Contract Line Items

Base Year – Mandatory Items

NSP- Not separately priced items. Costs associated with these items should be incorporated within the costs to overhaul/repair.

CLIN Item Description Est.

Qty Unit of Issue

Unit Cost Total Cost

B.0.1 Initial Receiving Report IAW with

Paragraph 3.2.1

4 EA $_________ $_________

B.0.2 Disassembly Condition, Dirty Inspection

Report for Gas Generator and modules A-F IAW with paragraph 3.2.2

B.0.3 Disassembly Condition, Clean Inspection

IAW with paragraph 3.2.3

B.0.4 Reassembly Report for Gas Generator and modules A-F IAW paragraph 3.2.4

B.0.5 OEM Summary Report for Gas Generator and modules A-F IAW paragraph 3.2.6

4 EA $___NSP___ $___NSP___

B.0.6 GFP/GFM Report for Gas Generator and modules A-F IAW paragraph 3.2.7

B.0.7 Warranty Report for Gas Generator and modules A-F IAW paragraph 3.2.8

1 EA $___NSP___ $___NSP___

B.0.8 Data File preliminary and final version

IAW paragraph 3.4

B.0.9 Certificate of Conformance for Gas

Generator and modules A-F IAW paragraph 3.1.7

B.0.10 OEM Representative resume IAW paragraph 3.13.2

B.0.11 Quality Control Program IAW paragraph

4.3

B.0.12 Calibration System IAW paragraph 4.4 1 EA $___NSP___ $___NSP___

B.0.13

Government Property Reports

GAS GENERATOR PRICING

B.0.14 Initial Receipt of Gas Generator IAW paragraph 3.5

3 EA $_________ $_________

B.0.15 Disassembly for Dirty Inspection of Gas

Generator IAW paragraph 3.6

B.0.16 Disassembly for Clean Inspection of Gas

Generator IAW paragraph 3.7

B.0.17 Expendable/Consumable Parts Kit for Gas

Generator IAW paragraph 3.9.1

B.0.18 Reassembly of Gas Generator IAW paragraph 3.10

B.0.19 Overhaul of Gas Generator IAW paragraph

3.11

3 EA $___NSP___ $___NSP___

B.0.20 Reassembly of any Gas Generator deemed un-repairable IAW paragraph 3.11.1

1 EA $_________ $_________

B.0.21 Overhaul of LQ25 Liquid Fuel Valve IAW paragraph 3.11.2

B.0.22 Overhaul of Magnetic Pick-up Assembly IAW paragraph 3.11.3

B.0.23 Performance Testing of Gas Generator

IAW paragraph 3.12

B.0.24 Test Report for Gas Generator IAW paragraph 3.2.5

B.0.25 Photo Documentation of Gas Generator IAW paragraph 3.3

B.0.26 Gas Generator Logbook IAW paragraph

3.14.1

B.0.27 Warranty procedures IAW paragraph 3.16 1 EA $___NSP___ $___NSP___

B.0.28 Contractor’s Field Service Representative

IAW paragraph 3.17 Daily Flat

Rate

B.0.29 Preservation, Packing, Packaging, Marking, Bar Coding for Gas Generator IAW paragraph 5.0

MODULE A PRICING

B.0.30 Initial receipt of module A IAW paragraph

3.5

B.0.31 Disassembly for Dirty Inspection of module A IAW paragraph 3.6

B.0.32 Disassembly for Clean Inspection of module A IAW paragraph 3.7

B.0.33 Expendable/Consumable Parts Kit for module A IAW paragraph 3.9.1

B.0.34 Reassembly of module A IAW paragraph

3.10

B.0.35 Overhaul of module A IAW paragraph

B.0.36 Reassembly of any module A deemed un-repairable IAW paragraph 3.11.1

B.0.37 Photo Documentation of module A IAW paragraph 3.3

B.0.38 Certificate of balancing module A 1 EA $___NSP___ $___NSP___

B.0.39 Preservation, Packing, Packaging, Marking, Bar Coding of module A IAW paragraph 5.0

MODULE B PRICING

B.0.40 Initial receipt of module B IAW paragraph

B.0.41 Disassembly for Dirty Inspection of module B IAW paragraph 3.6

B.0.42 Disassembly for Clean Inspection of module B IAW paragraph 3.7

B.0.43 Expendable/Consumable Parts Kit for module B IAW paragraph 3.9.1

B.0.44 Reassembly of module B IAW paragraph

B.0.45 Overhaul of module B IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.0.46 Reassembly of any module B deemed un-

B.0.47 Photo Documentation of module B IAW

B.0.48 Certificate of balancing module B 1 EA $___NSP___ $___NSP___

B.0.49 Preservation, Packing, Packaging, Marking, Bar Coding of module B IAW

MODULE C PRICING

B.0.50 Initial receipt of module C IAW paragraph

B.0.51 Disassembly for Dirty Inspection of module C IAW paragraph 3.6

B.0.52 Disassembly for Clean Inspection of module C IAW paragraph 3.7

B.0.53 Expendable/Consumable Parts Kit for module C IAW paragraph 3.9.1

B.0.54 Reassembly of module C IAW paragraph

B.0.55 Overhaul of module C IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.0.56 Reassembly of any module C deemed un-

B.0.57 Photo Documentation of module C IAW

B.0.58 Certificate of balancing module C 1 EA $___NSP___ $___NSP___

B.0.59 Preservation, Packing, Packaging, Marking, Bar Coding of module C IAW

MODULE D PRICING

B.0.60 Initial receipt of module D IAW paragraph

B.0.61 Disassembly for Dirty Inspection of module D IAW paragraph 3.6

B.0.62 Disassembly for Clean Inspection of module D IAW paragraph 3.7

B.0.63 Expendable/Consumable Parts Kit for module D IAW paragraph 3.9.1

B.0.64 Reassembly of module D IAW paragraph

B.0.65 Overhaul of module D IAW paragraph

B.0.66 Reassembly of any module D deemed un-

B.0.67 Photo Documentation of module D IAW

B.0.68 Preservation, Packing, Packaging, Marking, Bar Coding of module D IAW

MODULE E PRICING

B.0.69 Initial receipt of module E IAW paragraph

B.0.70 Disassembly for Dirty Inspection of module E IAW paragraph 3.6

B.0.71 Disassembly for Clean Inspection of module E IAW paragraph 3.7

B.0.72 Expendable/Consumable Parts Kit for module E IAW paragraph 3.9.1

B.0.73 Reassembly of module E IAW paragraph

B.0.74 Overhaul of module E IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.0.75 Reassembly of any module E deemed un-

B.0.76 Photo Documentation of module E IAW

B.0.77 Preservation, Packing, Packaging, Marking, Bar Coding of module E IAW

MODULE F PRICING

B.0.78 Initial receipt of module F IAW paragraph

B.0.79 Disassembly for Dirty Inspection of module F IAW paragraph 3.6

B.0.80 Disassembly for Clean Inspection of module F IAW paragraph 3.7

B.0.81 Expendable/Consumable Parts Kit for module F IAW paragraph 3.9.1

B.0.82 Reassembly of module F IAW paragraph

B.0.83 Overhaul of module F IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.0.84 Reassembly of any module F deemed un-

B.0.85 Photo Documentation of module F IAW

B.0.86 Preservation, Packing, Packaging, Marking, Bar Coding of module F IAW

Base Year – Contingency Items

Part numbers listed are typical and alternate (equal) part number can be substituted.

CLIN Item Description Est.

