SPECIFICATION REV-01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 03 BEAR.pdf | ||
| Continuation Sheet for Amendment A00003 for the CGC Bear.doc | DOC document | |
| Amendment 02 BEAR.pdf | ||
| 901_DS_DLA_09R2 1 .pdf | ||
| Amendment 01 BEAR.pdf | ||
| RFQBEAR.DOC | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC BEAR (WMEC-901)
270 FOOT A CLASS MEDIUM ENDURANCE CUTTER
SPECIFICATION FOR DOCKSIDE REPAIRS
Developed By:
D.L. Abdella
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
(September 29, 2008 / Rev-1)
USCGC BEAR (WMEC-901) DOCKSIDE AVAILABILITY 2009
TABLE OF CONTENTS
Work Item Title Page
List of Sketches iii
Revisions Record iv
List of Applicable References v
List of Government-furnished Property ix
List of Critical Inspection Items xii
Specification Feedback xiii
Principal Characteristics xiv
General Requirements 1
1 Renew Designated Deck Penetrations and Stanchions 8
2 Install Bearing Vent Line 14
3 Renew #2 Fire Pump Foundation 17
4 Perform Magazine Sprinkler Valve Maintenance 19
5 Clean Shipboard Scullery Exhaust System 23
6 Renew Sounding Tube Caps 25
7 Flush, Repair and Inspect Chill Water and Heat System 29
8 Inspect and Repair Port and Starboard Fin Stabilizer Systems 37
9 Perform Inspection and Maintenance of TALON Helicopter Landing Grid 44
10 Renew Deck Covering System – 01 Deck 48
11 Renew Deck Covering System – Main Deck 50
12 Renew Deck Covering System – Main Deck Passageway 52
Page i (Rev-1)
13 Renew Deck Covering System – Main Deck Vestibule 54
14 Renew Deck Covering System – Aft Vestibule 56
15 Renew Deck Covering System – Main Deck Passageway and Vestibule 58
16 Renew Deck Covering System – Dispensary 60
17 Renew Deck Covering System – MAA Stores 62
18 Repair Auxiliary Machinery Space 1 Deck 64
19 Renew Balanced Joiner Door 67
20 Overhaul Hydraulic Door 70
Page ii (Rev-1)
List of Sketches
Work Item Sketch Number Page
This section is not applicable to this package.
Page iii (Rev-1)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.
Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
29 Sep 2008 1 2
Modified Sections 2 and 3 and made associated changes to “List of Applicable References”.
Modified GFP and made associated changes to “List of Government-furnished Property”.
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page iv (Rev-1)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
MIL-C-24671, July 1995, Cloth, Lint-Free, Flushing and Cleaning
MIL-PRF-16173, May 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-Application
MIL-PRF-17672, May 1995, Hydraulic Fluid, Petroleum, Inhibited
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Page v (Rev-1) http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp http://isddc.dot.gov/OLPFiles/USCG/010968.pdf
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 3141_STD, 2004 Edition, Overhaul Electrical Rotating Machines
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5100_STD, 2004 Edition, Clean Shipboard Ventilation Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 6341_STD, 2004 Edition, Renew Deck Covering Systems
DRAWINGS
Coast Guard Drawing 901 WMEC 185-014, Rev K, Auxiliary Machinery Space 1 Foundations
Coast Guard Drawing 901 WMEC 186-003, Rev-, Talon Grid Foundations and Structural Modifications
Coast Guard Drawing 901 WMEC 300-001, Rev F, Electrical Installation General Notes
Coast Guard Drawing 901 WMEC 321-001, Rev F, Wireways - Cable Routing
Coast Guard Drawing 901 WMEC 321-009, Rev D, Wireways – Master Plan
