a total of 100 thickness measurements of the deck and bulkhead plating, in locations designated by the Coast Guard Inspector. Submit a CIR. If a Change Request has been authorized and released by the KO, the Contractor shall make repairs of the steel deck and bulkhead plating.
3.4.1 Ensure that the ultrasonic apparatus, procedure
requirements, and report shall be in accordance with ASTM E797, and that the report results shall additionally include the following information for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
3.4.2 Perform ultrasonic equipment standardization in
accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Technical Hazards).
3.5 Deck covering installation particulars. The Contractor
shall install the deck covering system(s), including associated cove base, in the space(s) specified in Table I below, in accordance with Std Spec 6341_STD and as shown on Coast Guard Drawing 627 WMEC 634-001.
3.5.1 Underlayment requirements. Install the new deck covering system(s) over new underlayment.
Page 13 (Rev-1)
TABLE I. DECKING SYSTEM PARTICULARS
COMPARTMENT
NAME/NUMBER
AREA
(*SQFT)
DECK MTL
(A/S**) DECKING SYSTEM TYPE
APPENDIX
(STD SPEC
6341_STD)
Head 2-99-0-L 64 S
Cosmetic Polymeric Epoxy Resin, Type III (One-Step Epoxy System)
S
*Approximated.
**Note: A = Aluminum.
S = Steel.
3.5.2 Deck covering color. Submit a deck covering color chart to Coast Guard Inspector, for the purpose of color selection.
4. NOTES
Page 14 (Rev-1)
S63700_DNK_627(02 Oct 2008)
WORK ITEM 3: Renew Engine Room Sheathing and Piping Insulation
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew sheathing and insulation throughout the engine room.
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Color Manual
Coast Guard Drawing 627 WMEC 635-003, Rev B, Insulation & Sheathing in Machinery Spaces
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
3. REQUIREMENTS
3.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Piping
• Wiring
Page 15 (Rev-1)
• Machinery
3.2 Sheathing Renewal. Remove and renew approximately 650
square feet of existing perforated aluminum sheathing for the engine room (4-108-0-E) designated by the Coast Guard Inspector.
Install perforated aluminum sheathing, clips, chromelock tape and rivets as shown on Coast Guard Drawing 627 WMEC 635-003.
Dispose of the removed materials in accordance with local, state, and federal regulations.
3.3 Insulation renewal. The Contractor shall renew the Boiler, SSDG, and MDE system piping insulation as designated in the table below.
APPROXIMATE PIPING INSULATION NEEDED
SYSTEM DIAMETER THICKNESS LINEAR FEET NEEDED
#1 BOILER STEAM 6” 1” 17’ 3”
#1 BOILER STEAM 10” 1” 3’ 1”
#1 SSDG JACKET
WATER 10” 1” 13’ 7”
#1 MDE LUBE OIL 8” 1” 5’ 2”
#1 MDE LUBE OIL 10” 1” 7’
#1 MDE JACKET
WATER 11” 1” 11’ 1”
#1 MDE JACKET
WATER 1’ 4” 1” 1’ 8”
#1 MDE JACKET
WATER 1’ 6” 1” 1’ 7”
#2 MDE LUBE OIL 1’ 1” 1” 11’ 6”
#2 MDE LUBE OIL 1’ 4” 1” 6’ 5”
#2 MDE JACKET
WATER 1’ 5” 1” 4’ 2”
#2 MDE JACKET
WATER 1’ 11” 1” 2’ 11”
#2 SSDG JACKET
WATER 10” 1” 13’ 7”
3.3.1 Removal. Remove all existing insulation material over
the designated piping, including associated pipe hangers, valves, fittings, and flanges. Dispose of all removed materials in accordance with all applicable Federal, state, and local regulations.
3.3.2 Surface preparation. Clean all exposed pipe and pipe
component surfaces, with a soft bristle brush and a mild detergent solution, to remove all visible surface contaminants.
3.3.3 Inspection. The Contractor shall inspect all exposed
piping for corrosion, holes, and all other damage. Submit CFR.
If a Change Request has been authorized and released by the KO, the Contractor shall make all necessary repairs.
Page 16 (Rev-1)
3.3.4 New insulation installation. Install new insulation
material over the exposed pipe surfaces, including associated pipe hangers, valves, fittings, and flanges, in accordance with details in NAVSEA Drawing 804-5959212; select appropriate insulation materials and thicknesses for the application and temperature ranges specified in ASTM F683, Tables S1.1 and 5.
