SPECIFICATION_45_RBM_BPA_REV-0_8-21-14_(Freshwater).pdf
PDF 925 KB Posted
- Solicitation number
- HSCG40-15-Q-53001
About this file
Specification (Freshwater)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_A00002.pdf | ||
| Amendment_A00001.pdf | ||
| HSCG40-15-Q-53001_45_RBM_BPA_HOME_PIER.pdf | ||
| SPECIFICATION_45_RBM_BPA_REV-0_8-21-14_(saltwater).pdf | ||
| RFQ_HSCG40-15-Q-53001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG RB-M 45
SPECIFICATION FOR DRYDOCK REPAIRS
FY2015
Developed By: Gabriel A Diaz
(Rev-0, 21 August 2014)
USCG RB-M-45 DRYDOCK AVAILABILITY FY2015
TABLE OF CONTENTS
Revisions Record ...................................................................................................................................................... iii Consolidated List of References ............................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................................. vi Consolidated List of Critical Inspection Items ......................................................................................................... ix Principal Characteristics ............................................................................................................................................ x General Requirements WORK ITEM 1: Main Diesel Engine to Auragen Generator, Align WORK ITEM 2: Main Diesel Engine To Jet Drive, Align WORK ITEM 3: Water Jet-Inspect, Perform Service WORK ITEM 4: Jet Drive Anodes, Renew WORK ITEM 5: Water Jet Drive, Preserve WORK ITEM 6: U/W Body, Preserve (100%) WORK ITEM 7: Drydocking WORK ITEM 8: Temporary Services, Provide WORK ITEM 9: Sea Trial Performance, Support, Provide ii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iii (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RBM 201-001, Rev B, Main Engine Arrangement Coast Guard Drawing 45 RBM 247-002, Rev C, Water Jet Propulsor Arrangement Coast Guard Drawing 45 RBM 311-004, Rev C, APU Generator Drive System Coast Guard Drawing 45RB-M_170_1 Rev A Folding Mast Coast Guard Drawing 45-RB-M_84_2 Rev – Docking Plan Coast Guard Drawing 45RBM-247-002 Rev A, Water Jet Propulsor Arrangement Coast Guard Drawing 45RBM-631-001 Rev B, Painting Layout
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST)_MI0360.3 (series), Coatings and Color Manual Coast Guard Technical Publication (TP) 204413-R22 SEQ 3 176001, Rolls Royce Water Jet Maintenance
Manual, Jun 2009 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2012, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2012, Temporary
Services iv (Rev-0) http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace
OTHER REFERENCES
45 RBM Water Jet Disassembly / Assembly Procedures ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using
Wipe Sampling Methods for Subsequent Determination of Metals Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards Code of Federal Regulations (CFR) Title 33, Jul 2013, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49 The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal v (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 Y *MDE/ TO GENERATOR
ALIGNMENT TOOL
PN: MMRBM0030 01
2 Y * MDE/ TO JET DRIVE
ALIGNMENT TOOL
PN: MMRBM0451 1 ea
2 Y * ENGINE LIFTING BAR PN: MMRBM0956 1 ea 3 N Stainless Steel Ball Joint NSN: 3040016152117
PN: 59915K483
10 EA $12.14
3 N Stainless Steel Threaded Rod
NSN: 5306016152224
PN: 93250A140
1 EA $10.90
3 N Bearing Bushing NSN: 3120014555212
PN: 10106911
4 EA $6.88
3 N Bearing Bushing NSN: 3120580006242
PN: 36M05101
4 EA $68.55
3 N **Socket Head Screw NSN: 5305016171580
PN: 91210050
