Copy of 65602_DD_K08ER2_Blank.xls

XLS spreadsheet 33 KB Posted

Attached to
DRYDOCK FOR USCGC CHOCK
Solicitation number
HSCG80-08-Q-3FAG13
Issued by

About this file

SCHEDULE B REV-2

View the file

Other files

File Type Posted
Amendment 02 chock.pdf PDF
65602_DD_K08R3.doc DOC document
Copy of 65602_DD_K08ER3_Blank.xls XLS spreadsheet
65602_DD_K08R2.doc DOC document
Amendment 01 chock.pdf PDF
65602_DD_K08R1.doc DOC document
RFQCGCCHOCK.DOC DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B

HSCG80-08-Q-3FAG13Page___of___
USCGC CHOCK (WYTL 65602)
DRYDOCKING AVAILABILITY
SUPPLIES OR SERVICES AND PRICES/COSTS
CLIN TypeWORK ITEMCLINWORK ITEM TITLEUNIT PRICEUNITQTYEXTENDED PRICE
10001WELDING REPAIRSNSPNSPNSPNSP
OPT10001AAFlat Plate Renewal (7.0 or 7.5# or 7.65 Steel)4 sqft2
OPT10001ABFlat Plate Renewal (10.2# Steel)4 sqft2
OPT10001ACEroded Weld Renewal (Steel)1 sqft6
OPT10001ADOverlay Welding (Steel)8 sqin6
OPT10001AEAlumium Crack Repair1 foot2
OPT10001AFAluminum Eroded Weld RepairEA2
BASE20002CLEAN AND INSPECT SEWAGE AND GREY WATER COLLECTION AND HOLDING TANKSJOB1
BASE30003RENEW PROPELLER SHAFTJOB1
OPT30003AAStraighten ShaftJOB1
BASE40004REMOVE, INSPECT, AND REINSTALL PROPELLERJOB1
OPT50005Perform Minor Repair and Recondationing of PropellerJOB1
BASE60006CLEAN, INSPECT GRID COOLERSJOB1
70007RENEW TRANSDUCER AND PRESERVE TRANSDUCER HULL RINGNSPNSPNSPNSP
BASE70007AATransducer RenewalJOB1
BASE70007ABHull Ring PreservationJOB1
BASE80008RENEW VALVESJOB1
BASE90009REMOVE, INSPECT, AND REINSTALL RUDDER ASSEMBLYJOB1
OPT90009AARenew Rudder Lower BearingEA1
OPT90009ABRenew Rudder Pintle Bearing AssemblyEA1
OPT90009ACRenew Rudder Upper Carrier Bearing Assembly abd SealsSET1
BASE100010INSPECT VARIOUS DECK FITTINGSJOB1
BASE110011PRESERVE AND DISINFECT POTABLE WATER TANKSJOB1
BASE120012PREPARE AND COAT MAIN DECK SURFACESJOB1
BASE130013PRESERVE UNDERWATER BODYNSPNSPNSPNSP
BASE130013AACoating System Visual InspectionJOB1
OPT130013ABCoating System Thickness TestingJOB1
BASE130013ACPAINTING OF DRAFT MARKSJOB1
OPT*130013AD"Condition A" (Entire U/W Body)JOB1NSP
OPT*130013AE"Condition B" (Entire U/W Body)JOB1NSP
OPT130013AF"Condition C" (Entire U/W Body)JOB1
BASE140014PRESERVE FREEBOARDJOB1
BASE150015PERFORM BOAT DAVIT MAINTENANCEJOB1
BASE160016RENEW CATHODIC PROTECTION SYSTEMJOB1
BASE170017ROUTINE DRYDOCKINGJOB1
180018PROVIDE TEMPORARY LOGISTICSNSPNSPNSPNSP
BASE180018AAPROVIDE TEMPORARY LOGISTICSJOB1
OPT180018ABProvide Additional Temporary LogisticsDAY5
BASE190019CLEAN EXHAUST PIPINGJOB1
BASE200020RESEAL ONE-STEP DECKSJOB1
BASE210021RENEW FIRE AND SMOKE DETECTION SYSTEMJOB1
BASE220022RENEW BULKHEAD SHEATHING ENGINE ROOMJOB1
BASE230023RENEW SEWAGE PIPINGJOB1
BASE240024ULTRASONIC THICKNESS MEASUREMENTS-UNDERWATER BODYJOB1
BASE250025ULTRASONIC THICKNESS MEASUREMENTS-FREEBOARDJOB1
OPTAComposite Labor RateHour100
BASEBGFP report in accordance with solicitation Section H.NSPEA1NSP
OPTZLaydaysDAY5
Subtotal BASE and OPTION Items:
Total of all Items:

File details come from the government source that posted it. Updated .