Coast Guard Drawing 901 WMEC 321-010, Rev D, Wireways – DETS Stuffing Tube/Transit Area
Coast Guard Drawing 901 WMEC 505-007, Rev F, Piping Sys Cleaning & Flushing Procedures
Coast Guard Drawing 901 WMEC 506-001, Rev K, Overflow, Air Escape and Sounding Tube System Diagram
Coast Guard Drawing 901 WMEC 506-002, Rev J, Overflow, Air Escape and Sounding Tube Arrangement and Details, Fwd Frame 103
Coast Guard Drawing 901 WMEC 514-001, Rev K, HVAC System Diagram
Coast Guard Drawing 901 WMEC 514-005, Rev J, HVAC Fan Rooms, Main Deck Arrangement and Details
Page vi (Rev-1)
Coast Guard Drawing 901 WMEC 514-020, Rev J, Chill Water and Heat System Diagram
Coast Guard Drawing 901 WMEC 521-007, Rev G, Firemain System, Machinery Space - Arrangement & Detail
Coast Guard Drawing 901 WMEC 521-011, Rev A, Adapter Assembly for New Fire Pumps
Coast Guard Drawing 901 WMEC 522-001, Rev F, Magazine Sprinkler System, Arrangement & Details
Coast Guard Drawing 901 WMEC 562-005, Rev E, A & B Rudder Stock & Steering Gear A&D
Coast Guard Drawing 901 WMEC 565-004, Rev F, Fin Stabilizer Hydraulic Piping Diagram
Coast Guard Drawing 901 WMEC 565-007, Rev H, Fin Stabilizer Machinery Assembly
Coast Guard Drawing 901 WMEC 588-003, Rev K, Helicopter Safety Net Arrangement and Detail
Coast Guard Drawing 901 WMEC 624-001, Rev L, Joiner Door List
Coast Guard Drawing 901 WMEC 634-002, Rev-, C & A, Paint, Deck Covering, and Insulation Mod Talon Grid
Coast Guard Drawing 905 WMEC 562-005, Rev A, Rudder Stock Seal Vent Piping, A & B Class
Coast Guard Drawing FL-588-001, Rev C, Talon Grid Support Skirt Replacement
Coast Guard Drawing FL-8301-002, Rev A, Talon Helo Landing Grid Stanchion Bolt with Locknut
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Technical Publication (TP), 2719, Volume 31, 30 Dec 1977, Fin Machinery and Hydraulics Subsystems WMEC 270 Class Ship
Page vii (Rev-1)
Coast Guard Technical Publication (TP) 2837, Feb 2007, Manufacturer's Instruction Book, SWBS 565, Section C, Fin Machinery and Hydraulics Subsystems
Coast Guard Technical Publication (TP) 2838, Dec 2007, Manufacturer’s Instruction Book, SWBS 584, Section A, Doors, Hydraulic Operated
Coast Guard Technical Publication (TP) 3368, Feb 2006, Technical Documentation Helicopter Land Grid TYPE 18-22-01
INDUSTRY STANDARDS
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power - Fluids - Method for Coding Level of Contamination by Solid Particles
ASTM International (ASTM) D4174, Reapproved 2005; Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) D5363, 2003, Standard Specification for Anaerobic Single Component Adhesives
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
Page viii (Rev-1)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
4 N Manual Selector Control Valve (Cm15M- BA3-3) Overhaul Kit
PN: 85176G 4 ea. 254.80
N 3/8" Hydraulic Check Valve (81PM-1) Overhaul Kit
PN: 85172F 2 ea. 88.56
N
3/4” Hydraulically- Operated Remote Control Valve (MIL-V- 17501) Overhaul Kit (Also Used For 3/8” Valves)
PN: 85173D 2 ea. 209.00
N Spring Loaded Lift Check Valve (81M) Overhaul Kit
PN: 85171H 8 ea. 69.84
N 1/4" Manual Cut Off Valve Overhaul Kit
PN: 810-4384536-
11A22
NSN: 4820-00-188-
8248)
6 ea. 46.27
N 1/2" Drain/Dump Valve Overhaul Kit
PN: 810-4384536 ½
inch)
NSN: 4820-00-183-
1 ea. 95.51
N
6" FWD MAG Sprinkler Control Valve 250 PSI (MIL-V-1750) Overhaul Kit
PN: 9454709j 1 ea. 319.00
N
1 1/2" Pressure Regulating Valve for AFT MAG Outside AFT MAG Door Overhaul Kit (Serial Number 5734) (FIG Number 442M)