Qty Unit of Issue

Unit Cost Total Cost Bid Factor

B.0.87 P&D Valve p/n 717868 1 EA $_________ $_________ 10%

B.0.88 P&D Valve p/n 708059 1 EA $_________ $_________ 10%

B.0.89 Igniter Plug p/n664093 2 EA $_________ $_________ 50%

B.0.90 Exciter p/n 1074010 1 EA $_________ $_________ 25%

B.0.91 Exciter Cable p/n 1074026 1 EA $_________ $_________ 25%

B.0.92 Exciter Adapter p/n 1074011 1 EA $_________ $_________ 25%

B.0.93 Exciter Input Cable p/n 618963 1 EA $_________ $_________ 20%

B.0.94 Exciter Lead Left p/n 368158 1 EA $_________ $_________ 25%

B.0.95 Exciter Lead Right p/n 368159 1 EA $_________ $_________ 25%

B.0.96 1st stage NGV’s p/n 670351 CL6 80 EA $_________ $_________ 50%

B.0.97 1st stage NGV’s p/n 676051 CL7 80 EA $_________ $_________ 50%

B.0.98 2nd stage NGV’s p/n 674152 CL5 76 EA $_________ $_________ 10%

B.0.99 2nd stage NGV’s p/n 1070652 CL4 76 EA $_________ $_________ 10%

B.0.100 3rd stage NGV’s p/n 703353 CL7 68 EA $_________ $_________ 10%

B.0.101 1st stage turbine blades p/n 1071901

108 EA $_________ $_________ 25%

B.0.102 2nd stage turbine blades p/n 698102 100 EA $_________ $_________ 25%

B.0.103 3rd stage turbine blades p/n 698103 82 EA $_________ $_________ 25%

B.0.104 Anti-ice valve 115 volt p/n 650420 1 EA $_________ $_________ 10%

B.0.105 Tt7 temperature probe p/n 1059134

2 EA $_________ $_________ 50%

B.0.106 Tt7 harness p/n 368993 1 EA $_________ $_________ 20%

B.0.107 Tt7 harness p/n 647008 1 EA $_________ $_________ 20%

B.0.108 #1 seal plate p/n 307254 3 EA $_________ $_________ 60%

B.0.109 #2 seal plate p/n 716435 3 EA $_________ $_________ 60%

B.0.110 #3 seal plate p/n 440967 3 EA $_________ $_________ 60%

B.0.111 #4 seal plate p/n 716435 3 EA $_________ $_________ 60%

B.0.112 #4 ½ seal plate p/n 420438 3 EA $_________ $_________ 60%

B.0.113 #5 seal plate p/n 440978 3 EA $_________ $_________ 60%

B.0.114 #6 seal plate p/n 313513 3 EA $_________ $_________ 60%

B.0.115 #1 Carbon seal assembly p/n 658687

1 EA $_________ $_________ 60%

B.0.116 #2 Carbon seal assembly p/n 1048245

B.0.117 #3 Carbon seal assembly p/n 1058370

B.0.118 #4 Carbon seal assembly p/n 1070692

B.0.119 #4 ½ Carbon seal assembly p/n 420438

B.0.120 #5 Carbon seal assembly p/n 1071590

B.0.121 #6 Carbon seal assembly p/n 420432

B.0.122 #1 main OD bearing p/n 1046211 1 EA $_________ $_________ 70%

B.0.123 #2 main bearing p/n 679028 1 EA $_________ $_________ 70%

B.0.124 #2 ½ main bearing p/n 718003 1 EA $_________ $_________ 70%

B.0.125 #3 main bearing p/n 1058674 1 EA $_________ $_________ 70%

B.0.126 #4 main bearing p/n 679032 1 EA $_________ $_________ 70%

B.0.127 #4 ½ main bearing p/n 424181 1 EA $_________ $_________ 70%

B.0.128 #5 main bearing p/n 725926 1 EA $_________ $_________ 70%

B.0.129 #6 main bearing p/n 1058418 1 EA $_________ $_________ 70%

B.0.130 Spacer 2 ½ bearing p/n 622230 1 EA $_________ $_________ 20%

B.0.131 Bearing p/n 634029 1 EA $_________ $_________ 50%

B.0.132 Housing 2 ½ bearing p/n 650753 1 EA $_________ $_________ 10%

B.0.133 Bearing p/n 768293 1 EA $_________ $_________ 50%

B.0.134 Bearing p/n 792903 1 EA $_________ $_________ 50%

Miscellaneous Contingency Repair Rates

B.0.135 During the performance of the contract additional repairs and/or gas generator or module modifications not specifically addressed in the schedule may be required by the contract under a loaded composite hourly labor rate arrangement during gas generator overhaul. As a result, offerors must provide a loaded composite hourly rate and profit, including G&A and overhead, for each labor category listed below and if appropriate, material handling rate/cost.

Labor hours proposed by the contractor to accomplish repairs and/or modifications shall be itemized in the initial gas generator or module condition report for the repair, and shall be subject to negotiation and separate delivery order modification. The rate provided herein will be applied to negotiated labor hours to arrive at a total price to accomplish such repair and/or modifications(s).

In addition, required parts will be paid for at cost, plus application of the material handling cost, if applicable. All miscellaneous contingency parts required for the repair of the gas generator or module (whether reconditioned or new) shall be reimbursed at actual costs. The Contractor shall provide full supporting data with submission of each condition report to substantiate claim for material. The Government reserves the right to provide any of the parts or components as Government Furnished Property. In the event the contractor or the government furnishes the parts, the material-handling rate shown below shall apply.

CLIN Labor Description Hourly Rate Estimated

Hours Total

B.0.135.A. Master Mechanic $_________ 100 $_________

B.0.135.B Journeyman Mechanic $_________ 100 $_________

CLIN Description Percent Estimated

Amount

B.0.135.C Material Handling Costs Markup in percent ($1,000.00 material estimate for evaluation purposes only)

________% $1,000.00 $_________

The material handling costs specified by the contractor shall include only costs clearly excluded from the labor-hour rate. Material handling costs may include all appropriate indirect costs allocated to direct materials in accordance with the contractor’s usual accounting procedures consistent with FAR Part 31.

The material handling charge shall include the costs associated with the contractor’s inspection of Government furnished property.

NOTE: The contractor shall not begin any repairs or component replacement until authorized, in writing, by the Contracting Officer or his authorized representative. The government will provide guidance to the contractor within 21 calendar days of receipt of the condition report. In the event that during the MSI, the gas generator or module is found to be not repairable, the Contractor shall notify the Contracting Officer within 5 hours of discovery for further instructions.

CONTINGENCY PARTS

All parts shall meet the requirements set forth in the specification and include all applicable service bulletins as listed in the specification. All items listed in the contingency items shall be “reconditioned” parts and must have the same useful life as new parts. Refer to paragraph 2.3.1

(b) of the specification, which determines the practices used to recondition all parts.

a) The prices quoted for contingency items (other than Service Bulletins) shall be only the price of the material.

b) The Government reserves the right to require the contractor to replace up to a complete set of blades for each stage at the unit price provided.

c) The Government reserves the right to provide any of the contingency items as Government

Furnished Property (GFP). In the event this occurs, the material handling rate shown under CLIN B.0.135 (C), shall apply.

In the event that the contractor is operating in an emergency mode, due to time frame constraints, the government shall be allowed a 10% (percent) core value on all exchanged items. This core value shall be deducted from the serviceable rebuilt government part price, as priced in the schedule.

Instructions for pricing the contingency parts:

a) All prices are for “reconditioned” parts.

b) The Contractor may price and supply an alternate part number as long as the form, fit and function are the same and the quality is equal to or greater than the listed part number.