8 EA $1.98
3 N **Bolt Kit NSN: 2815016171688
PN: 93112085A
2 EA $10.25
3 N **Key NSN: 5315016166360
PN: 10100824
3 EA $21.21
3 N Seal NSN:5330580006238 PN:
10118902
2EA $4.00
3 N Bushing NSN: 3120580006239
PN: 10105511
2 EA $34.42
3 N Bearing Bushing NSN: 3120014555272
PN: 10105111
4 EA $24.42
3 N **Bolt Kit NSN: 2815016171974
PN: 93112080F
2 EA $4.81
3 N **Bolt Kit NSN: 5340016167191
PN: 93112065K
12 EA $8.00
3 N Bearing Unit NSN: 3110016166342
PN: 37506201
2 EA $403.50
3 N Bushing NSN: 3120580006240
PN: 10106011
4 EA $37.45
3 N **Set Screw NSN: 5305016020672
PN: 91608012
6EA $1.16
3 N **Bolt Kit NSN: 5305016173161
PN: 93112090K
10EA $9.19
3 N O-ring NSN: 5331580006241
PN: 10202606
6 EA $10.30
vi (Rev-0)
3 N **Mechanical Sealing NSN: 4320580006403
PN: 10203870
2 EA $767.45
3 N Bolt Kit NSN: 5306016164058
PN: 93310030E
6 EA $1.41
3 N O-ring NSN: 5331016020679
PN: 10202631
2 EA $5.15
3 N O-ring NSN: 5331016020680
PN: 10202625
4 EA $10.86
3 N Sealing NSN: 5365016233174
PN: 41018801
2 EA $7.31
3 N O-ring NSN: 5331016200368
PN: 10202611
2 EA $4.07
3 N Seal Lip NSN: 4730016204613
PN: 10202590
4 EA $77.25
3 N Sealing NSN: 5330016163186
PN: 45002010
2 EA $7.31
3 N **Lock Nut NSN: 5310016162982
PN: 10202908
2 EA $15.56
3 N Lock Washer NSN: 5310016232756
PN: 10203008
2 EA $4.79
3 N **Ring Nut NSN: 5310016164016
PN: 10202912
2 EA $30.00
3 N Seal NSN: 5330016243735
PN: 10202540R
6 EA $13.56
3 N **Screw NSN: 5305016162955
PN: 93305025
8 EA $0.21
3 N **Washer NSN: 5310016162966
PN: 912505
8 EA $0.14
3 N SS Bond Seal NSN: 5330016212084
PN: 9900-04SS
4 EA $4.50
3 N 3/8” BSPP SS Seal NSN: 5330016212063
PN: 9900-06SS
6 EA $3.90
3 N Gasket NSN: 5330016232867
PN: 37527805
2 EA $49.52
3 N Bushing NSN: 5365016202680
PN: 10108416
8 EA $54.80
3 N **Bolt Kit NSN: 5305016242899
PN; 93110060A
4 EA $8.82
3 N **Bolt Kit NSN: 5305016242922
PN: 99110040G
14 EA $4.61
3 N Bushing NSN: 3120014555268
PN: 10106902
8 EA $5.51
3 N Gasket NSN: 5330016163014
PN: 10108901
2 EA $2.96
3 N **Bolt Kit NSN: 5305016231019
PN: 93110090A
4 EA $3.72
4 N Transom Anode NSN: 5342226078675
PN:10108230
4 EA $40.70
4 N Tunnel Anode NSN: 5342016020668
PN:10108220
4 EA $19.00
vii (Rev-0)
4 N Impeller Housing/Bucket/Interceptor
Anode
NSN: 5342226078672
PN:10107701
10 EA $17.63
4 N Guide Vane Chamber Anode
NSN: 5342016020669
PN:37517411
2 EA $205.28
4 N Anode, Anode Hatch NSN: 5342251465439
PN:10108210
2 EA $23.07
4 N Screw Connection PN:93310025H 4 EA $1.74 4 N Screw Connection NSN: 5305016275854
PN:93308025H
14 EA $0.92
4 N Screw Connection PN:016022105
PN:91206020E
8 EA $1.35
4 N Screw Connection NSN: 5340016243271
PN:93308025E
8 EA $0.71
4 N O-ring NSN: 5331251487667
PN:10202639
2 EA $4.95
4 N Screw Connection NSN: 5305016240905
PN:93310016E
8 EA $0.34
4 N Screw Connection PN:93312030E 2 EA $6.15 4 N Screw Connection NSN: 5305016204602
PN:91212025E
8 EA $1.41
4 N O-ring NSN: 5331226078691
PN:10202626
2 EA $6.79
4 N Tube Extension NSN: 4730016210708
PN:37610802
2 EA $120.10
4 N Tube Clamp NSN: 4730016200951
PN:10217881
2 EA $16.28
4 N Screw Connection NSN: 5305016022101
PN:93310030H
2 EA $1.60
4 N Connecting Cable NSN: 6145016203663
PN:10234301
4 EA $14.70
4 N Screw Connection NSN: 5305016176732
PN:93306016E
8 EA $0.34
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter viii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
1 Main Diesel Engine to Auragen Generator, Align
2 Main Diesel Engine To Jet Drive, Align
3 Water Jet-Inspect, Perform Service
5 Water Jet Drive, Preserve
6 U/W Body, Preserve (100%) ix (Rev-0)
PRINCIPAL CHARACTERISTICS
45 FT RESPONSE BOAT MEDIUM
HULL MANUFACTURED BY MARINETTE MARINE CORP
5086 (GRADE) ALUMINUM
HIN- 2009
LENGTH OVERALL 44 FEET, 10.5 INCHES
UNFIXED HEIGHT 20 FEET 9 INCHES
BEAM, MAXIMUM 14 FEET, 7.75 INCHES
FULL LOAD DRAFT 3 FEET, 4 INCHES
FULL LOAD DISPLACEMENT 36,500 POUNDS
MAX SUSTAINED SPEED 42.5 KNOTS
RANGE 250 NAUTICAL MILES AT 30 KNOT
MISSION LIMITS 8 FOOT SEAS / 30 KNOT WINDS
SURVIVABILITY LIMITS 12 FOOT SEAS / 50 KNOT WINDS
PROPULSION
TYPE 6 CYLINDER DIESEL ENGINE
NUMBER OF UNITS 2 MTU’S 60 SERIES 825 HP
WATER JETS
TYPE ROLLS-ROYCE WATER-JET
NUMBER OF UNITS TWO
x (Rev-0)
00000_0714_FLT
REC_00000_FLT_ Boats- 47 MLB @ Commercial Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST)_MI0360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using
Wipe Sampling Methods for Subsequent Determination of Metals Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal Code of Federal Regulations (CFR) Title 33, Jul 2013, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation
3. REQUIREMENTS
1 (Rev-0)
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with (COMDTINST)_MI0360.3C , Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
2 (Rev-0)
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy.
3.6.1 Coast Guard turn-over preparation. The Contractor shall be aware that, upon arrival, after haulout, and prior to departing the Contractor’s facility, the Coast Guard crew shall be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:
3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.
3.6.1.2 The Contractor may commence/continue work during these time frames.
3.6.1.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.
3.6.1.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.
3.6.1.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.
3.6.1.6 Any components removed by Coast Guard personnel at the beginning of the contract shall be reinstalled by Coast Guard personnel at the end of the contract.3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2012 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Std Spec 8634, Drydocking, Appendix A, page A5, paragraph A2.7.1.3 Side Blocks: Remove formula value shown as g – Acceleration of gravity – 32.3 Ft/sec2, and replace with formula value g - Acceleration of gravity - 32.174 ft/sec2.
3 (Rev-0)
3.7.2 SFLC Std Spec 0740, Welding and Allied Processes. SFLC Std Spec 0740 added Appendix E, Stray Current Protection: New Appendix is posted with SFLC Standard Specifications as a separate document on internet and intranet webpage.
3.7.2.1 SFLC Std Spec 0740, page 1, paragraph 1.2 Appendices: Add ‘Stray Current Protection’ to ‘Process Standard column of appendices table. Add ‘E’ to ‘Appendix’ column of appendices table.
3.7.2.2 SFLC Std Spec 0740, page 4, paragraph 3.1.3 Stray current protection: Add “The Contractor shall meet all requirements for stray current protection as specified in Appendix E - Stray Current Protection.” directly after paragraph 3.1.3 title.
3.7.2.3 SFLC Std Spec 0740, page 4, paragraph 3.1.3 Stray current protection: Delete paragraphs 3.1.3.1 and 3.1.3.2.
3.7.3 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 1, paragraph 1.1 Intent:
Add sentence, “Note that stray current protection for welding equipment is covered in SFLC Standard Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.7.3.1 SFLC Std Spec 0450, page 5, paragraph 3.4 Equipment Grounding: Add sentence, “Stray current protection for welding equipment is covered in SFLC Standard Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.7.3.2 SFLC Std Spec 0450, page 6, paragraph 3.4 Equipment Grounding: Delete paragraphs 3.4.1.4 and 3.4.1.5.