Paint the newly installed insulation system, in accordance with COMDTINST M10360.3, using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in Appendix B (Cutter and Boat Interior Paint Systems).
3.4 Touch-up preservation. The Contractor shall prepare and
coat all new insulation surfaces in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
Page 17 (Rev-1)
S63142_DLA_SWIT (25 Jun 2008) S63142_DNK_627(22 Sep 2008)
WORK ITEM 4: Overcoat Designated Bilge Surfaces - Pier Side
1. SCOPE
1.1 Intent. This statement of work describes the requirements for the Contractor to overcoat the paint locker bilge surfaces while the vessel is waterborne.
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
• 3.3 (Ultrasonic thickness measurements).
Page 18 (Rev-1)
3.1.1 Protective measures. The Contractor shall protect non-
affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in paragraph 3.11.4(Protective measures) in Std Spec
0000_STD.
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Bilge level sensors.
• Piping.
• Deck plates.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the bilge level sensors to demonstrate existing operational condition. Submit a CFR.
3.3 Ultrasonic thickness measurement. The Contractor shall
perform a total of 100 thickness measurements of the paint locker hull plating, in locations designated by the Coast Guard Inspector. Submit a CIR.
3.3.1 Ensure that the ultrasonic apparatus, procedure
requirements, and report shall be in accordance with ASTM E797, and that the report results shall additionally include the following information for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
3.3.2 Perform ultrasonic equipment standardization in
accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Technical Hazards).
3.4 Overcoating procedures. The Contractor shall accomplish
the following overcoating procedures to the designated bilge areas (see paragraph 1.1).
3.4.1 Pre-surface preparation cleaning. Accomplish low-
pressure steam cleaning (less than 3,000 psi) of all affected surfaces to remove soluble chlorides and other surface
Page 19 (Rev-1) contaminants to achieve an SSPC-SP 1 condition. Collect wash water for proper disposal.
3.4.2 Surface preparation.
3.4.2.1 Machine tool damaged surfaces in which mechanical
damage extends into the substrate, or where there is evidence of corrosion to “bare” metal, in accordance with SSPC-SP 11 to produce a minimum 1.0 mil anchor profile. Locations shall be in accordance with Coast Guard Inspector instruction.
3.4.2.2 Roughen/abrade all surfaces where existing top-coating is intact with 100-grit paper to provide a suitable surface profile.
3.4.2.3 Feather edges of topcoating into adjacent bare areas to create a smooth transition.
3.4.2.4 Ensure that all power tools are vacuum-shrouded, to
reduce/eliminate dust or debris. Collect all dust and debris for proper disposal.
3.4.3 Post-surface preparation cleaning. Perform solvent
cleaning of all prepared surfaces, in accordance with SSPC-SP 1, prior to coating application. Collect all debris from solvent cleaning for proper disposal.
3.4.4 Coating application. Coat the designated bilge areas in accordance with COMDTINST M10360.3, using the system specified for “Bilges, Cofferdams, and Forepeaks, Steel, Option III, (Cutters and Boats Interior Painting Systems)”, and in accordance with the following:
3.4.4.1 Using a brush or roller, spot coat all bare areas with the specified system primer coating to a thickness matching that of the existing adjacent undercoating, ensuring that the primer coating extends over the feathered edges of the sound/intact coating to minimize edge lifting and provide a better appearance.
3.4.4.2 Using a brush or roller, apply the specified system top coat to all primed and abraded bilge surfaces to match the existing coating system; ensure a uniform thickness throughout.
NOTICE!
Coating application by brushing or rolling may require additional coats to obtain the required dry film thickness.
Page 20 (Rev-1)
3.5 Inspections. Before surface coating and after surface
preparation, the Contractor shall visually inspect the prepared substrate and submit a CFR.
3.6 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in Std Spec 0000_STD, paragraph titled “Preservation requirements – general”.
NOTICE!
Surfaces being preserved are considered “critical-coated surfaces”. See Std Spec 0000_STD.
3.7 Repair of un-intended damages. The Contractor shall repair all damages, including overspray, incurred to surfaces not covered by the scope of this work item, during surface preparation and paint application procedures.
3.8 Operational test – final. In the presence of the Coast
Guard Inspector, the Contractor shall thoroughly test and prove to be in satisfactory operating condition all disturbed sensors and other disturbed shipboard equipment (see 4.1 (Equipment operation)). Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all tests.