PN: 94547020 1 ea. 168.00
7 N Solenoid Valve NSN: 4810-01-122- 0997 2 ea. 1,826.57
N Solenoid Valve NSN: 4820-01- 168-2248 2 ea. 1,782.81
N Thermostat NSN: 6685-00-894- 4098 2 ea. 200.00
N Calibrated flow valve
NSN: 4820-01-186-
1 ea. 900.00
N Calibrated flow valve
NSN: 4820-00-913-
1 ea. 1000.00
Page ix (Rev-1)
N Temperature gage
NSN: 6685-01-100-
3 ea. 100.00
N Magnahelic gage
NSN: 6685-00-956-
2 ea. 200.00 valve
NSN: 4820-01-164-
1 ea. 1,000.00 valve
1 ea. 100.00
8 N Hydraulic Cylinder NSN: 3040-01- 103-6565 4 ea. 4,426.57
Y Main Hydraulic Pump NSN: 4320-01- 104-1135 2 ea. 15,782.81
N **Tiller Pin NSN: 5315-01- 419-1523 4 ea. 1,000.00
Y PBCB valve NSN: 4810-01- 104-3347 2 ea. 3,817.13
N **Threaded-end rod PN: 1857336 2 ea. 400.00
9 N M16 Bolts NSN: 5305-01-393- 1827 24 ea. 25.65
N
**Talon Grid Stanchion Bolt Assembly, Including Locking Nut
NSN: 5340-01-481-
3786 25 ea. 96.30
19 N ***Balanced Joiner door N/A 1 ea. 7,000.00
20 N **Hydraulic Cylinder
NSN: 3040-01-
115-3242 1 ea. 2,452.03
N Hydraulic Pump NSN: 4320-01- 115-3476 1 ea. 1,103.49
N **Directional control valve PN: C-WK-471-2A 1 ea. 1,200.00
N **Switch PN: B-WK-748-12 1 ea. 400.00
N Top and Bottom guide rail
PN: C-WK-329-G1
2 1200.00
N Top wedge plate
PN: B-WK-329-F7
1 500.00
N Bottom wedge plate
PN: B-WK-329-F7
1 500.00
N Guide plate PN: A-WK-329-D29 2 300.00
N Roller Guide Plate PN: A-WK-329-30 1 100.00
N Roller PN: A-WK-329-D15 4 600.00
N Cylinder seal kit
PN: D-WK-406-
C1B-SEAL KIT
1 100.00
Page x (Rev-1)
N Hydraulic valve stack
PN: C-WK-471-49
WITH NEW PRESS.
SW
1 3,900.00
N Teleflex indicator arm
PN: B-WK-361-4A
1 200.00
N Brass strips, sides PN: A-WK-329-D5 2 700.00
N Brass strips PN: A-WK-329-D6 2 500.00
N Drive screws
PN: 90275A559
BOX OF 10
8 90.00
N Seal kit for hand pump
PN: D-WK-437-75
PC 5A KIT
1 50.00
N Seal kit for remote hand pump
PN: D-WK-859-18-
KIT
1 50.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page xi (Rev-1)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
6 Renew Sounding Tube Caps
9 Perform Inspection and Maintenance of TALON Helicopter Landing Grid
Page xii (Rev-1)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.
All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/defaul t.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xiii (Rev-1) http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
PC_270A WMEC
(21 Sep 2004)
Principal Characteristics
270A WMEC (A CLASS) MEDIUM ENDURANCE CUTTER
Length Overall 270' 0"
Depth (main deck at side to baseline) 33' 3"
Maximum Beam 37' 9-3/8"
Height of Highest Projection (above DWL) 90 ft.
Frame Spacing 1' 0"
Full Load Draft 13.85'
Full Load Displacement 1825.64 long tons
Shore Tie Voltage Requirements 450 vac, 400A, 3 phone cables
PROPELLER / SHAFT
Number of Propellers 2
Number of Blades per Propeller 4
Diameter of Propeller 9'
Pitch Controllable
Revolutions per Minute (RPM) 260
Shaft Diameter 10.55" at exit of hull
Page xiv (Rev-1)
00000_PWB_FLT (08 Apr 2008)
General Requirements
1. SCOPE
1.1 Scope. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor
shall provide portable fire extinguishers.
3.3 Welding and brazing requirements. The Contractor shall
perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's
Page 1 (Rev-1)
Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
5.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may
be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
5.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.
Page 2 (Rev-1) http://www.uscg.mil/directives/cim.asp
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 - COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 - STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 - TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 - FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @
77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 - RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
Page 3 (Rev-1)
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc?)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 4 (Rev-1)
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
• Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 5 (Rev-1)
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 6 (Rev-1)
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 7 (Rev-1)
S61000N_911 (15 Nov 2005) 901_DLA (15 July 2008)
WORK ITEM 1: Renew Designated Deck Penetrations and Stanchions
1. SCOPE
1.1 Scope. This work item describes the requirements for the
Contractor to renew the following:
• Stuffing tube(steel) for 120V outlet on aft edge of fantail
• Two stuffing tubes (steel) port side, outboard of gas rack on aft edge of fantail
• Two stuffing tubes (steel) aft of chalks, port side of fantail
• Spotlight stanchion (steel) port side, approximately FR 244, fantail
• Port and starboard, aft corner edges of fantail, quarter stanchions (steel)
• Six stanchions (steel) port side of hangar, between approximately FR 100 and FR 140
• Spotlight stanchion (steel) port side of hangar, approximately at FR 128
• Port and starboard stuffing tubes and kickboxes (steel) for AC receptacles on Flight Deck (approximately at FR 160)
• Replace four each knife edge chafe guards (steel) on both port and starboad edges of flight deck, located approximately between FR 174 and FR 200.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Page 8 (Rev-1)
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 901 WMEC 300-001, Rev F, Electrical Installation General Notes
Coast Guard Drawing 901 WMEC 321-001, Rev F, Wireways - Cable Routing
Coast Guard Drawing 901 WMEC 321-009, Rev D, Wireways – Master Plan
Coast Guard Drawing 901 WMEC 321-010, Rev D, Wireways – DETS Stuffing Tube/Transit Area
Coast Guard Drawing 901 WMEC 588-003, Rev K, Helicopter Safety Net Arrangement and Detail
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Insulation.
• Overhead framing and panels.
• Piping.
• Helicopter safety nets and latch assemblies.
• Wiring.
• False bulkheads.
NOTICE!
The Contractor shall be aware that the flight deck is composed of HY100 steel.
3.2 Temporary safety railing. To promote safety, the
Contractor shall minimize the number of flight deck safety nets removed at one time; secure all gaps with a substantial temporary lifelines arrangement. Remove and dispose of all
Page 9 (Rev-1) temporary lifelines upon completion of work.
3.3 Protective measures. The Contractor shall furnish and
install suitable covering to seal off and protect all non-affected surfaces/equipment, furniture, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces where contamination is discovered, if any, which was caused by improper protection or performance of work, to the original condition of cleanliness.
3.4 Renewals. The Contractor shall accomplish the following
renewal tasks, using Coast Guard Drawings 901 WMEC 300-001 and 901 WMEC 588-003 as guidance. Renew designated stuffing tubes, stanchions and chafe guards (see paragraph 1.1 and below drawing) as designated by the Coast Guard Inspector. Refer to Coast Guard Drawings 901 WMEC 321-009, 901 WMEC 321-010 and 901 WMEC 321-001 for guidance.
Page 10 (Rev-1)
Page 11 (Rev-1)
3.5 Disturbed components. The Contractor shall renew all
disturbed packing and fasteners.
3.6 Touch-up preservation. The Contractor shall prepare and
prime coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces in accordance with Std Spec 0000_STD, paragraph titled “General preservation requirements”;
and in accordance with COMDTINST M10360.3, Appendix A (Cutters and Boats Exterior Painting Systems) and Appendix B (Cutters and Boats Interior Painting Systems), respectively, and as applicable.
Page 12 (Rev-1)
4. QUALITY ASSURANCE
4.1 Water hose test. The Contractor shall inspect and perform a water hose test of all affected boundaries in accordance with Std Spec 0740_STD, Appendix C. Submit a CFR.
5. NOTES
5.1 Ships Force responsibility. The Ships Force will apply the top coat preservation.
Page 13 (Rev-1)
EC_159_56210N_270 (24 Feb 2006) 901_DLA (23 July 2008)
WORK ITEM 2: Install Bearing Vent Line
Contractor to install a vent line for the port and starboard steering system lower bearings.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 901 WMEC 562-005, Rev E, A & B Rudder Stock & Steering Gear A&D
Coast Guard Drawing 905 WMEC 562-005, Rev A, Rudder Stock Seal Vent Piping, A & B Class
3. REQUIREMENTS
3.1 General.
3.2 Bearing vent line installation. The Contractor shall
install a new vent line to each existing vent port on the mechanical seal as shown on Coast Guard Drawing 905 WMEC 562- 005, using Coast Guard Drawing 901 WMEC 562-005 as guidance, and as follows:
Page 14 (Rev-1)
3.2.1 Visually verify that a 3/4-inch adapter was previously
installed to the vent port. Visually verify the piping system was previously routed making a short run aft, then turning 45 degrees, and making a straight run under the deck plates to the open bilge pocket. Visually verify in the open bilge pocket the piping makes a 90-degree turn upward, runs straight up the bulkhead into the overhead, and makes a 90 degree turn inboard.
3.2.2 On the inboard run, physically connect the other end of vent line to the existing counter measure wash down drain line.
Ensure that the connection is made on the top of the countermeasure wash down drain line so that a “P” trap is created, to prevent the backflow of countermeasure wash down line.
3.2.3 Visually verify that a union couple was previously
installed near the rudder post vent line, to facilitate piping disassembly.
3.2.4 Ensure that all new piping and fitting materials are
90/CU and bronze, respectively.
NOTICE!
These vent lines are part of an Engineering Change previously installed. Some of the above-specified piping modifications may have been previously accomplished. Prior to accomplishing any of the work specified in this work item, the Contractor shall examine the currently installed vent piping system, comparing with Coast Guard Drawings 901 WMEC 562-005 and 905 WMEC 562-
005, and submit a CFR detailing any of the specified work already accomplished, any existing deviations from the vent piping arrangement shown in the drawings, and any recommended modifications required.
3.3 Touch-up preservation. The Contractor shall prepare and
coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
Page 15 (Rev-1)
3.4 Drawing deliverables. The Contractor shall “red-line” the Coast Guard Drawings listed in Section 2 to clearly reflect the work or deviations specified in this work item and KO-approved related Change Requests. Within 24 hours after completion of this work item, submit a draft copy of the marked-up drawing(s) to the COTR for review and approval. Within 10 calendar days after receiving Coast Guard comments or completion of the availability, whichever occurs first, incorporate all comments and deliver one set of the final red-lined drawing(s) to the COTR, and two additional sets to the following address:
MLCA (vad) 300 East Main Street, Suite 550 Norfolk, VA 23510-9111
4. QUALITY ASSURANCE
4.1 Leak test. After all authorized work is complete, the
Contractor shall perform an operational test of the new vent lines using the system fluid at normal operating pressure. Be aware that no visible leakage or deformation is acceptable.
Repair all leaks and discrepancies found. (See paragraph 5.1.)
Submit a CFR.
5. NOTES
5.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all tests.
Page 16 (Rev-1)
S52111N_270 (30 Apr 2007) 270A (30 Apr 2007)
901_DS (22 July 2008)
WORK ITEM 3: Renew #2 Fire Pump Foundation
Contractor to renew the foundation for the #2 Fire pump, located in the JP5 Pump Room (Compartment 4-186-0-E).
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Drawing 901 WMEC 521-007, Rev G, Firemain System, Machinery Space - Arrangement & Detail
Coast Guard Drawing 901 WMEC 521-011, Rev A, Adapter Assembly for New Fire Pumps
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• ASW pump and piping.
• Fire pump.
• JP-5 piping.
• Gauge panel and lines.
3.1.2 Work coordination. The Contractor shall coordinate work
Page 17 (Rev-1) such that only one fire pump is out of service at any time.
3.1.3 Operational test - initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the #2 fire pump system to demonstrate existing operational condition. Submit a CFR.
3.2 Renewal particulars. The Contractor shall renew the
foundation and cofferdam for the designated #2 fire pump. Refer to Coast Guard Drawings 901 WMEC 521-007 and 901 WMEC 521-011 for guidance. Prior to renewal, the Contractor shall evaluate the foundation, cofferdam and pump assembly; and submit a CFR detailing any required repairs or modifications to accommodate a proper fit.
3.2.1 Prepare and preserve the pump housing and motor mount in accordance with COMDTINST M10360.3.
3.2.2 Cofferdam measures approximately 39 ½” by 17 ¾” by 2 ½”.
3.3 Touch-up preservation. The Contractor shall prepare and
touch-up coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
4. QUALITY ASSURANCE
4.1 Operational test - final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, thoroughly test, inspect for leaks, and prove the disturbed firemain system to be in satisfactory operating condition (see
5.1 (Equipment operation)), in accordance with manufacturer’s instructions. During operational test, ensure that system pressure is monitored using the pressure gauge, located in Damage Control Central. Be aware that no visible leakage or deformation is acceptable. Repair all leaks and discrepancies found. Submit a CFR.
5. NOTES
5.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational tests.
Page 18 (Rev-1)
S52200N_902 (26 Jun 2007) 901_DLA (23 July 2008)
WORK ITEM 4: Perform Magazine Sprinkler Valve Maintenance
1. SCOPE
1.1 Scope. This work item describes the requirements for the
Contractor to perform maintenance of the following magazine sprinkler valves:
VALVE
NUMBER EQUIPTMENT
MS-1-38-2 3/8” Manual Control Valve (CM15M-BA3-3) MS-1-58-1 3/8” Manual Control Valve (CM15M-BA3-3) MS-1-203-3 3/8” Manual Control Valve (CM15M-BA3-3) MS-2-213-2 3/8” Manual Control Valve (CM15M-BA3-3) MS-1-48-1 3/8”Hydraulically-Operated Check Valve(81PM-1) MS-2-213-1 3/8”Hydraulically-Operated Check Valve(81PM-1)
MS-1-49-1 3/4” Hydraulically-Operated Remote Control Valve (MIL-V- 17501)
MS-2-214-1 3/4” Hydraulically-Operated Remote Control Valve (MIL-V- 17501)
MS-1-37-2 3/8” Spring Loaded Lift Check Valve (81M) MS-1-39-2 3/8” Spring Loaded Lift Check Valve (81M) MS-1-58-2 3/8” Spring Loaded Lift Check Valve (81M) MS-1-58-3 3/8” Spring Loaded Lift Check Valve (81M) MS-1-203-2 3/8” Spring Loaded Lift Check Valve (81M) MS-1-203-3 3/8” Spring Loaded Lift Check Valve (81M) MS-1-213-1 3/8” Spring Loaded Lift Check Valve (81M) MS-1-213-3 3/8” Spring Loaded Lift Check Valve (81M)
M-1-48-1 1/4" Manual Cut Off Valve for Fire Main gauge FWD MAG Closet (Part Number 810-4384536-11A22)
M-1-48-2 1/4" Manual Dump/Drain Valve in FWD MAG Closet (Part Number 810-4384536-11A22)
M-1-58-4 1/4" Manual Cut Off Valve for Fire Main gauge at FWD MAG Remote (Part Number 810-4384536-11A22)
M-2-213-4 1/4" Manual Cut Off Valve for Fire Main gauge at AFT Local (Part Number 810-4384536-11A22)
M-1-37-2 1/4" Manual Cut Off Valve for Fire Main gauge at FWD MAG Local (Part Number 810-4384536-11A22)
M-1-203-4 1/4" Manual Cut Off Valve for AFT MAG Remote Fire Main gauge (Part Number 810-4384536-11A22)
M-1-42-2 1/2" Drain/Dump valve for Piping Coming Off of Sprinkler Head Line in the 26 P-Way; (PN 810-4384536 ½ inch)
M-1-50-2 6" FWD MAG Sprinkler Control Valve 250 PSI (MIL-V-1750) On Brass Plate
M-2-219-2 1 1/2" Pressure Regulating Valve for AFT MAG Outside AFT MAG Door (Serial Number 5734) (FIG Number 442M)
Page 19 (Rev-1)
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 901 WMEC 522-001, Rev F, Magazine Sprinkler System, Arrangement & Details
3. REQUIREMENTS
3.1 General.
3.1.1 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which are separate work items in this specification package:
• “Flush, Repair and Inspect Chilled Water and Heat System”.
• “Renew #2 Fire Pump Foundation”.
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to:
• Ceiling tiles.
• Piping in various locations.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the affected sprinkling system, to demonstrate existing operational condition. Submit a CFR.
3.3 Temporary firemain connections. The Contractor shall
provide temporary connections for the firemain, to ensure the Firemain System remains operational during the performance of the tasks specified herein.
3.4 Valve inspection and overhaul. The Contractor shall
accomplish the following tasks, using Coast Guard Drawing 901 WMEC 522-001 as guidance:
3.4.1 Cleaning and inspection. The Contractor shall
disassemble all designated valve assemblies (see paragraph 1.1).
Clean and inspect all disassembled valve components. Submit a
CFR.
Page 20 (Rev-1)
3.4.2 Reassembly and reinstallation.
3.4.2.1 Reassemble all valves with new Government-furnished
rebuild parts. Lubricate all moving components, in accordance with manufacturer’s recommendations. Renew all diaphragms and packing.
3.4.2.2 Reinstall all valves, after reassembly.
3.4.2.3 Dispose of all components not re-used in accordance
with all Federal, state and local regulations.
4. QUALITY ASSURANCE
4.1 Hydrostatic test. After all authorized repairs, the
Contractor shall hydrostatically test all new and disturbed piping and components of the firemain system in accordance with Std Spec 0740_STD, Appendix C, “Hydrostatic Test”. Be aware that no leakage or permanent deformation of pressure-containing parts is permissible. Repair all leaks and discrepancies found.
Submit a CFR.