3.7.3.3 SFLC Std Spec 0450, page 6, paragraph 3.4 Equipment Grounding: Delete Figure 5.
3.7.4 SFLC Std Spec 0000, General Requirements, Appendix A Requirements for Environmental Protection has been superseded by SFLC Std Spec 0000, General Requirements, Appendix A Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, with addition of SFLC Std Spec 0000 Appendix B Requirements for Environmental Protection at USCG Facilities. The new Appendices are posted with SFLC Standard Specifications as separate documents on SFLC Standard Specification webpage.
3.7.4.1 SFLC Std Spec 0000, page 22, paragraph 3.3.3.1 NOTE. Add "Flame-retardant polyethylene deck plate with a non-slip diamond pattern from 10 to 40mil thickness" to body of Note.
3.7.4.2 SFLC Std Spec 0000, page 3, bullet “ISC.” Delete “lead-contaminated materials.”
3.7.4.3 SFLC Std Spec 0000, page 27, after Note box under paragraph 3.3.13.1.2 add the following paragraphs:
“3.3.13.1.3 Dock and Sea trials. The Contractor shall conduct dock trials to test the work performed during the contract when required by individual work items (see 3.3.13 Tests and Inspections). This shall include operational tests or inspections, as appropriate, of all machinery, piping, wiring, insulation, preservation work, deck coverings, and any other article removed, moved, disturbed, or damaged by the Contractor in accomplishing the work outlined in the specification. Schedule for these specific dockside tests or inspections shall be included within the planning document (see 3.2.5 Planning document).
3.3.13.1.3.1 The Contractor shall provide a pier facility or allow the vessel to move to a Coast Guard pier to support dock trials. The Contractor shall not conduct trials that require the vessel to be waterborne while the vessel is floating inside a dock (e.g., graving dock, floating drydock).
4 (Rev-0)
3.3.13.1.3.2 Sea trials to conduct equipment operational tests are not required unless a Sea Trial Performance work item is specifically included within the specification.”
3.7.4.4 SFLC Std Spec 0000, page 11, paragraph 3.2.5, add the following bullets to the bulleted list:
• Identifies the “critical paths” for the project.
• Shows calculations for the “float” along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.
3.7.4.5 SFLC Std Spec 0000, page 11, Add the following Note between paragraphs 3.2.5 and 3.2.5.1:
NOTE
Float is the number of days that the critical paths can be delayed without affecting the final delivery date.
3.7.4.6 SFLC Std Spec 0000, page 12, add the following paragraphs and Note after Figure 1:
“3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained.
Submit the resource constraint and scheduling evaluation via a CFR.
NOTE
The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to ‘crash’ the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.”
3.7.4.7 Std Spec 0000, General Requirements, page 4, paragraph 1.3 Acronyms and term definitions, “Paint Containing Lead” remove lead content percent of “0.06 percent by weight (0.12 mg/cm2, or 600 ppm)” and replace with “0.009 percent by weight (0.018 mg/cm2, or 90 ppm)”
3.7.5 SFLC Std Spec 6310, Requirements For Preservation Of Ship Structures, page 10, add “3.1.6.5 Preconstruction Primers. Also known as shop primers, preconstruction primers are used as a temporary coating to protect steel from corrosion during welding, storage, and fabrication. Preconstruction primers shall be removed prior to applying the permanent coating system on all critical coated surfaces. Preconstruction primers may be left in place in other interior areas (such as machinery spaces, habitability spaces, etc.) if they are intact, uncontaminated, and compatible with the overcoating system.”
3.7.5.1 Std Spec 6310, Appendix B, page B12 , the formatting for of Notes 17-19 change and add as per the following:
• SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Note 17, delete sentence, “Persistent corrosion in a particular area of an aluminum bilge may dictate the need for a protective High Build Epoxy coating to be applied to that local area.”
• SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Note 18, replace entire note with “Persistent corrosion in a particular area of an aluminum bilge may dictate the need for a protective High Build Epoxy coating to be applied to that local area. “
• SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Note 19, replace entire note with “Painting plastic surfaces is highly discouraged, but after it is done once, it must be maintained.”
• SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Add Note “20. For aluminum surfaces, remove all oil, grease, dirt, metal oxides (corrosion products) and other foreign
5 (Rev-0) material by cleaning per SSPC-SP 1 prior to blast cleaning and following blast cleaning immediately prior to coating. The end result of abrasive blasting will be a surface cleanliness similar to that of SSPC-SP 10 for steel with all coating removed.
3.7.5.2 Std Spec 6310, Appendix E, pages E1, E3, and E4, QA Inspection Forms QA-1, QA-3a, and QA-3b respectively, reference The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. 5 erroneously, and are corrected as per the following:
3.7.5.2.1 Std Spec 6310, Appendix E, pages E1, QA Inspection Form QA-1, Check point 5- Surface Preparation, check box description 2, replace “(i.e.: SSPC SP-12, SP-11, SP-10…).” with “(i.e.: SSPC SP-11, SP-10, SP WJ- 2…).”
3.7.5.2.2 Std Spec 6310, Appendix E, page E3, QA Inspection Form QA-3a, Surface Preparation Method column of the Profile Achieved table, 2nd record, replace “SSPC-SP-12/NACE No. 5” with “SSPC-SP WJ-1/NACE WJ- 1”.
3.7.5.2.2.1 Add record to table beneath “SSPC-SP WJ-1/NACE WJ-1” and label as “SSPC-SP WJ-2/NACE WJ- 2”
3.7.5.2.2.2 Add record to table beneath “SSPC-SP WJ-2/NACE WJ-2” and label as “SSPC-SP WJ-3/NACE WJ- 3”
3.7.5.2.2.3 Add record to table beneath “SSPC-SP WJ-3/NACE WJ-3” and label as “SSPC-SP WJ-4/NACE WJ- 4”
3.7.5.2.3 Std Spec 6310, Appendix E, page E4, QA Inspection Form QA-3b, Surface Preparation Method column of the Profile Achieved table, 2nd record, replace “SSPC-SP-12/NACE No. 5” with “SSPC-SP WJ-1/NACE WJ- 1”.
3.7.5.2.3.1 Add record to table beneath “SSPC-SP WJ-1/NACE WJ-1” and label as “SSPC-SP WJ-2/NACE WJ- 2”
3.7.5.2.3.2 Add record to table beneath “SSPC-SP WJ-2/NACE WJ-2” and label as “SSPC-SP WJ-3/NACE WJ- 3”
3.7.5.2.3.3 Add record to table beneath “SSPC-SP WJ-3/NACE WJ-3” and label as “SSPC-SP WJ-4/NACE WJ- 4”
3.7.6 SFLC Std Spec 8635, Temporary Services, page 2, delete paragraph 3.3.2.2.
3.7.7 SFLC Std Spec 5000, Auxiliary Machine Systems, Appendix C, page C9: Replace paragraph C2.8.1.3 and Table C-3, and add additional paragraphs C2.8.1.4, C2.8.1.5, and C2.8.1.6. as follows:
“C2.8.1.3 Flushing fluid minimum flow rate requirements. Ensure the minimum flow rates provided in Table C- 3 are maintained for each circuit. If multiple loops are flushed concurrently, each loop shall be provided with a flow measuring device. Provide calibrated flow meters. Prior to flushing, submit the certification of calibration to the CG Inspector.
TABLE C-3 - MINIMUM FLOW RATE FOR FLUSHING WITH FLUID
PIPE SIZE INSIDE DIA GAL/MIN
6 (Rev-0)
(INCH)
To 0.5 18
0.5 to 0.75 34
0.75 to 1.0 56
1.0 to 1.25 100
1.25 to 1.5 138
1.5 to 2.0 230
2.0 to 2.5 330
2.5 to 3.0 420
NOTES
1. Flow rates represent minimum flows needed to achieve a turbulent flow condition and maximize benefits of flushing effort.
2. Flow rate selected for flow velocity of 25 ft/sec in the schedule 80/160 pipe, as applicable. If there is a conflict between the pressure and flow rate requirements of this specification, the minimum flow rates shall be governing, unless the working pressure of the system is exceeded. The uses of by-pass (flow control) valves are not allowed downstream of the flow meters.
C2.8.1.4 Whenever a noticeable increase in the pressure drop across strainers is observed, the strainers should be cleaned and bag renewed. Be aware that this may occur as frequency as 15 min intervals.