SERVICE BULLETINS/SPECIAL SHOP INSTRUCTIONS

The following line items are for updating/changes as a result of the service bulletins/special shop instructions listed. In the event any of these service bulletins/special shop instructions are required in accordance with the specification requirements for the repair of a gas generator or module, the Contractor shall incorporate the specific line item(s) into the condition report.

All items listed in this section shall utilize Wood Group Pratt & Whitney (WGPW) OEM parts.

Items furnished other than WGPW parts will be rejected as unacceptable.

The price shall include all cost, e.g. part and labor associated with the complete implementation of required service bulletin(s).

CLIN Service Bulletin/Special Shop

Instruction Number Est.

Qty

Unit of Issue

B.0.136 200 1 EA $_________ $_________ 10%

B.0.137 222 1 EA $_________ $_________ 10%

B.0.138 230 Sup 2 1 EA $_________ $_________ 10%

B.0.139 259 1 EA $_________ $_________ 10%

B.0.140 275 1 EA $_________ $_________ 10%

B.0.141 293 1 EA $_________ $_________ 10%

B.0.142 313 1 EA $_________ $_________ 10%

B.0.143 336 1 EA $_________ $_________ 10%

B.0.144 346 Rev B 1 EA $_________ $_________ 10%

B.0.145 428 Sup 2 1 EA $_________ $_________ 10%

B.0.146 445 1 EA $_________ $_________ 10%

B.0.147 447 1 EA $_________ $_________ 10%

B.0.148 452 1 EA $_________ $_________ 10%

B.0.149 466 Rev B 1 EA $_________ $_________ 10%

B.0.150 475 Rev A Sup 1 1 EA $_________ $_________ 10%

B.0.151 486 1 EA $_________ $_________ 10%

B.0.152 498 Rev C 1 EA $_________ $_________ 10%

B.0.153 502 Rev B 1 EA $_________ $_________ 10%

B.0.154 552 1 EA $_________ $_________ 10%

B.0.155 555Rev A 1 EA $_________ $_________ 10%

B.0.156 557 1 EA $_________ $_________ 10%

B.0.157 583 RevA 1 EA $_________ $_________ 10%

B.0.158 585 Sup 2 1 EA $_________ $_________ 10%

B.0.159 588 Rev A 1 EA $_________ $_________ 10%

B.0.160 71B01 Sup 3 1 EA $_________ $_________ 10%

B.0.161 71B06 Rev A Sup 3 1 EA $_________ $_________ 10%

B.0.162 71B09 Rev A, Sup 1 1 EA $_________ $_________ 10%

B.0.163 71B23 Rev B 1 EA $_________ $_________ 10%

B.0.164 71B26 Sup 3 1 EA $_________ $_________ 10%

B.0.165 71B30 1 EA $_________ $_________ 10%

B.0.166 72B08 Rev B 1 EA $_________ $_________ 10%

B.0.167 72B11 Sup 2 1 EA $_________ $_________ 10%

B.0.168 72B16 Sup 4 1 EA $_________ $_________ 10%

B.0.169 72B17 Rev A Sup 1 1 EA $_________ $_________ 10%

B.0.170 72B19 Rev B 1 EA $_________ $_________ 10%

B.0.171 72B24 Rev A Sup 1 1 EA $_________ $_________ 10%

B.0.172 72B27 Sup 1 1 EA $_________ $_________ 10%

B.0.173 72B28 1 EA $_________ $_________ 10%

B.0.174 72B32 1 EA $_________ $_________ 10%

B.0.175 73B15 Rev B (-12 GGs only) 1 EA $_________ $_________ 10%

B.0.176 73B34 Rev A Sup 3 1 EA $_________ $_________ 10%

B.0.177 74B07 Rev A Sup 1 1 EA $_________ $_________ 10%

B.0.178 74B11 Rev A Sup 1 1 EA $_________ $_________ 10%

B.0.179 74B14 Rev B Sup 1 1 EA $_________ $_________ 10%

B.0.180 74B21 1 EA $_________ $_________ 10%

B.0.181 74B24 Rev A 1 EA $_________ $_________ 10%

B.0.182 74B26 Rev B Sup 2 1 EA $_________ $_________ 10%

B.0.183 74B33 Rev A 1 EA $_________ $_________ 10%

B.0.184 74B34 1 EA $_________ $_________ 10%

B.0.185 74B37 1 EA $_________ $_________ 10%

B.0.186 75B11 1 EA $_________ $_________ 10%

B.0.187 77M10B (-12 GG only) 2 EA $_________ $_________ 10%

B.0.188 78M06B (-12 GG only) 1 EA $_________ $_________ 10%

B.0.189 79B02 1 EA $_________ $_________ 10%

B.0.190 80B09 Sup 1 1 EA $_________ $_________ 10%

B.0.191 80B14 1 EA $_________ $_________ 10%

B.0.192 80B15 1 EA $_________ $_________ 10%

B.0.193 83B11 Rev A 1 EA $_________ $_________ 10%

B.0.194 84B02 1 EA $_________ $_________ 10%

B.0.195 84M04B 1 EA $___NSP___ $___NSP___ 10%

B.0.196 85B03 1 EA $_________ $_________ 10%

B.0.197 85B06 1 EA $_________ $_________ 10%

B.0.198 85B09 1 EA $_________ $_________ 10%

B.0.199 93B08 1 EA $_________ $_________ 50%

B.0.200 97B03 1 EA $_________ $_________ 60%

B.0.201 98B17 1 EA $_________ $_________ 10%

B.0.202 01B05 1 EA $_________ $_________ 10%

B.0.203 02B03 1 EA $_________ $_________ 30%

B.0.204 SSI 73L04 1 EA $_________ $_________ 25%

B.0.205 SSI 74L05 1 EA $_________ $_________ 25%

B.0.206 SSI2004 L08A 3 EA $_________ $_________ 60%

B.0.207 SSI 2005 L01 2 EA $_________ $_________ 50%

1st Option Year – Mandatory Items

Unit of

B.1.1 Initial Receiving Report IAW with

B.1.2 Disassembly Condition, Dirty Inspection

B.1.3 Disassembly Condition, Clean Inspection

B.1.4 Reassembly Report for Gas Generator and

B.1.5 OEM Summary Report for Gas Generator

B.1.6 GFP/GFM Report for Gas Generator and

B.1.7 Warranty Report for Gas Generator and

B.1.8 Data File preliminary and final version

B.1.9 Certificate of Conformance for Gas

B.1.10 OEM Representative resume IAW

B.1.11 Quality Control Program IAW paragraph

B.1.12 Calibration System IAW paragraph 4.4 1 EA $___NSP___ $___NSP___

B.1.13

B.1.14 Initial Receipt of Gas Generator IAW

B.1.15 Disassembly for Dirty Inspection of Gas

B.1.16 Disassembly for Clean Inspection of Gas

B.1.17 Expendable/Consumable Parts Kit for Gas

B.1.18 Reassembly of Gas Generator IAW

B.1.19 Overhaul of Gas Generator IAW paragraph

B.1.20 Reassembly of any Gas Generator deemed

B.1.21 Overhaul of LQ25 Liquid Fuel Valve IAW

B.1.22 Overhaul of Magnetic Pick-up Assembly

B.1.23 Performance Testing of Gas Generator

B.1.24 Test Report for Gas Generator IAW

B.1.25 Photo Documentation of Gas Generator

B.1.26 Gas Generator Logbook IAW paragraph

B.1.27 Warranty procedures IAW paragraph 3.16 1 EA $___NSP___ $___NSP___

B.1.28 Contractor’s Field Service Representative

IAW paragraph 3.17 Daily Flat

B.1.29 Preservation, Packing, Packaging, IAW paragraph 5.0

B.1.30 Initial receipt of module A IAW paragraph

B.1.31 Disassembly for Dirty Inspection of

B.1.32 Disassembly for Clean Inspection of

B.1.33 Expendable/Consumable Parts Kit for

B.1.34 Reassembly of module A IAW paragraph

B.1.35 Overhaul of module A IAW paragraph

B.1.36 Reassembly of any module A deemed un-

B.1.37 Photo Documentation of module A IAW

B.1.38 Certificate of balancing module A 1 EA $___NSP___ $___NSP___

B.1.39 Preservation, Packing, Packaging, B.1.40 Initial receipt of module B IAW paragraph

