FW HSCG40-08-Q-50143 Clarifications.txt

TXT text file 6 KB Posted

Attached to
Steering System for 65' CGC
Solicitation number
HSCG40-08-Q-50143
Issued by

About this file

QUESTIONS AND ANSWERS

Text of this file

From: Dize, Andrew Sent: Monday, September 29, 2008 9:51 AM To: Johnson, Yvette Civilian Subject: FW: HSCG40-08-Q-50143 Clarifications

Yvette, Here are my answers to the questions

See Walt Wujek's answers with my clarifications as follows:

B.0.1 - See Walt's comment - Concur B.0.9 - Concur. Please correct part number as identified by responder.

B.0.11 - Concur. The number of those items mentioned by the responder should be doubled. Requirement stands as written. No clarification required.

B.0.13 & 15 - See Walt's comment below - Concur.

Addendum to Block 15

4. Inspection - NO CHANGE to SOLICITATION

Yes. Keep requirement as stated.

6. FAR Delivery Schedule - NO CHANGE TO SOLICITATION

The dates are provided in the solicitation. Contractor also has the preference to put in their own delivery dates. Actual dates cannot be determined at this time because the issuance of an order to buy the equipment is based on available funding.

NO CHANGE to statement for items supplied for the steering system to be either ABS or USCG approved.

Steering components have been verified. Numbers requested are based on requirements. NO NEED TO RESPOND TO THIS QUESTION.

-----Original Message----- From: Wujek, Walter Sent: Thursday, September 25, 2008 8:47 AM To: Dize, Andrew Cc: Skwarek, Vincent LCDR; Monroe, Timothy ENG4; Weller, Paul; Wolford, Gary Subject: RE: HSCG40-08-Q-50143 Clarifications

Andy, My limited input is as follows:

B.0.1 - I'm OK with Chrome Plated as previously supplied - but I don't know how you can finesse this requirement in the spec.

B.0.9 - If JASTRAM says the part number is wrong, I believe them.

B.0.11 - Paul Weller is looking at this and will call with his input.

B.0.13 & 15 - Same as B.0.9

All the rest is boilerplate BS that I will leave to the COTR to decipher.

Walt

-----Original Message----- From: Dize, Andrew Sent: Thursday, September 25, 2008 6:55 AM To: Skwarek, Vincent LCDR; Monroe, Timothy ENG4 Cc: Wujek, Walter Subject: FW: HSCG40-08-Q-50143 Clarifications Importance: High

I have received clarification questions on the 65 WLR solicitation. I am forwarding for your info/input if you so choose.

Andy

-----Original Message----- From: Johnson, Yvette Civilian Sent: Thursday, September 25, 2008 6:39 AM To: Dize, Andrew Subject: FW: HSCG40-08-Q-50143 Clarifications Importance: High

Good morning, It would be greatly appreciated if you can clear up technical questions for RG Group. Upon my return I will post question and answers on FBO.GOV.

Thank you in advance for your assistance.

Yvette R. Johnson USCG ELC Auxiliary Systems Acquisition Branch (410)762-6474 ph (410)762-6056 fx

-----Original Message----- From: Randy.McKee@rg-group.com [mailto:Randy.McKee@rg-group.com] Sent: Wednesday, September 24, 2008 4:40 PM To: Johnson, Yvette Civilian Cc: 'Kevin Delaney' Subject: HSCG40-08-Q-50143 Clarifications

Yvette, Per our conversation, we have several clarifications and questions pertaining the steering system:

Contract item B.0.1 – cylinders. Specification requires piston rod to be 17-4ph. This is a grade of stainless.

*The standard Jastram piston rod used in the cylinders supplied previously (part no Ja-201000-1) are Chrome plated ASTM A311 or A108. Please have the requirement clarified.

Contract item B.0.9 – Steering control system. The single full follow-up part no JA-701008-2 is incorrect it should be JA-701008-1.

*Both the non follow-up and full follow-up take over switches have an extra 9 in the part number.

Contract item B.0.11 – MSA System. The quantities for the motor starter (part number JQ-041096-51), alarm panel (JA-701037-11) and starter panel (JA-701039-11) need to be doubled.

*The system is not in accordance to CFR 113.43. Nether were the previously supplied systems. I am not sure if this is a USCG preferred specification for this class of vessel, but if this were a commercial vessel this requirements is only needed on vessels 1600 gross tons and over. Please confirm this requirement.

Contract item B.0.13 – and B-0.015. The tiller description is incorrect and should be listed as S-300-11-35-2.

Addendum to block 15:

4. inspection – the requirement for all internal inspection reports to submitted.

*This has not been done in the past. Do we need to do it for this contract?

6. FAR – delivery schedule. Please confirm the delivery schedule for all ship sets.

Contract requires that “ALL COMPONENTS THAT ARE OFFERED AND SUPPLIED FOR THE STEERING SYSTEM SHALL EITHER BE ABS APPROVED OR USCG APPROVED”.

*This is a pretty broad requirement. All the components quoted have been used in many systems approved by ABS and the USCG but not all carry component type approval. Including the most recent USCG shipments. This came up in the first negotiations and if memory serves we heard from a contact at the USCG “we will approve the equipment used for our own steering”. Please let me know if we need to be concerned about this or if we can carry on as we have with previous shipments.

Please have the steering gear confirmed.

Is it is the same or a little less than the previous project, HSCG40-05-D-50061?

USCG may want to confirm that their selection of components and operating parameters is adequate for the steering in these vessels.

Thank you for your assistance in clarifying these questions for us.

Randy McKee

RG Group Marine Systems

E-mail: randy.mckee@rg-group.com

Phone: 877-271-3246

Fax: 717-849-0682

Other files

File Type Posted
Solicitation 65WLR.doc DOC document
SF1449.doc DOC document
Sysnopsis.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .