UNITED STATES COAST GUARD
Pratt & Whitney FT4A Gas Generators and Modules
Used on 378’ WHEC /400’ WAGB Cutters
As Auxiliary Propulsion
REQUEST FOR PROPOSAL
SOLICITATION NO. HSCG40-12-R-30005
COMMANDING OFFICER
U.S. COAST GUARD
SURFACE FORCES LOGISTICS CENTER
PROCUREMENT BRANCH 2/LREPL
2401 HAWKINS POINT ROAD
BALTIMORE, MD 21226-5000
Prepared by: Tara Upchurch Date: 01/31/12
Version: Final
RFP HSCG40-12-R-30005
Gas Generator and Generator Modules Page 2 of 38
OMBUDSMAN
NOTICE FOR FILING AGENCY PROTEST
It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file formal agency protest with the Contracting Officer or Ombudsman.
Informal forum with the Ombudsman. Interested parties who believe that Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant Contracting Officer. If the Contracting Officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to the address below:
Commandant (CG-913) U.S. Coast Guard Headquarters
Acquisition Planning and Performance Measurement 1900 Half St. S.W. Room 11-0402
Washington, DC 20593 Telephone (202) 372-3692
Gas Generator and Generator Modules Page 3 of 38
TABLE OF CONTENTS
DESCRIPTION PAGE(S)
Solicitation/Contract Form 1449 (Attachment 1) 4
Addendum to Standard Form 1449 Supplies/Services 6 Contract Line Items (Attachment 2) 7 Deliverable List 8 Specification and Appendices to Specification (Attachments 3-5) 9 Delivery Information 10 Block 18A, Additional Payment Information 11
Contract Administration Data 12
Addendum to FAR Clause 52.212-4, Contract Terms and Conditions –Commercial Items 14
FAR Clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items
15-19
FAR 52.212-2, Evaluation – Commercial Items 27-28
FAR Clause 52.212-3, Offeror Representations and Certifications – Commercial Items 29-36
Gas Generator and Generator Modules Page 4 of 38
See Attachment 1 – SF 1449
Gas Generator and Generator Modules Page 5 of 38
ADDENDUM
TO
STANDARD FORM 1449
Gas Generator and Generator Modules Page 6 of 38
SUPPLIES OR SERVICES AND PRICES/COSTS
The U.S. Coast Guard Surface Forces Logistics Center intends on awarding a Firm-Fixed Price requirements contract, with one base year and four optional years, for the overhaul/repair of Cost Guard owned Pratt & Whitney FT4A Gas Generators and Gas Generator Modules, installed onboard ten (10) 378’ WHEC class cutters and two (2) 400’ WAGB class icebreakers. The contract will be issued to one (1) repair facility, capable of successfully supplying OEM parts and an OEM technical representative, found to be the best value, lowest price technically acceptable in accordance with FAR part 15.101.2 and as described in the Coast Guard specification.
The contractor shall perform all functions necessary to provide the commercial item described herein. All repairs/overhauls shall be completed in accordance with SFLC specification number R-234-0168 dated 02/11 and applicable technical documents enclosed in the attachment section of this solicitation/contract. The specification will be incorporated into the contract upon award. Repairs shall comply with all applicable Federal, State, and local laws, regulations, codes and directives. The Contractor will provide the necessary reports as prescribed in the specification.
*Note, unless otherwise stated: All prices on below CLINS shall be a firm fixed price for each gas generator and module.*
Gas Generator and Generator Modules Page 7 of 38
CONTRACT LINE ITEMS
See attached Schedule, which will be included in solicitation/contract after Offeror Completion. (Attachment 2)
Gas Generator and Generator Modules Page 8 of 38
DELIVERABLE LIST
(APPLIES TO BASE YEAR AND ALL OPTION YEARS EXERCISED)
*NOTE: All Quantities will be as specified in each delivery order.
CLIN Description Qty Days After Issuance of a Delivery Order
B.1 Initial Receiving Report IAW 3.2.1 4 7 calendar days after receipt of any GFP
B.2 Disassembly Condition, Dirty Inspection Report
IAW 3.2.2
4 28 calendar days after receipt of any GFP
B.3 Disassembly Condition, Clean Inspection Report
IAW 3.2.3
4 45 calendar days after authorization to proceed by the Contracting Officer
B.4 Reassembly Report IAW 3.2.4 4 14 calendar days after completion of final acceptance test
B.5 OEM Summary Report IAW 3.2.6 4 14 calendar days after completion of final acceptance test
B.6 GFP/GFM Report IAW 3.2.7 4 7 calendar days after receipt of discrepant GFP/GFM
B.7 Warranty Report IAW 3.2.8 1 7 calendar days after the completion of any warranty issue.
B.8 Data File Preliminary/Sample Version IAW 3.4 1 60 calendar days after contract award
B.9 Certificate of Conformance IAW 3.1.7 4 Prior to the acceptance of completed GG or module
B.10 OEM Representative resume IAW 3.13.2 1 15 calendar days after contract award
B.11 Quality Control Program IAW 4.3 1 15 calendar days after contract award
B.12 Calibration System IAW 4.4 1 15 calendar days after contract award
B.13 Government Property Reports 1 9/15 of each year
B.19 Overhaul of GG or module IAW 3.11 4 70 calendar days after approval of B.3
B.31 Test Report IAW 3.2.5 3 14 calendar days after completion of final acceptance testing
* All other items not specifically identified above shall be completed during the same time frame as B.19 (including corresponding option years).
Gas Generator and Generator Modules Page 9 of 38
SPECIFICATION AND APPENDICES TO SPECIFICATION
All gas generators and modules to be overhauled under this contract and required reports shall be accomplished in accordance with the following specifications:
A. Specification No. R-234-0168, entitled Overhaul Specification for Pratt & Whitney Model FT4A Gas Generator and Gas Generator Modules, Revision H, dated 02/2011. (Attachment 3)
B. Specification No. D-000-0100, entitled Bar Coding for US Coast Guard SFLC Manual, Revision G, dated 02/23/06.
(Attachment 4)
C. Brand Name Certification.
All items listed in the CLINS and Specification is parts manufactured by Wood Group Pratt & Whitney, the original manufacturer (OEM). To assure proper Form, Fit and Function of the parts to the gas turbine, only Original Equipment Manufacturers (OEM) parts shall be used. Items submitted under this solicitation which are other than OEM parts will be rejected as unacceptable. (Brand Name Certification Attachment.5)
Gas Generator and Generator Modules Page 10 of 38
DELIVERY INFORMATION
Shipping
Unless otherwise directed on the Delivery Order, all Gas Generators and Generator Modules that are repairable or not, shall be delivered F.O.B. Origin to the following address:
Commanding Officer USCG Surface Forces Logistics Center Receiving Room, Bldg. 88 2401 Hawkins Point Road Baltimore, MD 21226 M/F: Contract Number {** to be furnished at time of award} M/F: Delivery Order Number {** to be furnished with each individual delivery order}
*Receiving room hours are 7am to 1pm EST Monday through Friday.
All required data and/or documentation shall be:
a. Furnished electronically to the following email address, or:
Tara.N.Upchurch@uscg.mil
b. mailed F.O.B. Destination to the following mailing address:
Tara Upchurch / Scott Wood USCG Surface Forces Logistics Center Long Range Enforcer Product Line, Mail Stop 26 2401 Hawkins Point Road Bldg 3, 2nd Floor Baltimore, MD 21226
Note:
The Government reserves the right to request Direct Delivery. Each individual task order will identify the delivery destination.
Failure to prepare for shipment any item, and/or mark all packages, boxes, etc., as indicated herein shall result in rejection of the shipment and return of the shipment at the contractor’s expense.
Gas Generator and Generator Modules Page 11 of 38
BLOCK 18A, ADDITIONAL PAYMENT INFORMATION
Invoicing Instructions All services ordered under this Contract shall be billed once the work has been completed and received by the Surface Forces Logistics Center. The Contractor shall submit invoices to the following payment address:
U.S. Coast Guard Yard P.O. Box 4122 Chesapeake, VA 23327-4122 M/F: Contract Number/Delivery Order Number (To be furnished at the time of contract award)
Invoices may also be submitted electronically by accessing and completing the invoice form found at FIN-SMB-YardTeam@uscg.mil.
All invoices must contain the following information to constitute a proper invoice:
(1) Name and address of Contractor
(2) Invoice date
(3) Contract Number
(4) Description, quantity, unit of measure, unit price and extended price
(5) Terms of any prompt payment discounts offered
(6) Dun & Bradstreet (DUNS) Number
(7) Federal Tax Identification Number
(8) Name, title, and telephone number of individual to be notified upon receipt of improper invoice(s).
Failure to submit a complete invoice to the office listed above may delay payment of invoices. Invoices shall be processed in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) Circular A-125, Prompt Payment. The Contractor is encouraged to assign an identification number to each invoice.
In addition, all contractors are required to be registered in the Central Contractor Registration (CCR) database. A Data Universal Numbering System (DUNS) number is the primary identifier in CCR. Contractors are located and identified in CCR by their Duns number. Therefore, to facilitate payment, it is in the Contractor’s best interest to ensure that the Duns number is recorded on every invoice submitted to the U.S.C.G.
For more information on CCR, and to register online, simply visit the CCR website at https://www.bpn.gov/ccr/default.aspx or call the Coast Guard Finance Center Service line at (757) 523-6940. Offerors must be registered in the CCR database no later than the date of award.
mailto:FIN-SMB-YardTeam@uscg.mil&subject=Coast%20Guard%20Yard%20Email%20Invoice https://www.bpn.gov/ccr/default.aspx
Gas Generator and Generator Modules Page 12 of 38
CONTRACT ADMINISTRATION
The Contracting Officer or authorized representative, located at the U.S. Coast Guard Surface Forces Logistics Center, 2401 Hawkins Point Road, Baltimore, MD 21226-5000, shall be the contract administrator of this contract – Tara Upchurch, (410) 762-6442, tara.n.upchurch@uscg.mil.
Notification of administrative matters
If at any time during the performance of this contract, administrative problems should arise which will have an adverse impact on timely performance by the Contractor or affect the contract prices or funding, the Contractor is required to immediately notify the Contract Administrator identified above.
Unauthorized Instructions from Government Personnel
(a) The Contractor shall not accept any instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer or the Contracting Officer’s Technical Representative acting within the limits of their authority. A Contracting Officer’s Technical Representative shall be designated in writing to the Contractor and shall set forth the scope of their authority.
(b) No information, other than that which may be contained in an authorized amendment to this purchase instrument duly issued by the Contracting Officer, which may be received from any person employed by the Government or otherwise will be considered as grounds for deviation from any stipulations of the purchase instruments.
Government Representatives
(a) The Government may, upon contract award or thereafter, name representatives with titles such as Project Officer, Contracting Officer's Technical Representative(s), and so on. Such individuals, IF APPOINTED, will be named in writing by the Contracting Officer. The letter of appointment will indicate the individuals, titles, and stipulate the rights, responsibilities, and limitations of their appointment.
(b) In any event, no such named individual has the authority to issue any direction under this contract, either technical or otherwise, which constitutes a change to the terms, conditions, and price or delivery schedule of the contract. ONLY the Contracting Officer is authorized to alter the contract in any manner.
Standard Commercial Warranty
If the item(s) required in the contract resulting from this solicitation are customarily warranted in the trade by a standard commercial warranty, such warranty shall be incorporated into this contract and thereby provided to the Government at no additional cost. Any standard commercial warranty provided shall be identical to the standard commercial warranty normally offered by the Contractor to the Contractor's most favored customer.
Offerors are requested to state the terms and conditions of their standard commercial warranty in the space provided below and attach a copy of the warranty terms with their offer.
mailto:tara.n.upchurch@uscg.mil
Gas Generator and Generator Modules Page 13 of 38
FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JAN 2011)
(a) Definitions. As used in this provision— “Administrative proceeding” means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
“Federal contracts and grants with total value greater than $10,000,000” means—
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
“Principal” means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror [ ] has [ ] does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in—
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the Central Contractor Registration database at http://www.ccr.gov (see 52.204-7).
http://www.ccr.gov/
Gas Generator and Generator Modules Page 14 of 38
ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS
ADDITIONAL TERMS AND CONDITIONS
Additional terms and conditions applicable to this Agreement are as follows.
The following Federal Acquisition Regulation (FAR) Clauses are hereby incorporated into this Agreement by reference with the same force and effect as if incorporated in full text. Also, the full text of a clause may be accessed electronically at www.arnet.gov.
http://www.arnet.gov/
Gas Generator and Generator Modules Page 15 of 38
52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Jan 2012)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
____ Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
_X__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
__X_ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Jul 2010) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Jul 2010) (Pub.
L. 111-5).
__X_ (6) 52.209-6, Protecting the Government’ Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Dec 2010) (31 U.S.C. 6101 note).
_X__ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jan 2012) (41 U.S.C. 2313).
_ __ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (section 740 of Division C of Public Law 111-117, section 743 of Division D of Public Law 111-8, and section 745 of Division D of Public Law 110-161).
___ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
___ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (11) [Reserved]
___ (12) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).
___ (ii) Alternate I (Nov 2011).
Gas Generator and Generator Modules Page 16 of 38
___ (iii) Alternate II (Nov 2011).
___ (13) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
__X_ (14) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)).
__X_ (15) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637 (d)(4).)
___ (ii) Alternate I (Oct 2001) of 52.219-9.
_X__ (iii) Alternate II (Oct 2001) of 52.219-9.
___ (iv) Alternate III (July 2010) of 52.219-9.
___ (16) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
___ (17) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).
__X_ (18) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
___ (19) (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
___ (ii) Alternate I (June 2003) of 52.219-23.
___ (20) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Dec 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
___ (21) 52.219-26, Small Disadvantaged Business Participation Program—Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
___ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).
___ (23) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C.
632(a)(2)).
___ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns (Nov 2011).
___ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Nov 2011).
__X_ (26) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
__X_ (27) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jul 2010) (E.O. 13126).
__X_ (28) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
__X_ (29) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
_X__ (30) 52.222-35, Equal Opportunity for Veterans (Sep 2010) (38 U.S.C. 4212).
Gas Generator and Generator Modules Page 17 of 38
_X__ (31) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).
_X__ (32) 52.222-37, Employment Reports on Veterans (Sep 2010) (38 U.S.C. 4212).
_X__ (33) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
__X_ (34) 52.222-54, Employment Eligibility Verification (Jan 2009). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
___ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (36) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
___ (37) (i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).
___ (ii) Alternate I (Dec 2007) of 52.223-16.
__X_ (38) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011).
___ (39) 52.225-1, Buy American Act--Supplies (Feb 2009) (41 U.S.C. 10a-10d).
___ (40) (i) 52.225-3, Buy American Act--Free Trade Agreements--Israeli Trade Act (June 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, and 110-138).
___ (ii) Alternate I (Jan 2004) of 52.225-3.
___ (iii) Alternate II (Jan 2004) of 52.225-3.
_X__ (41) 52.225-5, Trade Agreements (Nov 2011) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X__ (42) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
___ (43) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
___ (44) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
___ (45) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
___ (46) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C.
2307(f)).
_X__ (47) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct. 2003) (31 U.S.C. 3332).
Gas Generator and Generator Modules Page 18 of 38
___ (48) 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration (May 1999) (31 U.S.C. 3332).
___ (49) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332).
___ (50) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
___ (51) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
___ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
___ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
___ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
___ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C.206 and 41 U.S.C. 351, et seq.).
___ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
___ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).
___ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Feb 2009) (41 U.S.C. 351, et seq.).
___ (7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L. 110- 247).
___ (8) 52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215- 2, Audit and Records -- Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
Gas Generator and Generator Modules Page 19 of 38
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items.
Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
(ii) 52.219-8, Utilization of Small Business Concerns (Dec 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) [Reserved]
(iv) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Veterans (Sep 2010) (38 U.S.C. 4212).
(vi) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).
(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(viii) 52.222-41, Service Contract Act of 1965, (Nov 2007), (41 U.S.C. 351, et seq.)
(ix) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).
___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.)
(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-- Requirements (Feb 2009) (41 U.S.C. 351, et seq.)
(xii) 52.222-54, Employment Eligibility Verification (Jan 2009).
(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xiv) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
Gas Generator and Generator Modules Page 20 of 38
FAR 52.216-21 REQUIREMENTS (OCT 1995)
(a) This is a requirements contract for the supplies or services specified and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated’’ or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) The estimated quantities are not the total requirements of the Government activity specified in the Schedule, but are estimates of requirements in excess of the quantities that the activity may itself furnish within its own capabilities. Except as this contract otherwise provides, the Government shall order from the Contractor all of that activity’s requirements for supplies and services specified in the Schedule that exceed the quantities that the activity may furnish within its own capabilities.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after receipt of final delivery order before contract expiration.
Alternate I (Apr 1984). If the requirements contract is for nonpersonal services and related supplies and covers estimated requirements that exceed a specific Government activity’s internal capability to produce or perform, substitute the following paragraph (c) for paragraph (c) of the basic clause:
(c) The estimated quantities are not the total requirements of the Government activity specified in the Schedule, but are estimates of requirements in excess of the quantities that the activity may itself furnish within its own capabilities. Except as this contract otherwise provides, the Government shall order from the Contractor all of that activity’s requirements for supplies and services specified in the Schedule that exceed the quantities that the activity may furnish within its own capabilities.
(End of Clause)
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor thirty (30) calendar day prior to the expiration of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 calendar days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.
FAR 52.233-2 Service of Protest (Sept 2006)
(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer by obtaining written and dated acknowledgment of receipt from Scott Wood (address as follows)
Address: U.S. Coast Guard Surface Forces Logistics Center
CPD C&P-2 LRE
2401 Hawkins Point Road Baltimore, MD 21226
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision) http://www.arnet.gov/far/current/html/Subpart 31_1.html#wp1089550
Gas Generator and Generator Modules Page 21 of 38
CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR)
(a) GENERAL: The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror’s past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part 42.15. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.
(b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 30 days to respond to the SLFC’s assessment of its performance entered into CPARS. The contractor’s response, if any, will be made part of the CPAR system.
(c) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor’s record of conforming to contract requirements and to standards of good workmanship; the contractor’s record of forecasting and controlling costs; the contractor’s adherence to contract schedules, including the administrative aspects of performance; the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor’s record of integrity and business ethics, and generally, the contractor’s business-like concern for the interest of the customer.
(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the contractor.
Gas Generator and Generator Modules Page 22 of 38
FAR 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS (APR 1984)
The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the supplies or services furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. This clause takes precedence over any Government inspection and testing required in the contract’s specifications, except for specialized inspections or tests specified to be performed solely by the Government.
52.246-2 INSPECTION OF SUPPLIES—FIXED-PRICE (AUG 1996)
(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes re-inspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time—
(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and
(ii) When the supplies will be ready for Government inspection.
(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.
Gas Generator and Generator Modules Page 23 of 38
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract.
Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in paragraph (l) (1) or (l) (2) of this clause and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
(End of clause)
FAR 52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)
(a) Definitions. As used in this clause—
“Acceptance” means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing supplies, or approves specific services as partial or complete performance of the contract.
“Supplies” means the end items furnished by the Contractor and related services required under the contract. The word does not include “data.”
(b) Contractor’s obligations.
(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for 1 year of installation or 1000 operating hours, whichever occurs first AND 24 months of storage on entire Engine is required –
(i) All supplies furnished under this contract will be free from defects in material or workmanship and will conform with all requirements of this contract; and
(ii) The preservation, packaging, packing, and marking, and the preparation for, and method of, shipment of such supplies will conform to the requirements of this contract.
(2) When return, correction, or replacement is required, transportation charges and responsibility for the supplies while in transit shall be borne by the Contractor. However, the Contractor’s liability for the transportation charges shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the place of delivery specified in this contract and the Contractor’s plant, and return.
(3) Any supplies or parts thereof, corrected or furnished in replacement under this clause, shall also be subject to the terms of this clause to the same extent as supplies initially delivered. The warranty, with respect to supplies or parts thereof, shall be equal in duration to that in paragraph (b) (1) of this clause and shall run from the date of delivery of the corrected or replaced supplies.
(4) All implied warranties of merchantability and “fitness for a particular purpose” are excluded from any obligation contained in this contract.
(c) Remedies available to the Government.
Gas Generator and Generator Modules Page 24 of 38
(1) The Contracting Officer shall give written notice to the Contractor of any breach of warranties in paragraph (b) (1) of this clause within 45 calendar days after discovery of the defect.
(2) Within a reasonable time after the notice, the Contracting Officer may either –
(i) Require, by written notice, the prompt correction or replacement of any supplies or parts thereof (including preservation, packaging, packing, and marking) that do not conform with the requirements of this…