B.1.41 Disassembly for Dirty Inspection of

B.1.42 Disassembly for Clean Inspection of

B.1.43 Expendable/Consumable Parts Kit for 1 EA $_________ $_________

B.1.44 Reassembly of module B IAW paragraph

B.1.45 Overhaul of module B IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.1.46 Reassembly of any module B deemed un-

B.1.47 Photo Documentation of module B IAW

B.1.48 Certificate of balancing module B 1 EA $___NSP___ $___NSP___

B.1.49 Preservation, Packing, Packaging, B.1.50 Initial receipt of module C IAW paragraph

B.1.51 Disassembly for Dirty Inspection of

B.1.52 Disassembly for Clean Inspection of

B.1.53 Expendable/Consumable Parts Kit for

B.1.54 Reassembly of module C IAW paragraph

B.1.55 Overhaul of module C IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.1.56 Reassembly of any module C deemed un-

B.1.57 Photo Documentation of module C IAW

B.1.58 Certificate of balancing module C 1 EA $___NSP___ $___NSP___

B.1.59 Preservation, Packing, Packaging, B.1.60 Initial receipt of module D IAW paragraph

B.1.61 Disassembly for Dirty Inspection of

B.1.62 Disassembly for Clean Inspection of

B.1.63 Expendable/Consumable Parts Kit for

B.1.64 Reassembly of module D IAW paragraph

B.1.65 Overhaul of module D IAW paragraph

B.1.66 Reassembly of any module D deemed un-

B.1.67 Photo Documentation of module D IAW

B.1.68 Preservation, Packing, Packaging, B.1.69 Initial receipt of module E IAW paragraph

B.1.70 Disassembly for Dirty Inspection of

B.1.71 Disassembly for Clean Inspection of 1 EA $_________ $_________

B.1.72 Expendable/Consumable Parts Kit for

B.1.73 Reassembly of module E IAW paragraph

B.1.74 Overhaul of module E IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.1.75 Reassembly of any module E deemed un-

B.1.76 Photo Documentation of module E IAW

B.1.77 Preservation, Packing, Packaging, B.1.78 Initial receipt of module F IAW paragraph

B.1.79 Disassembly for Dirty Inspection of

B.1.80 Disassembly for Clean Inspection of

B.1.81 Expendable/Consumable Parts Kit for

B.1.82 Reassembly of module F IAW paragraph

B.1.83 Overhaul of module F IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.1.84 Reassembly of any module F deemed un-

B.1.85 Photo Documentation of module F IAW

B.1.86 Preservation, Packing, Packaging, 1 EA $_________ $_________

1st Option Year – Contingency Items

Part numbers listed are typical and alternate (equal) part number can be substituted.

CLIN Item Description Est.

Qty Unit of Issue

B.1.87 P&D Valve p/n 717868 1 EA $_________ $_________ 10%

B.1.88 P&D Valve p/n 708059 1 EA $_________ $_________ 10%

B.1.89 Igniter Plug p/n664093 2 EA $_________ $_________ 50%

B.1.90 Exciter p/n 1074010 1 EA $_________ $_________ 25%

B.1.91 Exciter Cable p/n 1074026 1 EA $_________ $_________ 25%

B.1.92 Exciter Adapter p/n 1074011 1 EA $_________ $_________ 25%

B.1.93 Exciter Input Cable p/n 618963 1 EA $_________ $_________ 20%

B.1.94 Exciter Lead Left p/n 368158 1 EA $_________ $_________ 25%

B.1.95 Exciter Lead Right p/n 368159 1 EA $_________ $_________ 25%

B.1.96 1st stage NGV’s p/n 670351 CL6 80 EA $_________ $_________ 50%

B.1.97 1st stage NGV’s p/n 676051 CL7 80 EA $_________ $_________ 50%

B.1.98 2nd stage NGV’s p/n 674152 CL5 76 EA $_________ $_________ 10%

B.1.99 2nd stage NGV’s p/n 1070652 CL4 76 EA $_________ $_________ 10%

B.1.100 3rd stage NGV’s p/n 703353 CL7 68 EA $_________ $_________ 10%

B.1.101 1st stage turbine blades p/n

B.1.102 2nd stage turbine blades p/n 698102 100 EA $_________ $_________ 25%

B.1.103 3rd stage turbine blades p/n 698103 82 EA $_________ $_________ 25%

B.1.104 Anti-ice valve 115 volt p/n 650420 1 EA $_________ $_________ 10%

B.1.105 Tt7 temperature probe p/n

B.1.106 Tt7 harness p/n 368993 1 EA $_________ $_________ 20%

B.1.107 Tt7 harness p/n 647008 1 EA $_________ $_________ 20%

B.1.108 #1 seal plate p/n 307254 3 EA $_________ $_________ 60%

B.1.109 #2 seal plate p/n 716435 3 EA $_________ $_________ 60%

B.1.110 #3 seal plate p/n 440967 3 EA $_________ $_________ 60%

B.1.111 #4 seal plate p/n 716435 3 EA $_________ $_________ 60%

B.1.112 #4 ½ seal plate p/n 420438 3 EA $_________ $_________ 60%

B.1.113 #5 seal plate p/n 440978 3 EA $_________ $_________ 60%

B.1.114 #6 seal plate p/n 313513 3 EA $_________ $_________ 60%

B.1.115 #1 Carbon seal assembly p/n

B.1.116 #2 Carbon seal assembly p/n

B.1.117 #3 Carbon seal assembly p/n

B.1.118 #4 Carbon seal assembly p/n

B.1.119 #4 ½ Carbon seal assembly p/n

B.1.120 #5 Carbon seal assembly p/n

B.1.121 #6 Carbon seal assembly p/n

B.1.122 #1 main OD bearing p/n 1046211 1 EA $_________ $_________ 70%

B.1.123 #2 main bearing p/n 679028 1 EA $_________ $_________ 70%

B.1.124 #2 ½ main bearing p/n 718003 1 EA $_________ $_________ 70%

B.1.125 #3 main bearing p/n 1058674 1 EA $_________ $_________ 70%

B.1.126 #4 main bearing p/n 679032 1 EA $_________ $_________ 70%

B.1.127 #4 ½ main bearing p/n 424181 1 EA $_________ $_________ 70%

B.1.128 #5 main bearing p/n 725926 1 EA $_________ $_________ 70%

B.1.129 #6 main bearing p/n 1058418 1 EA $_________ $_________ 70%

B.1.130 Spacer 2 ½ bearing p/n 622230 1 EA $_________ $_________ 20%

B.1.131 Bearing p/n 634029 1 EA $_________ $_________ 50%

B.1.132 Housing 2 ½ bearing p/n 650753 1 EA $_________ $_________ 10%

B.1.133 Bearing p/n 768293 1 EA $_________ $_________ 50%

B.1.134 Bearing p/n 792903 1 EA $_________ $_________ 50%

B.1.135 During the performance of the contract additional repairs and/or gas generator or module modifications not specifically addressed in the schedule may be required by the contract under a loaded composite hourly labor rate arrangement during gas generator overhaul. As a result, offerors must provide a loaded composite hourly rate and profit, including G&A and overhead, for each labor category listed below and if appropriate, material handling rate/cost.