Page 21 (Rev-1)
S07400_DNK_627(22 Sep 2008)
WORK ITEM 5: Remove Unused Skin Valves
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove the designated valves and install hull plating inserts.
TYPE MATERIAL DESCRIPTION
FRAME
LOCATION/
VALVE NO
Gate Brass Distillate OVBD
COV 2-119-1
Gate Brass Brine OVBD COV 2-126-1
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0000_STD, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Coatings and Color Manual
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second & Main Deck Plating & Supports
Coast Guard Drawing 627 WMEC 533-007, Rev A, Reverse Osmosis Declinator Arrangement & Details
3. REQUIREMENTS
Page 22 (Rev-1)
3.1.1 Protective measures. The Contractor shall protect non-
affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in paragraph 3.11.4(Protective measures) in Std Spec
0000_STD.
3.1.2 Welding Requirements. The Contractor shall perform all
welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD.
3.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Perforated Metal Lagging
• Wiring
• R/O OVBD COV
• Feed Water System
3.3 Removal. The Contractor shall remove the valves designated in paragraph 1.1 and corresponding piping designated by the Coast Guard Inspector. Refer to CG Drawing 627 WMEC 533-007 and sketch below (See section 4.1) for further details.
3.4 Hull Plating Installation. The Contractor shall fabricate and install hull plating inserts using CG Drawing 627 WMEC 131- 001 as guidance.
3.5 Nondestructive inspection (NDI). The Contractor shall
perform NDI of all welds in accordance with Std Spec 0740_STD, Appendix C. Submit a CFR.
3.6 Touch-up preservation. The Contractor shall prepare and
coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs) of Std Spec 0000_STD.
3.8 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in Std Spec 0000_STD, paragraph titled “General preservation requirements”.
Page 23 (Rev-1)
Surfaces being preserved are considered “critical-coated surfaces”.
4. NOTES
4.1 Location of Valves. The following sketch shows the
approximate location of the skin valves. The Contractor may have to use a paint float or other means to access the skin of the ship.
Page 24 (Rev-1)
Valve Location on 2nd Deck.
Approx Waterline
MLCA SKETCH 627 WMEC 07400-001
S12000_DNK_627(23 Sep 2008)
WORK ITEM 6: Renew Laundry Room Bulkhead
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew a damaged section of bulkhead in the Laundry Room, compartment 1-20-0-Q.
1.2 Government-furnished property.
None
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0000_STD, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Coatings and Color Manual
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
Coast Guard Drawing 627 WMEC 122-001, Rev D, Transverse Watertight Bulkheads FWD & AFT Midships
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
• 3.2(Ultrasonic thickness measurement).
Page 25 (Rev-1)
3.1.2 Welding Requirements. The Contractor shall perform all
welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD.
3.1.3 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Insulation
• Deck Fittings
• Piping
• Racks and Lockers
• Deep Sink
• Washers
• Quarry Tile Deck
3.2 Ultrasonic thickness measurement. The Contractor shall
perform a total of 25 thickness measurements of the bulkhead and deck plating, in locations designated by the Coast Guard Inspector. Submit a CIR.
3.2.1 Ensure that the ultrasonic apparatus, procedure
requirements, and report shall be in accordance with ASTM E797, and that the report results shall additionally include the following information for each test point:
• Location.
• Original metal thickness.
• Measured metal thickness.
• Percent deterioration (calculation is based on the original metal thickness).
Page 26 (Rev-1)
3.2.2 Perform ultrasonic equipment standardization in
accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Technical Hazards).
3.2.3 The Contractor shall remove, at the COTR’s discretion, any quarry tile necessary to perform this inspection. The Contractor will furnish and replace any disturbed quarry tiles.
3.3 Removal. The Contractor shall crop out the damaged section (approximately 2 square ft) of the laundry room bulkhead as designated by the Coast Guard Inspector.
3.4 Renewal. The Contractor shall fabricate and weld-install a new section of metal for the designated section using Coast Guard Drawing 627 WMEC 122-001 as guidance.
3.5 Nondestructive inspection (NDI). The Contractor shall
perform NDI of all welds in accordance with Std Spec 0740_STD, Appendix C. Submit a CFR.
3.6 Surface preservation. The Contractor shall prepare and
coat all new and disturbed surfaces, including all adjacent structural members, using the system specified for “Bulkheads (Bulkheads and Overheads, Un-insulated Steel), Option I or II” in COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Select finish/top coat color to match existing adjacent surfaces. If surface preparation involves the removal of lead paint, ensure that no visible coatings remain on any part of the substrate, including pitted areas.
3.7 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in Std Spec 0000_STD, paragraph titled “General preservation requirements.”
Page 27 (Rev-1)
S16700D_SWIT(19 Apr 2005) S16700_DNK_627(19 Sep 2008)
WORK ITEM 7: Renew Door
1. SCOPE
1.1 Scope. This work item describes the requirements for the
Contractor to renew the following closures and associated frames:
FITTING LOCATION SIZE
QAWTD 1-126-1 26” X 66” LH (8-dog)
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
N
66” x 26” Quick- Acting Watertight Door W/8-dogs, LH
2040-00-912-5778 1 ea. 2,675.51
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2004 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Mar 2005, Coatings and Color Manual
Coast Guard Drawing 627 WMEC 167-001, Rev K, Schedule of Steel Doors, Hatches, Scuttles & Manholes
3. REQUIREMENTS
3.1 General.
Page 28 (Rev-1) http://isddc.dot.gov/OLPFiles/USCG/010968.pdf
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Sheathing
• Bulkhead insulation.
• Wire runs
3.1.2 Protective measures. The Contractor shall furnish and
install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work.
Upon completion of work, remove protective material and inspect for the presence of contamination as specified in paragraph 3.11.4(Protective measures) in Std Spec 0000_STD. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.3 Protective covering. The Contractor shall provide
protective covering while the door is removed. Ensure that covering is installed daily at the end of the workday.
3.2 Renewal. The Contractor shall crop out and renew (both
frame and door) QAWTD 1-126-1 using Coast Guard Drawing 627 WMEC 167-001 as guidance. Perform all necessary modifications to ensure proper fitting. Provide new gaskets and fasteners, as applicable with the new installation.
3.3 Nondestructive inspection (NDI). The Contractor shall
perform NDI of the new welds in accordance with Std Spec 0740_STD, Appendix C. Submit a CFR.
3.4 Watertight fitting preservation. The Contractor shall
preserve the new door and all other disturbed surfaces to match exiting adjacent surfaces, in accordance with Std Spec 0000_STD, paragraph titled “General preservation requirements”, and in accordance with COMDTINST M10360.3; and as follows:
3.4.1 Interior surfaces. Coat interior surface using the
coating system specified for “Door, Joiner, Option I” in Appendix B (Cutters and Boats Interior Painting Systems).
3.4.2 Exterior surfaces. Coat exterior surfaces using the
coating system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure, Steel), Option I” in Appendix A (Cutters and Boats Exterior Painting Systems).
Page 29 (Rev-1)
Do not paint knife-edges, gaskets, or any moving parts; including dogs, nuts, wedges, spindles, yokes, packing, connecting rods and hinge pins.
3.5 Closure. The Contractor shall demonstrate 100 percent
gasket contact and proper dog operation by means of a chalk test for each renewal. Ensure that initial contact between gasket and knife edge occurs throughout extent of gasket before final securing of dogs, and without use of excessive closing force.
If the mark on the gasket is not uniform, adjust as necessary to achieve uniform contact and retest.
4. NOTES
4.1 Damage control markings. The Coast Guard Inspector will
apply appropriate damage control decals onto doors and scuttles as appropriate.
Page 30 (Rev-1)
S64400_DNK_627(06 Oct 2008)
WORK ITEM 8: Renew Partitions
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to replace stall partitions in compartment 1-52-2-L (Crew WR WC & SHR).
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 627 WMEC 601-004, Rev C, General Arrangemnet Main and 01 Decks
Coast Guard Drawing 627 WMEC 644-003, Rev D, Sanitary Partitions
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to:
• Decking
• Bulkhead Insulation
• Toilets/Sinks
• Piping
3.2 Renewal. The Contractor shall remove, renew and install
new stall partitions and doors in compartment 1-52-2-L as shown on Coast Guard Drawings 627 WMEC 601-004 and 644-003. The Contractor shall provide all partition and door material.
3.3 Mounts. The Contractor shall renew each of the partition
mounts. The Contractor shall also repair any deck material that is disturbed in the process.
Page 31 (Rev-1)
3.4 Operational test. In the presence of the Coast Guard
Inspector, the Contractor shall thoroughly test and prove to be in satisfactory operating condition all items or shipboard devices that have been disturbed, used, repaired, altered, or installed. Submit a CFR.
4. NOTES