4.2 Operational test – final. In the presence of the Coast
Guard Inspector, the Contractor shall thoroughly test and prove the sprinkling system to be in satisfactory operating condition (see 5.2 (Equipment operation)). Submit a CFR.
4.3 Operational test fluid. The Contractor shall use fresh
water during both operational tests specified herein.
5. NOTES
5.1 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
N Manual Selector Control Valve (Cm15M- BA3-3) Overhaul Kit
PN: 85176G 4 ea. 254.80
N 3/8" Hydraulic Check Valve (81PM-1) Overhaul Kit
PN: 85172F 2 ea. 88.56
Page 21 (Rev-1)
N
3/4” Hydraulically- Operated Remote Control Valve (MIL-V- 17501) Overhaul Kit (Also Used For 3/8” Valves)
PN: 85173D 2 ea. 209.00
N Spring Loaded Lift Check Valve (81M) Overhaul Kit
PN: 85171H 8 ea. 69.84
N 1/4" Manual Cut Off Valve Overhaul Kit
PN: 810-4384536-11A22
NSN: 4820-00-188-
8248)
6 ea. 46.27
N 1/2" Drain/Dump Valve Overhaul Kit
PN: 810-4384536 ½
inch)
NSN: 4820-00-183-6991
1 ea. 95.51
N
6" FWD MAG Sprinkler Control Valve 250 PSI (MIL-V-1750) Overhaul Kit
PN: 9454709j 1 ea. 319.00
N
1 1/2" Pressure Regulating Valve for AFT MAG Outside AFT MAG Door Overhaul Kit (Serial Number 5734) (FIG Number 442M)
PN: 94547020 1 ea. 168.00
5.2 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational
Page 22 (Rev-1)
51000_DLA_FLT (25 Mar 2008) 270 A WMEC (18 Aug 2004)
WORK ITEM 5: Clean Shipboard Scullery Exhaust System
Contractor to clean the Scullery exhaust ventilation system.
Refer to Coast Guard Drawings 901 WMEC 514-001 and 901 WMEC 514- 005 for guidance.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5100_STD, 2004 Edition, Clean Shipboard Ventilation Systems
Coast Guard Drawing 901 WMEC 514-001, Rev K, HVAC System Diagram
Coast Guard Drawing 901 WMEC 514-005, Rev J, HVAC Fan Rooms, Main Deck Arrangement and Details
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Ducting screens.
• Dishwasher/laundry ducting.
• Ceiling tiles and supports.
• Overhead sheathing.
• Wiring.
• Scullery equipment.
Page 23 (Rev-1)
3.1.2 Operational test - initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust system to demonstrate existing operational condition. Submit a CFR.
3.2 Cleaning requirements. The Contractor shall clean the
Scullery exhaust ventilation system, in accordance with Std Spec 5100_STD, and submit a CFR on any discrepancies found.
3.3 Additional requirements. In addition to the above, the
Contractor shall accomplish the following:
3.3.1 Notification. Give written notification to the COTR, forty-eight hours before starting ventilation cleaning work.
3.3.2 Additional protective covering. In addition to providing protective covering as specified in Std Spec 5100_STD, subsection 3.1.3 (Protective measures), provide additional protective covering for all food preparation and serving surfaces in the immediate work area, as applicable, to prevent contamination.
3.3.3 Avoidance of meal preparation and service. Ensure that
cleaning of galley ventilation systems is scheduled between 1900 and 0530 so that it WILL NOT interfere with meal preparation and service.
4. QUALITY ASSURANCE
4.1 Operational test - final. In the presence of the Coast
Guard Inspector, the Contractor shall thoroughly test and prove the disturbed ventilation systems to be in satisfactory operating condition (see 5.1 (Equipment operation)). Repair all leaks and discrepancies. Submit a CFR.
5. NOTES
5.1 Equipment operation. Coast Guard personnel will operate
Page 24 (Rev-1)
S50600N_904 (26 Jun 2007) 901_DLA (23 July 2008)
WORK ITEM 6: Renew Sounding Tube Caps
Contractor to renew the following four sounding tube caps, located between frames 186 and 207 in the Main and Aft Chief’s Passageways; repair sounding tube pipe threads; and inspect associated sounding tubes:
• 3-190-1-J.
• 3-190-2-J.
• 4-190-1-J.