Labor hours proposed by the contractor to accomplish repairs and/or modifications shall be itemized in the initial gas generator or module condition report for the repair, and shall be subject to negotiation and separate delivery order modification. The rate provided herein will be applied to negotiated labor hours to arrive at a total price to accomplish such repair and/or modifications(s).

In addition, required parts will be paid for at cost, plus application of the material handling cost, if applicable. All miscellaneous contingency parts required for the repair of the gas generator or module (whether reconditioned or new) shall be reimbursed at actual costs. The Contractor shall provide full supporting data with submission of each condition report to substantiate claim for material. The Government reserves the right to provide any of the parts or components as Government Furnished Property. In the event the contractor or the government furnishes the parts, the material-handling rate shown below shall apply.

CLIN Labor Description Hourly Rate Estimated

B.1.135.A. Master Mechanic $_________ 100 $_________

B.1.135.B Journeyman Mechanic $_________ 100 $_________

B.1.135.C Material Handling Costs Markup in allocated to direct materials in accordance with the contractor’s usual accounting procedures consistent with FAR Part 31.

The material handling charge shall include the costs associated with the contractor’s inspection of Government furnished property.

NOTE: The contractor shall not begin any repairs or component replacement until authorized, in writing, by the Contracting Officer or his authorized representative. The government will provide guidance to the contractor within 21 calendar days of receipt of the condition report. In the event that during the MSI, the gas generator or module is found to be not repairable, the Contractor shall notify the Contracting Officer within 5 hours of discovery for further instructions.

CONTINGENCY PARTS

All parts shall meet the requirements set forth in the specification and include all applicable service bulletins as listed in the specification. All items listed in the contingency items shall be “reconditioned” parts and must have the same useful life as new parts. Refer to paragraph 2.3.1

(b) of the specification, which determines the practices used to recondition all parts.

a) The prices quoted for contingency items (other than Service Bulletins) shall be only the price of the material.

b) The Government reserves the right to require the contractor to replace up to a complete set of blades for each stage at the unit price provided.

c) The Government reserves the right to provide any of the contingency items as Government

Furnished Property (GFP). In the event this occurs, the material handling rate shown under CLIN B.1.135 (C), shall apply.

In the event that the contractor is operating in an emergency mode, due to time frame constraints, the government shall be allowed a 10% (percent) core value on all exchanged items. This core value shall be deducted from the serviceable rebuilt government part price, as priced in the schedule.

Instructions for pricing the contingency parts:

a) All prices are for “reconditioned” parts.

instructions listed. In the event any of these service bulletins/special shop instructions are required in accordance with the specification requirements for the repair of a gas generator or module, the Contractor shall incorporate the specific line item(s) into the condition report.

All items listed in this section shall utilize Wood Group Pratt & Whitney (WGPW) OEM parts.

Items furnished other than WGPW parts will be rejected as unacceptable.

Est.

Qty

Unit of Issue

B.1.136 200 1 EA $_________ $_________ 10%

B.1.137 222 1 EA $_________ $_________ 10%

B.1.138 230 Sup 2 1 EA $_________ $_________ 10%

B.1.139 259 1 EA $_________ $_________ 10%

B.1.140 275 1 EA $_________ $_________ 10%

B.1.141 293 1 EA $_________ $_________ 10%

B.1.142 313 1 EA $_________ $_________ 10%

B.1.143 336 1 EA $_________ $_________ 10%

B.1.144 346 Rev B 1 EA $_________ $_________ 10%

B.1.145 428 Sup 2 1 EA $_________ $_________ 10%

B.1.146 445 1 EA $_________ $_________ 10%

B.1.147 447 1 EA $_________ $_________ 10%

B.1.148 452 1 EA $_________ $_________ 10%

B.1.149 466 Rev B 1 EA $_________ $_________ 10%

B.1.150 475 Rev A Sup 1 1 EA $_________ $_________ 10%

B.1.151 486 1 EA $_________ $_________ 10%

B.1.152 498 Rev C 1 EA $_________ $_________ 10%

B.1.153 502 Rev B 1 EA $_________ $_________ 10%

B.1.154 552 1 EA $_________ $_________ 10%

B.1.155 555Rev A 1 EA $_________ $_________ 10%

B.1.156 557 1 EA $_________ $_________ 10%

B.1.157 583 RevA 1 EA $_________ $_________ 10%

B.1.158 585 Sup 2 1 EA $_________ $_________ 10%

B.1.159 588 Rev A 1 EA $_________ $_________ 10%

B.1.160 71B01 Sup 3 1 EA $_________ $_________ 10%

B.1.161 71B06 Rev A Sup 3 1 EA $_________ $_________ 10%

B.1.162 71B09 Rev A, Sup 1 1 EA $_________ $_________ 10%

B.1.163 71B23 Rev B 1 EA $_________ $_________ 10%

B.1.164 71B26 Sup 3 1 EA $_________ $_________ 10%

B.1.165 71B30 1 EA $_________ $_________ 10%

B.1.166 72B08 Rev B 1 EA $_________ $_________ 10%

B.1.167 72B11 Sup 2 1 EA $_________ $_________ 10%

B.1.168 72B16 Sup 4 1 EA $_________ $_________ 10%

B.1.169 72B17 Rev A Sup 1 1 EA $_________ $_________ 10%

B.1.170 72B19 Rev B 1 EA $_________ $_________ 10%

B.1.171 72B24 Rev A Sup 1 1 EA $_________ $_________ 10%

B.1.172 72B27 Sup 1 1 EA $_________ $_________ 10%

B.1.173 72B28 1 EA $_________ $_________ 10%

B.1.174 72B32 1 EA $_________ $_________ 10%

B.1.175 73B15 Rev B (-12 GGs only) 1 EA $_________ $_________ 10%

B.1.176 73B34 Rev A Sup 3 1 EA $_________ $_________ 10%

B.1.177 74B07 Rev A Sup 1 1 EA $_________ $_________ 10%

B.1.178 74B11 Rev A Sup 1 1 EA $_________ $_________ 10%

B.1.179 74B14 Rev B Sup 1 1 EA $_________ $_________ 10%

B.1.180 74B21 1 EA $_________ $_________ 10%

B.1.181 74B24 Rev A 1 EA $_________ $_________ 10%

B.1.182 74B26 Rev B Sup 2 1 EA $_________ $_________ 10%

B.1.183 74B33 Rev A 1 EA $_________ $_________ 10%

B.1.184 74B34 1 EA $_________ $_________ 10%

B.1.185 74B37 1 EA $_________ $_________ 10%

B.1.186 75B11 1 EA $_________ $_________ 10%

B.1.187 77M10B (-12 GG only) 2 EA $_________ $_________ 10%

B.1.188 78M06B (-12 GG only) 1 EA $_________ $_________ 10%

B.1.189 79B02 1 EA $_________ $_________ 10%

B.1.190 80B09 Sup 1 1 EA $_________ $_________ 10%

B.1.191 80B14 1 EA $_________ $_________ 10%

B.1.192 80B15 1 EA $_________ $_________ 10%

B.1.193 83B11 Rev A 1 EA $_________ $_________ 10%

B.1.194 84B02 1 EA $_________ $_________ 10%

B.1.195 84M04B 1 EA $___NSP___ $___NSP___ 10%

B.1.196 85B03 1 EA $_________ $_________ 10%

B.1.197 85B06 1 EA $_________ $_________ 10%

B.1.198 85B09 1 EA $_________ $_________ 10%

B.1.199 93B08 1 EA $_________ $_________ 50%

B.1.200 97B03 1 EA $_________ $_________ 60%

B.1.201 98B17 1 EA $_________ $_________ 10%

B.1.202 01B05 1 EA $_________ $_________ 10%

B.1.203 02B03 1 EA $_________ $_________ 30%

B.1.204 SSI 73L04 1 EA $_________ $_________ 25%

B.1.205 SSI 74L05 1 EA $_________ $_________ 25%

B.1.206 SSI2004 L08A 3 EA $_________ $_________ 60%

B.1.207 SSI 2005 L01 2 EA $_________ $_________ 50%

2nd Option Year – Mandatory Items

Unit of

B.2.1 Initial Receiving Report IAW with

B.2.2 Disassembly Condition, Dirty Inspection

B.2.3 Disassembly Condition, Clean Inspection

B.2.4 Reassembly Report for Gas Generator and

B.2.5 OEM Summary Report for Gas Generator

B.2.6 GFP/GFM Report for Gas Generator and

B.2.7 Warranty Report for Gas Generator and

B.2.8 Data File preliminary and final version

B.2.9 Certificate of Conformance for Gas

B.2.10 OEM Representative resume IAW

B.2.11 Quality Control Program IAW paragraph

B.2.12 Calibration System IAW paragraph 4.4 1 EA $___NSP___ $___NSP___

B.2.13

B.2.14 Initial Receipt of Gas Generator IAW

B.2.15 Disassembly for Dirty Inspection of Gas

B.2.16 Disassembly for Clean Inspection of Gas

B.2.17 Expendable/Consumable Parts Kit for Gas

B.2.18 Reassembly of Gas Generator IAW

B.2.19 Overhaul of Gas Generator IAW paragraph

B.2.20 Reassembly of any Gas Generator deemed

B.2.21 Overhaul of LQ25 Liquid Fuel Valve IAW

B.2.22 Overhaul of Magnetic Pick-up Assembly

B.2.23 Performance Testing of Gas Generator

B.2.24 Test Report for Gas Generator IAW

B.2.25 Photo Documentation of Gas Generator

B.2.26 Gas Generator Logbook IAW paragraph

B.2.27 Warranty procedures IAW paragraph 3.16 1 EA $___NSP___ $___NSP___

B.2.28 Contractor’s Field Service Representative

IAW paragraph 3.17 Daily Flat

B.2.29 Preservation, Packing, Packaging, IAW paragraph 5.0

B.2.30 Initial receipt of module A IAW paragraph

B.2.31 Disassembly for Dirty Inspection of

B.2.32 Disassembly for Clean Inspection of

B.2.33 Expendable/Consumable Parts Kit for

B.2.34 Reassembly of module A IAW paragraph

B.2.35 Overhaul of module A IAW paragraph

B.2.36 Reassembly of any module A deemed un-

B.2.37 Photo Documentation of module A IAW

B.2.38 Certificate of balancing module A 1 EA $___NSP___ $___NSP___

B.2.39 Preservation, Packing, Packaging, B.2.40 Initial receipt of module B IAW paragraph

B.2.41 Disassembly for Dirty Inspection of

B.2.42 Disassembly for Clean Inspection of

B.2.43 Expendable/Consumable Parts Kit for

B.2.44 Reassembly of module B IAW paragraph

B.2.45 Overhaul of module B IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.2.46 Reassembly of any module B deemed un-

B.2.47 Photo Documentation of module B IAW

B.2.48 Certificate of balancing module B 1 EA $___NSP___ $___NSP___

B.2.49 Preservation, Packing, Packaging, B.2.50 Initial receipt of module C IAW paragraph

B.2.51 Disassembly for Dirty Inspection of

B.2.52 Disassembly for Clean Inspection of

B.2.53 Expendable/Consumable Parts Kit for

B.2.54 Reassembly of module C IAW paragraph

B.2.55 Overhaul of module C IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.2.56 Reassembly of any module C deemed un-

B.2.57 Photo Documentation of module C IAW

B.2.58 Certificate of balancing module C 1 EA $___NSP___ $___NSP___

B.2.59 Preservation, Packing, Packaging, B.2.60 Initial receipt of module D IAW paragraph

B.2.61 Disassembly for Dirty Inspection of

B.2.62 Disassembly for Clean Inspection of

B.2.63 Expendable/Consumable Parts Kit for

B.2.64 Reassembly of module D IAW paragraph 1 EA $_________ $_________

B.2.65 Overhaul of module D IAW paragraph

B.2.66 Reassembly of any module D deemed un-

B.2.67 Photo Documentation of module D IAW

B.2.68 Preservation, Packing, Packaging, B.2.69 Initial receipt of module E IAW paragraph

B.2.70 Disassembly for Dirty Inspection of

B.2.71 Disassembly for Clean Inspection of

B.2.72 Expendable/Consumable Parts Kit for

B.2.73 Reassembly of module E IAW paragraph

B.2.74 Overhaul of module E IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.2.75 Reassembly of any module E deemed un-

B.2.76 Photo Documentation of module E IAW

B.2.77 Preservation, Packing, Packaging, B.2.78 Initial receipt of module F IAW paragraph

B.2.79 Disassembly for Dirty Inspection of

B.2.80 Disassembly for Clean Inspection of

B.2.81 Expendable/Consumable Parts Kit for

B.2.82 Reassembly of module F IAW paragraph

B.2.83 Overhaul of module F IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.2.84 Reassembly of any module F deemed un-

B.2.85 Photo Documentation of module F IAW

B.2.86 Preservation, Packing, Packaging, 2nd Option Year – Contingency Items

Part numbers listed are typical and alternate (equal) part number can be substituted.

CLIN Item Description Est.

Qty Unit of Issue

B.2.87 P&D Valve p/n 717868 1 EA $_________ $_________ 10%

B.2.88 P&D Valve p/n 708059 1 EA $_________ $_________ 10%

B.2.89 Igniter Plug p/n664093 2 EA $_________ $_________ 50%

B.2.90 Exciter p/n 1074010 1 EA $_________ $_________ 25%

B.2.91 Exciter Cable p/n 1074026 1 EA $_________ $_________ 25%

B.2.92 Exciter Adapter p/n 1074011 1 EA $_________ $_________ 25%

B.2.93 Exciter Input Cable p/n 618963 1 EA $_________ $_________ 20%

B.2.94 Exciter Lead Left p/n 368158 1 EA $_________ $_________ 25%

B.2.95 Exciter Lead Right p/n 368159 1 EA $_________ $_________ 25%

B.2.96 1st stage NGV’s p/n 670351 CL6 80 EA $_________ $_________ 50%

B.2.97 1st stage NGV’s p/n 676051 CL7 80 EA $_________ $_________ 50%

B.2.98 2nd stage NGV’s p/n 674152 CL5 76 EA $_________ $_________ 10%

B.2.99 2nd stage NGV’s p/n 1070652 CL4 76 EA $_________ $_________ 10%

B.2.100 3rd stage NGV’s p/n 703353 CL7 68 EA $_________ $_________ 10%

B.2.101 1st stage turbine blades p/n

B.2.102 2nd stage turbine blades p/n 698102 100 EA $_________ $_________ 25%

B.2.103 3rd stage turbine blades p/n 698103 82 EA $_________ $_________ 25%

B.2.104 Anti-ice valve 115 volt p/n 650420 1 EA $_________ $_________ 10%

B.2.105 Tt7 temperature probe p/n

B.2.106 Tt7 harness p/n 368993 1 EA $_________ $_________ 20%

B.2.107 Tt7 harness p/n 647008 1 EA $_________ $_________ 20%

B.2.108 #1 seal plate p/n 307254 3 EA $_________ $_________ 60%

B.2.109 #2 seal plate p/n 716435 3 EA $_________ $_________ 60%

B.2.110 #3 seal plate p/n 440967 3 EA $_________ $_________ 60%

B.2.111 #4 seal plate p/n 716435 3 EA $_________ $_________ 60%

B.2.112 #4 ½ seal plate p/n 420438 3 EA $_________ $_________ 60%

B.2.113 #5 seal plate p/n 440978 3 EA $_________ $_________ 60%

B.2.114 #6 seal plate p/n 313513 3 EA $_________ $_________ 60%

B.2.115 #1 Carbon seal assembly p/n

B.2.116 #2 Carbon seal assembly p/n

B.2.117 #3 Carbon seal assembly p/n

B.2.118 #4 Carbon seal assembly p/n

B.2.119 #4 ½ Carbon seal assembly p/n

B.2.120 #5 Carbon seal assembly p/n

B.2.121 #6 Carbon seal assembly p/n

B.2.122 #1 main OD bearing p/n 1046211 1 EA $_________ $_________ 70%

B.2.123 #2 main bearing p/n 679028 1 EA $_________ $_________ 70%

B.2.124 #2 ½ main bearing p/n 718003 1 EA $_________ $_________ 70%

B.2.125 #3 main bearing p/n 1058674 1 EA $_________ $_________ 70%

B.2.126 #4 main bearing p/n 679032 1 EA $_________ $_________ 70%

B.2.127 #4 ½ main bearing p/n 424181 1 EA $_________ $_________ 70%

B.2.128 #5 main bearing p/n 725926 1 EA $_________ $_________ 70%

B.2.129 #6 main bearing p/n 1058418 1 EA $_________ $_________ 70%

B.2.130 Spacer 2 ½ bearing p/n 622230 1 EA $_________ $_________ 20%

B.2.131 Bearing p/n 634029 1 EA $_________ $_________ 50%

B.2.132 Housing 2 ½ bearing p/n 650753 1 EA $_________ $_________ 10%

B.2.133 Bearing p/n 768293 1 EA $_________ $_________ 50%

B.2.134 Bearing p/n 792903 1 EA $_________ $_________ 50%

B.2.135 During the performance of the contract additional repairs and/or gas generator or module modifications not specifically addressed in the schedule may be required by the contract under a loaded composite hourly labor rate arrangement during gas generator overhaul. As a result, offerors must provide a loaded composite hourly rate and profit, including G&A and overhead, for each labor category listed below and if appropriate, material handling rate/cost.

Labor hours proposed by the contractor to accomplish repairs and/or modifications shall be itemized in the initial gas generator or module condition report for the repair, and shall be subject to negotiation and separate delivery order modification. The rate provided herein will be applied to negotiated labor hours to arrive at a total price to accomplish such repair and/or modifications(s).

In addition, required parts will be paid for at cost, plus application of the material handling cost, if applicable. All miscellaneous contingency parts required for the repair of the gas generator or module (whether reconditioned or new) shall be reimbursed at actual costs. The Contractor shall provide full supporting data with submission of each condition report to substantiate claim for material. The Government reserves the right to provide any of the parts or components as

B.2.135.A. Master Mechanic $_________ 100 $_________

B.2.135.B Journeyman Mechanic $_________ 100 $_________

B.2.135.C Material Handling Costs Markup in allocated to direct materials in accordance with the contractor’s usual accounting procedures consistent with FAR Part 31.

The material handling charge shall include the costs associated with the contractor’s inspection of Government furnished property.

NOTE: The contractor shall not begin any repairs or component replacement until authorized, in writing, by the Contracting Officer or his authorized representative. The government will provide guidance to the contractor within 21 calendar days of receipt of the condition report. In the event that during the MSI, the gas generator or module is service bulletins as listed in the specification. All items listed in the contingency items shall be “reconditioned” parts and must have the same useful life as new parts. Refer to paragraph 2.3.1

(b) of the specification, which determines the practices used to recondition all parts.

a) The prices quoted for contingency items (other than Service Bulletins) shall be only the price of the material.

b) The Government reserves the right to require the contractor to replace up to a complete set of blades for each stage at the unit price provided.

c) The Government reserves the right to provide any of the contingency items as Government

CLIN B.2.135 (C), shall apply.

instructions listed. In the event any of these service bulletins/special shop instructions are required in accordance with the specification requirements for the repair of a gas generator or module, the Contractor shall incorporate the specific line item(s) into the condition report.

All items listed in this section shall utilize Wood Group Pratt & Whitney (WGPW) OEM parts.

Items furnished other than WGPW parts will be rejected as unacceptable.

Est.

Qty

Unit of Issue

B.2.136 200 1 EA $_________ $_________ 10%

B.2.137 222 1 EA $_________ $_________ 10%

B.2.138 230 Sup 2 1 EA $_________ $_________ 10%

B.2.139 259 1 EA $_________ $_________ 10%

B.2.140 275 1 EA $_________ $_________ 10%

B.2.141 293 1 EA $_________ $_________ 10%

B.2.142 313 1 EA $_________ $_________ 10%

B.2.143 336 1 EA $_________ $_________ 10%

B.2.144 346 Rev B 1 EA $_________ $_________ 10%

B.2.145 428 Sup 2 1 EA $_________ $_________ 10%

B.2.146 445 1 EA $_________ $_________ 10%

B.2.147 447 1 EA $_________ $_________ 10%

B.2.148 452 1 EA $_________ $_________ 10%

B.2.149 466 Rev B 1 EA $_________ $_________ 10%

B.2.150 475 Rev A Sup 1 1 EA $_________ $_________ 10%

B.2.151 486 1 EA $_________ $_________ 10%

B.2.152 498 Rev C 1 EA $_________ $_________ 10%

B.2.153 502 Rev B 1 EA $_________ $_________ 10%

B.2.154 552 1 EA $_________ $_________ 10%

B.2.155 555Rev A 1 EA $_________ $_________ 10%

B.2.156 557 1 EA $_________ $_________ 10%

B.2.157 583 RevA 1 EA $_________ $_________ 10%

B.2.158 585 Sup 2 1 EA $_________ $_________ 10%

B.2.159 588 Rev A 1 EA $_________ $_________ 10%

B.2.160 71B01 Sup 3 1 EA $_________ $_________ 10%

B.2.161 71B06 Rev A Sup 3 1 EA $_________ $_________ 10%

B.2.162 71B09 Rev A, Sup 1 1 EA $_________ $_________ 10%

B.2.163 71B23 Rev B 1 EA $_________ $_________ 10%

B.2.164 71B26 Sup 3 1 EA $_________ $_________ 10%

B.2.165 71B30 1 EA $_________ $_________ 10%

B.2.166 72B08 Rev B 1 EA $_________ $_________ 10%

B.2.167 72B11 Sup 2 1 EA $_________ $_________ 10%

B.2.168 72B16 Sup 4 1 EA $_________ $_________ 10%

B.2.169 72B17 Rev A Sup 1 1 EA $_________ $_________ 10%

B.2.170 72B19 Rev B 1 EA $_________ $_________ 10%

B.2.171 72B24 Rev A Sup 1 1 EA $_________ $_________ 10%

B.2.172 72B27 Sup 1 1 EA $_________ $_________ 10%

B.2.173 72B28 1 EA $_________ $_________ 10%

B.2.174 72B32 1 EA $_________ $_________ 10%

B.2.175 73B15 Rev B (-12 GGs only) 1 EA $_________ $_________ 10%

B.2.176 73B34 Rev A Sup 3 1 EA $_________ $_________ 10%

B.2.177 74B07 Rev A Sup 1 1 EA $_________ $_________ 10%

B.2.178 74B11 Rev A Sup 1 1 EA $_________ $_________ 10%

B.2.179 74B14 Rev B Sup 1 1 EA $_________ $_________ 10%

B.2.180 74B21 1 EA $_________ $_________ 10%

B.2.181 74B24 Rev A 1 EA $_________ $_________ 10%

B.2.182 74B26 Rev B Sup 2 1 EA $_________ $_________ 10%

B.2.183 74B33 Rev A 1 EA $_________ $_________ 10%

B.2.184 74B34 1 EA $_________ $_________ 10%

B.2.185 74B37 1 EA $_________ $_________ 10%

B.2.186 75B11 1 EA $_________ $_________ 10%

B.2.187 77M10B (-12 GG only) 2 EA $_________ $_________ 10%

B.2.188 78M06B (-12 GG only) 1 EA $_________ $_________ 10%

B.2.189 79B02 1 EA $_________ $_________ 10%

B.2.190 80B09 Sup 1 1 EA $_________ $_________ 10%

B.2.191 80B14 1 EA $_________ $_________ 10%

B.2.192 80B15 1 EA $_________ $_________ 10%

B.2.193 83B11 Rev A 1 EA $_________ $_________ 10%

B.2.194 84B02 1 EA $_________ $_________ 10%

B.2.195 84M04B 1 EA $___NSP___ $___NSP___ 10%

B.2.196 85B03 1 EA $_________ $_________ 10%

B.2.197 85B06 1 EA $_________ $_________ 10%

B.2.198 85B09 1 EA $_________ $_________ 10%

B.2.199 93B08 1 EA $_________ $_________ 50%

B.2.200 97B03 1 EA $_________ $_________ 60%

B.2.201 98B17 1 EA $_________ $_________ 10%

B.2.202 01B05 1 EA $_________ $_________ 10%

B.2.203 02B03 1 EA $_________ $_________ 30%

B.2.204 SSI 73L04 1 EA $_________ $_________ 25%

B.2.205 SSI 74L05 1 EA $_________ $_________ 25%

B.2.206 SSI2004 L08A 3 EA $_________ $_________ 60%

B.2.207 SSI 2005 L01 2 EA $_________ $_________ 50%

3rd Option Year – Mandatory Items

Unit of

B.3.1 Initial Receiving Report IAW with

B.3.2 Disassembly Condition, Dirty Inspection

B.3.3 Disassembly Condition, Clean Inspection

B.3.4 Reassembly Report for Gas Generator and

B.3.5 OEM Summary Report for Gas Generator

B.3.6 GFP/GFM Report for Gas Generator and

B.3.7 Warranty Report for Gas Generator and

B.3.8 Data File preliminary and final version

B.3.9 Certificate of Conformance for Gas

B.3.10 OEM Representative resume IAW

B.3.11 Quality Control Program IAW paragraph

B.3.12 Calibration System IAW paragraph 4.4 1 EA $___NSP___ $___NSP___

B.3.13

B.3.14 Initial Receipt of Gas Generator IAW

B.3.15 Disassembly for Dirty Inspection of Gas

B.3.16 Disassembly for Clean Inspection of Gas

B.3.17 Expendable/Consumable Parts Kit for Gas

B.3.18 Reassembly of Gas Generator IAW

B.3.19 Overhaul of Gas Generator IAW paragraph

B.3.20 Reassembly of any Gas Generator deemed

B.3.21 Overhaul of LQ25 Liquid Fuel Valve IAW

B.3.22 Overhaul of Magnetic Pick-up Assembly

B.3.23 Performance Testing of Gas Generator

B.3.24 Test Report for Gas Generator IAW

B.3.25 Photo Documentation of Gas Generator

B.3.26 Gas Generator Logbook IAW paragraph

B.3.27 Warranty procedures IAW paragraph 3.16 1 EA $___NSP___ $___NSP___

B.3.28 Contractor’s Field Service Representative

IAW paragraph 3.17 Daily Flat

B.3.29 Preservation, Packing, Packaging, IAW paragraph 5.0

B.3.30 Initial receipt of module A IAW paragraph

B.3.31 Disassembly for Dirty Inspection of

B.3.32 Disassembly for Clean Inspection of

B.3.33 Expendable/Consumable Parts Kit for

B.3.34 Reassembly of module A IAW paragraph

B.3.35 Overhaul of module A IAW paragraph

B.3.36 Reassembly of any module A deemed un-

B.3.37 Photo Documentation of module A IAW

B.3.38 Certificate of balancing module A 1 EA $___NSP___ $___NSP___

B.3.39 Preservation, Packing, Packaging, B.3.40 Initial receipt of module B IAW paragraph

B.3.41 Disassembly for Dirty Inspection of

B.3.42 Disassembly for Clean Inspection of

B.3.43 Expendable/Consumable Parts Kit for

B.3.44 Reassembly of module B IAW paragraph

B.3.45 Overhaul of module B IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.3.46 Reassembly of any module B deemed un-

B.3.47 Photo Documentation of module B IAW

B.3.48 Certificate of balancing module B 1 EA $___NSP___ $___NSP___

B.3.49 Preservation, Packing, Packaging, B.3.50 Initial receipt of module C IAW paragraph

B.3.51 Disassembly for Dirty Inspection of

B.3.52 Disassembly for Clean Inspection of

B.3.53 Expendable/Consumable Parts Kit for

B.3.54 Reassembly of module C IAW paragraph

B.3.55 Overhaul of module C IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.3.56 Reassembly of any module C deemed un-

B.3.57 Photo Documentation of module C IAW

B.3.58 Certificate of balancing module C 1 EA $___NSP___ $___NSP___

B.3.59 Preservation, Packing, Packaging, B.3.60 Initial receipt of module D IAW paragraph

B.3.61 Disassembly for Dirty Inspection of

B.3.62 Disassembly for Clean Inspection of

B.3.63 Expendable/Consumable Parts Kit for

B.3.64 Reassembly of module D IAW paragraph

B.3.65 Overhaul of module D IAW paragraph

B.3.66 Reassembly of any module D deemed un-

B.3.67 Photo Documentation of module D IAW

B.3.68 Preservation, Packing, Packaging, B.3.69 Initial receipt of module E IAW paragraph

B.3.70 Disassembly for Dirty Inspection of

B.3.71 Disassembly for Clean Inspection of

B.3.72 Expendable/Consumable Parts Kit for

B.3.73 Reassembly of module E IAW paragraph

B.3.74 Overhaul of module E IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.3.75 Reassembly of any module E deemed un-

B.3.76 Photo Documentation of module E IAW

B.3.77 Preservation, Packing, Packaging, B.3.78 Initial receipt of module F IAW paragraph

B.3.79 Disassembly for Dirty Inspection of

B.3.80 Disassembly for Clean Inspection of

B.3.81 Expendable/Consumable Parts Kit for

B.3.82 Reassembly of module F IAW paragraph

B.3.83 Overhaul of module F IAW paragraph 3.11 1 EA $___NSP___ $___NSP___

B.3.84 Reassembly of any module F deemed un-

B.3.85 Photo Documentation of module F IAW

B.3.86 Preservation, Packing, Packaging, 3rd Option Year – Contingency Items