C2.8.1.5 During flushing, constant monitoring of the flushing oil must be maintained in order to determine the contamination level. Filtering shall continue until the fluid entering the return flow filter meets the particle population ISO cleanliness code of 17/14, in accordance with ISO 4406. All flushing fluid shall pass through the return filter after passing through each system flushing circuit. All samples shall be taken at a point just prior to this filter
C2.8.1.6 Take a representative sample of oil from the hydraulic system of the hydraulic system. Send samples out for laboratory analysis. Analysis shall include viscosity, moisture, total acid number, particle size and population in sufficient detail to determine ISO cleanliness code of 17/14, in accordance with ISO 4406. Submit CFR.”
3.7.8 SFLC Std Spec 6341, Appendix A, Paragraph A2.1.1, replace with “A2.1.1 Cove vase. Include a cove base, using the same epoxy resin deck covering system material, to a maximum height of four inches at all adjacent vertical bounding surfaces, where applicable."
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
7 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
8 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL.
HUMID-
ITY DEW
PT. SURFACE AMBIENT
ΔT
| DP -
Surface |
9 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
10 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
11 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
12 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
13 (Rev-0)
24000_AKP_0214_45RBM
WORK ITEM 1: Main Diesel Engine to Auragen Generator, Align
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to align the Main Diesel Engine to the Auragen Generator.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
Y *MDE/ TO GENERATOR
ALIGNMENT TOOL
PN: MMRBM0030 01
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RBM 311-004, Rev C, APU Generator Drive System
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.2 Main Diesel Engine to Auragen Generator
• 3.3 Final Steps
3.1.2 Tech Rep.
14 (Rev-0)
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
CAUTION
Prior to step 3.2, the Coast Guard crew will complete Red Danger Tags IAW COMDTINST 9077.1 (series) and attach them to the following: Circuit Breaker CB2, ENGINE PRIMARY, Power Panel 24 VDC ENGINE BUS 24P2, “OFF”; and Circuit Breaker CB1, ENGINE SECONDARY, Power Panel 24 VDC VITAL BUS 24P1, “OFF”.
NOTE
See COTR and Coast Guard Drawing for any questions related to alignment of MDE to Auragen Generator.
3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a
CFR.
3.2 Alignment. The Contractor shall align the Main Diesel Engine to the Auragen Generator in accordance with Coast Guard Drawing 45 RBM 311-004.
3.2.1 Remove the Generator Drive Shaft. The Contractor shall remove the three roll pins (Refer to Figure 1) from the OHLA Shaft Flange. Install the MDE-Generator Alignment Tool, P/N:
MMRBM0030, as follows:
CAUTION
The three shoulder bolts of the MDE - Generator Alignment Tool are to secure and align the MDE alignment flange to the MDE adapter.
Do not use the three shoulder bolts to secure the generator alignment flange to the overhung load adapter shaft. Failure to adhere to this caution can result in misalignment of the MDE to the generator and damage the generator drive shaft.
3.2.2 Align the Generator Alignment Tool Flange (Refer to Figure 2) (1) to the Overhung Load Adapter (OHLA) Shaft (2). Install the three bolts (3) to secure the Generator Alignment Tool Flange to the OHLA Shaft. Slide the Alignment Sleeve (4) onto the Generator Alignment Pin.
15 (Rev-0)
Align the MDE Alignment Tool Flange (5) to the MDE Adapter (6). Install the three shoulder bolts (7) to secure the MDE Alignment Tool Flange to the MDE Adapter. Submit a CIR.
CAUTION
Do not force the alignment sleeve when checking MDE-To-Generator alignment. Forcing the alignment sleeve will cause the alignment sleeve to bind, damaging the surfaces of the alignment sleeve and the alignment sleeve pins.
3.2.3 Check MDE Generator Alignment. Slide the Alignment Sleeve (Refer to Figure 3), (1) towards the MDE Adapter (2). Verify the Alignment Sleeve slides to the MDE Alignment Pin mark (3) using finger force. Slide the Alignment Sleeve towards the OHLA Shaft (4). Verify the Alignment Sleeve slides to the Generator Alignment Pin mark (5) using finger force. Alignment is satisfactory if the Alignment Sleeve slides to each alignment pin mark using finger force.
Proceed to 3.2.3.1. Alignment is unsatisfactory if the Alignment Sleeve does not slide to each alignment pin mark using finger force.
3.2.3.1 The Contractor shall check the offset distance of the alignment pins as follows: Measure the offset distance between the two alignment pins (Refer to Figure 4). Adjust MDE Alignment.
3.3 Final Steps. The Contractor shall remove the MDE-Generator Alignment Tool as follows:
Remove the three shoulder bolts (Refer to Figure 2), (7) that secure the MDE Alignment Tool Flange (5) to the MDE Adapter (6). Remove the MDE Alignment Tool Flange from the MDE Adapter. Remove the Alignment Sleeve (4) from the Generator Alignment Tool (1). Remove the three bolts (3) that secure the Generator Alignment Tool Flange to the OHLA Shaft (2). Remove the Generator Alignment Tool Flange from the OHLA Shaft. Install the three roll pins (Refer to Figure 1), (1) to the OHLA Shaft Flange (2). Install the Generator Drive Shaft. Submit a CIR.
CAUTION
The Coast Guard will remove Red Danger Tags IAW COMDTINST
9077.1 (series) from the following and place in the normal operational position: Circuit Breaker CB2, ENGINE PRIMARY, Power Panel 24 VDC ENGINE BUS 24P2. Circuit Breaker CB1, ENGINE SECONDARY, Power Panel 24 VDC VITAL BUS 24P1.
Coast Guard personnel will operate all vessel machinery and equipment.
3.4 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
16 (Rev-0)
FIGUIRE 1. OHLA SHAFT FLANGE ROLL PINS
17 (Rev-0)
FIGURE 2. MDE - GENERATOR ALIGNMENT TOOL
18 (Rev-0)
FIGURE 3. MDE - GENERATOR ALIGNMENT CHECK
19 (Rev-0)
FIGURE 4. MDE - GENERATOR ALIGNMENT PIN OFFSET MEASUREMENT
4. NOTES
4.1 Operational test. Coast Guard personnel will operate all vessel machinery and equipment.
20 (Rev-0)
24100_AKP_0214_45RBM
WORK ITEM 2: Main Diesel Engine To Jet Drive, Align
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to align the Main Diesel Engine(s) to the Jet Drive(s).
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
Y * MDE/ TO JET DRIVE
ALIGNMENT TOOL
PN: MMRBM0451 1 ea
Y * ENGINE LIFTING BAR PN: MMRBM0956 1 ea *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RBM 201-001, Rev B, Main Engine Arrangement Coast Guard Drawing 45 RBM 247-002, Rev C, Water Jet Propulsor Arrangement
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.2.1 Main Diesel Engine to Jet Drive
• 3.3 Adjust MDE/ Jet Drive Alignment
• 3.4 Adjust MDE Alignment
21 (Rev-0)
• 3.5 Final Step
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
• Primary Fuel Filter Assembly
• Marine Interface Module
3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a
CFR.
NOTE
See COTR and Coast Guard drawing for any questions related to alignment of main diesel engine to Auragen generator.
CAUTION
The Coast Guard crew shall complete Red Danger Tags IAW COMDTINST 9077.1 (series) and attach them to the following:
Circuit Breaker CB2, ENGINE PRIMARY, Power Panel 24 VDC
ENGINE BUS 24P2, “OFF”.
Circuit Breaker CB1, ENGINE SECONDARY, Power Panel 24 VDC
VITAL BUS 24P1, “OFF”.
Affected MDE Propulsion Raw Water Suction Valve, Lazarette, “CLOSED”.
Affected MDE Propulsion Raw Water De-Icing Valve, Lazarette, “CLOSED”. e.Affected MDE Fuel Shutoff Valve, Engine Room, “CLOSED”.
Affected MDE Secondary Fuel Filter Shutoff Valve, Engine Room, "CLOSED".
22 (Rev-0)
Ensure measures are taken to collect any fuel that spills from disconnected fuel lines.
3.2 Alignment. The Contractor shall align the Main Diesel Engine(s) to the Jet Drive(s) in accordance with Coast Guard Drawings 45 RBM 201-001 and 247-002.
3.2.1 Main Diesel Engine to Jet Drive. The Contractor shall open the associated Engine Access Hatch. Remove the Cardan Shaft. Remove the Primary Fuel Filter Assembly. Remove the Marine Interface Module. Install the MDE - Jet Drive Alignment Tool, P/N: MMRBM0451, as follows. Submit CIR.
• Align the MDE Alignment Tool Flange (Refer to Figure 1), (1) to the Reduction Gear Output Flange (2).
• Install the four bolts (3) to secure the MDE Alignment Tool Flange to the Reduction Gear…