• 4-190-2-J.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 901 WMEC 506-001, Rev K, Overflow, Air Escape and Sounding Tube System Diagram
Coast Guard Drawing 901 WMEC 506-002, Rev J, Overflow, Air Escape and Sounding Tube Arrangement and Details, Fwd Frame 103
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
Page 25 (Rev-1)
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph:
• 3.2 (Renewal particulars).
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following (See 5.2 (Unit’s responsibility)):
• JP 5 Fuel Tanks.
JP-5 Storage 4-190-1-J 8,928 gallon capacity
JP-5 Storage 4-190-2-J 8,928 gallon capacity
JP-5 Service 3-190-1-J 890 gallon capacity
JP-5 Service 3-190-2-J 890 gallon capacity
• Bulkheads and insulation.
• Electrical wiring.
• Piping.
• Flammable stores.
3.1.2.1 Fluid handling. The Contractor shall remove up to a
total of 3,500 gallons of JP 5 fuel to facilitate gas-freeing, if necessary. Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations (See 5.1 (Unit’s responsibility)).
NOTICE!
Vessel may come in with less tank fluid contents than specified above.
3.1.3 Operational test – initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
Page 26 (Rev-1)
3.2 Renewal particulars. Using Coast Guard Drawings 901 WMEC
506-001 and 901 WMEC 506-002 as guidance, the Contractor shall renew the four designated JP 5 sounding tube caps (see paragraph 1.1); repair matching sounding tube pipe threads; visually inspect the designated sounding tubes using a borescope; and submit a CIR. All four sounding tubes are 1.5 inches in diameter and have a .25-inch thick striker plate installed at the bottom of the sounding tube.
3.2 Cleaning requirements. After all sounding tube work is
complete, the Contractor shall remove the designated JP5 tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up all residual moisture with clean lint-free cloths.
3.3 Tank content and waste disposal. The Contractor shall
dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.
3.4 Inspection. The Contractor shall visually inspect all
designated tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces.
Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
• Tank level indicator (TLI) and/or float switch condition.
• Sounding tube and striker plate condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
Page 27 (Rev-1)
3.5 Touch-up preservation. The Contractor shall prepare and
coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
3.6 Tank closing. The Contractor shall notify the COTR at
least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
3.7 Operational test – final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the disturbed tank TLIs to be in satisfactory operating condition (see 5.1 (Equipment operation)). Submit a CFR.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
5.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational tests.
5.2 Unit’s responsibility. The ship’s force will accomplish
the following tasks:
• Transfer fuel from affected tanks into other suitable tanks.
• Procure new fluids and refill all tanks at the appropriate time, if required.
Page 28 (Rev-1)
S51401N_270 (15 Sep 2006) 901_DLA (24 July 2008)
WORK ITEM 7: Flush, Repair and Inspect Chill Water and Heat System
Contractor to flush, repair, inspect and refill the Chill Water and Heat System, shown on Coast Guard Drawing 901 WMEC 514-020.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 901 WMEC 505-007, Rev F, Piping Sys Cleaning & Flushing Procedures
Coast Guard Drawing 901 WMEC 514-020, Rev J, Chill Water and Heat System Diagram
3. REQUIREMENTS
3.1 General.
3.1.1 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Chill water piping and associated insulation.
• Flow regulators.
NOTICE!
The Contractor shall provide temporary cooling for CIC, Radio, IC Gyro, and ECC.
3.1.2 Operational- initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the Chill Water and Heat System, to demonstrate existing operational condition. Submit a CFR.
Page 29 (Rev-1)
3.2 System draining. The Contractor shall drain all existing
fluid from the Chill Water and Heat System; dispose of removed fluids in accordance with all Federal, state, and local regulations.
3.3 Coil unit line-up. Prior to commencement of system
flushing, the Contractor shall ensure that all fan coil units are lined-up to the system, with the assistance of the Coast Guard Inspector.
3.4 Flushing requirements. After all authorized work is
completed, the Contractor shall accomplish the following, using Coast Guard Drawing 901 WMEC 505-007 as guidance:
3.4.1 Clean all system strainers and valves.
3.4.2 Flush all new and disturbed chill/hot water piping with a system manufacturer recommended flushing fluid for five minutes, including two Fan Coil Units (FCU) in the ECC. Ensure that flushing fluid is directed to move scale and foreign debris away from installed machinery to prevent possible damage upon operational testing. Submit a CFR documenting date and time of flushing process, and verification of piping and FCU cleanliness.
3.4.3 Dispose of flushing fluid in accordance with all
applicable Federal, state, and local regulations.
WARNING!
Do not drain ANY Fluids (including fresh…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .