Copy of 65602_DD_K08ER2_Blank.xls
XLS spreadsheet 33 KB Posted
- Attached to
- DRYDOCK FOR USCGC CHOCK
- Solicitation number
- HSCG80-08-Q-3FAG13
About this file
SCHEDULE B REV-2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 02 chock.pdf | ||
| 65602_DD_K08R3.doc | DOC document | |
| Copy of 65602_DD_K08ER3_Blank.xls | XLS spreadsheet | |
| 65602_DD_K08R2.doc | DOC document | |
| Amendment 01 chock.pdf | ||
| 65602_DD_K08R1.doc | DOC document | |
| RFQCGCCHOCK.DOC | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B
| HSCG80-08-Q-3FAG13 | Page___of___ | ||||||
| USCGC CHOCK (WYTL 65602) | |||||||
| DRYDOCKING AVAILABILITY | |||||||
| SUPPLIES OR SERVICES AND PRICES/COSTS | |||||||
| CLIN Type | WORK ITEM | CLIN | WORK ITEM TITLE | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1 | 0001 | WELDING REPAIRS | NSP | NSP | NSP | NSP | |
| OPT | 1 | 0001AA | Flat Plate Renewal (7.0 or 7.5# or 7.65 Steel) | 4 sqft | 2 | ||
| OPT | 1 | 0001AB | Flat Plate Renewal (10.2# Steel) | 4 sqft | 2 | ||
| OPT | 1 | 0001AC | Eroded Weld Renewal (Steel) | 1 sqft | 6 | ||
| OPT | 1 | 0001AD | Overlay Welding (Steel) | 8 sqin | 6 | ||
| OPT | 1 | 0001AE | Alumium Crack Repair | 1 foot | 2 | ||
| OPT | 1 | 0001AF | Aluminum Eroded Weld Repair | EA | 2 | ||
| BASE | 2 | 0002 | CLEAN AND INSPECT SEWAGE AND GREY WATER COLLECTION AND HOLDING TANKS | JOB | 1 | ||
| BASE | 3 | 0003 | RENEW PROPELLER SHAFT | JOB | 1 | ||
| OPT | 3 | 0003AA | Straighten Shaft | JOB | 1 | ||
| BASE | 4 | 0004 | REMOVE, INSPECT, AND REINSTALL PROPELLER | JOB | 1 | ||
| OPT | 5 | 0005 | Perform Minor Repair and Recondationing of Propeller | JOB | 1 | ||
| BASE | 6 | 0006 | CLEAN, INSPECT GRID COOLERS | JOB | 1 | ||
| 7 | 0007 | RENEW TRANSDUCER AND PRESERVE TRANSDUCER HULL RING | NSP | NSP | NSP | NSP | |
| BASE | 7 | 0007AA | Transducer Renewal | JOB | 1 | ||
| BASE | 7 | 0007AB | Hull Ring Preservation | JOB | 1 | ||
| BASE | 8 | 0008 | RENEW VALVES | JOB | 1 | ||
| BASE | 9 | 0009 | REMOVE, INSPECT, AND REINSTALL RUDDER ASSEMBLY | JOB | 1 | ||
| OPT | 9 | 0009AA | Renew Rudder Lower Bearing | EA | 1 | ||
| OPT | 9 | 0009AB | Renew Rudder Pintle Bearing Assembly | EA | 1 | ||
| OPT | 9 | 0009AC | Renew Rudder Upper Carrier Bearing Assembly abd Seals | SET | 1 | ||
| BASE | 10 | 0010 | INSPECT VARIOUS DECK FITTINGS | JOB | 1 | ||
| BASE | 11 | 0011 | PRESERVE AND DISINFECT POTABLE WATER TANKS | JOB | 1 | ||
| BASE | 12 | 0012 | PREPARE AND COAT MAIN DECK SURFACES | JOB | 1 | ||
| BASE | 13 | 0013 | PRESERVE UNDERWATER BODY | NSP | NSP | NSP | NSP |
| BASE | 13 | 0013AA | Coating System Visual Inspection | JOB | 1 | ||
| OPT | 13 | 0013AB | Coating System Thickness Testing | JOB | 1 | ||
| BASE | 13 | 0013AC | PAINTING OF DRAFT MARKS | JOB | 1 | ||
| OPT* | 13 | 0013AD | "Condition A" (Entire U/W Body) | JOB | 1 | NSP | |
| OPT* | 13 | 0013AE | "Condition B" (Entire U/W Body) | JOB | 1 | NSP | |
| OPT | 13 | 0013AF | "Condition C" (Entire U/W Body) | JOB | 1 | ||
| BASE | 14 | 0014 | PRESERVE FREEBOARD | JOB | 1 | ||
| BASE | 15 | 0015 | PERFORM BOAT DAVIT MAINTENANCE | JOB | 1 | ||
| BASE | 16 | 0016 | RENEW CATHODIC PROTECTION SYSTEM | JOB | 1 | ||
| BASE | 17 | 0017 | ROUTINE DRYDOCKING | JOB | 1 | ||
| 18 | 0018 | PROVIDE TEMPORARY LOGISTICS | NSP | NSP | NSP | NSP | |
| BASE | 18 | 0018AA | PROVIDE TEMPORARY LOGISTICS | JOB | 1 | ||
| OPT | 18 | 0018AB | Provide Additional Temporary Logistics | DAY | 5 | ||
| BASE | 19 | 0019 | CLEAN EXHAUST PIPING | JOB | 1 | ||
| BASE | 20 | 0020 | RESEAL ONE-STEP DECKS | JOB | 1 | ||
| BASE | 21 | 0021 | RENEW FIRE AND SMOKE DETECTION SYSTEM | JOB | 1 | ||
| BASE | 22 | 0022 | RENEW BULKHEAD SHEATHING ENGINE ROOM | JOB | 1 | ||
| BASE | 23 | 0023 | RENEW SEWAGE PIPING | JOB | 1 | ||
| BASE | 24 | 0024 | ULTRASONIC THICKNESS MEASUREMENTS-UNDERWATER BODY | JOB | 1 | ||
| BASE | 25 | 0025 | ULTRASONIC THICKNESS MEASUREMENTS-FREEBOARD | JOB | 1 | ||
| OPT | A | Composite Labor Rate | Hour | 100 | |||
| BASE | B | GFP report in accordance with solicitation Section H. | NSP | EA | 1 | NSP | |
| OPT | Z | Laydays | DAY | 5 | |||
| Subtotal BASE and OPTION Items: | |||||||
| Total of all Items: |
File details come from the government source that posted it. Updated .