Attachment 4 -- 10-26-2011.doc

DOC document 828 KB Posted

Attached to
Detention/Transportation Services
Solicitation number
HSCEDM-12-R-00001
Issued by

About this file

Draft Attachment 4

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J - Attachment 4 Immigration and Customs Enforcement

Enforcement and Removal Operations

New York Field Office

Detention/Transportation Quality Assurance Surveillance Plan

Table of Contents

1.

INTRODUCTION

2.

DEFINITIONS

3.

QUALITY CONTROL PLAN

4.

METHODS OF SURVEILLANCE

5.

FUNCTIONAL PERFORMANCE AREAS AND STANDARDS

6.

FAILURE TO MEET PERFORMANCE STANDARDS

7.

NOTIFICATIONS

8.

DETAINEE/MEMBER OF PUBLIC COMPLAINTS

9.

ATTACHMENTS

Attachment A- Performance Requirements Summary

A-1 Attachment B - Contract Discrepancy Report

B-1 Attachment C – Performance Monitoring Tool

C-1

QUALITY ASSURANCE SURVEILLANCE PLAN

NEW YORK FIELD OFFICE

DETENTION/TRANSPORTATION

IMMIGRATION AND CUSTOMS ENFORCEMENT (ICE)

ENFORCEMENT AND REMOVAL OPERATIONS (ERO)

1. INTRODUCTION

The Government’s Quality Assurance Surveillance Plan (QASP) is based on the premise that the Contractor and not the Government, is responsible for the day-to-day transportation of detainees, and all the management and quality control actions required to meet the terms of the contract. The role of the Government in quality assurance is to ensure performance standards are achieved and maintained. The Contractor is required to develop a comprehensive program of inspections and monitoring actions and to document its approach in a Quality Control Plan (QCP). The Contractor’s QCP, approved by the Government, will be made a part of the resultant agreement.

This QASP is designed to provide an effective surveillance method to monitor the contractor’s performance relative to the requirements listed in the agreement. The QASP illustrates the systematic method the Government (or its designated on-site representative) will use to evaluate the services the contractor is required to furnish.

This QASP is based on the principle that the Government will validate that the Contractor shall comply with Immigration and Customs Enforcement, Enforcement and Removal Operations (ICE/ERO) - mandated quality standards in providing security and transportation. Performance standards address all facets of transportation related services. Efficient management by the contractor and use of an approved QCP shall ensure that the Contractor shall operate within acceptable quality levels.

2. DEFINITIONS

See page 9 of Performance Work Statement (PWS)

Performance Requirements Summary (Attachment A): The Performance Requirements Summary (PRS) depicts what the Government intends to qualitatively inspect. The PRS is based on:

· M-68 (A Guide to Proper Conduct and Relationships with Aliens and the General Public)

· The ICE 2008 Performance Based National Detention Standards – A copy is obtainable on the Internet website www.ice.gov/detention-standards/2008/.

· All rules and regulations governing usage of firearms.

· Contractor providing all such armed transportation services, to include transportation, detainee supervision and record keeping services for ICE, in support of the detention and removal process.

· All transportation requirements listed under PWS.

The PRS identifies performance standards grouped into five functional areas, and quality levels essential for successful performance of each requirement. The PRS is used by the Government reviewers (or their designated representative) when conducting quality assurance surveillance to guide them through the inspection and review processes for assessing compliance in meeting Government standards.

Performance Standards:

The performance standards are established in the ICE 2008 Performance Based National Detention Standards (PBNDS) at www.ice.gov/detention-standards/2008/. Other standards may also be defined in the agreement.

Withholding:

Amount of monthly invoice payment withheld pending correction of a deficiency. See Attachment A for information on percentage of invoice amount that may be withheld for each functional area. Funds withheld from payment are recoverable (see Sections 6 and 7) if the COTR and Contracting Officer confirm resolution/correction, and should be included in the next month’s invoice.

3. QUALITY CONTROL PLAN

As a part of its agreement with the Government, the Contractor is required to develop, implement, and maintain a Quality Control Plan (QCP) that describes the methods it will use to review its performance to ensure it conforms to the performance requirements. The Contractor shall perform such reviews in order to validate its operations, and assure the Government that the services meet the performance standards.

The Contractor’s QCP should include monitoring methods that ensure and demonstrate its compliance with the performance standards. This includes inspection methods and schedules that are consistent with the regular reviews conducted by ERO. The reports and other results generated by the Contractor’s QCP activities shall be provided to the COTR as requested.

The frequency and type of the Contractor’s reviews should be consistent with what is necessary in order to ensure compliance with the performance standards, but no less frequent than what is described in the Government’s monitoring instrument/worksheets (see Attachment C).

The Contractor is encouraged not to limit its inspection to only the processes outlined in the Government’s standard; however, certain key documents must be produced by the Contractor to assure the Government that the services meet the performance standards. Some of the documentation that must be generated and made available to the COTR for inspection is listed below. The list is intended as illustrative and is not all-inclusive. The Contractor shall develop and implement a program that addresses the specific requirement of each standard and the means it will use to document compliance.

· Written policies and procedures to implement and assess operational requirements of the standard

· Documentation and record keeping ensuring ongoing operational compliance with the standards (e.g., inventories, logbooks, register of receipts, reports)

· Staff training records

· Contract Discrepancy Reports (CDR’s)

· Investigative reports

· Records of investigative actions taken

· Equipment inspections

4. METHODS OF SURVEILLANCE

The Government will inspect the services and operations provided by the Contractor using worksheets it developed for this purpose. More frequent inspections may be required by the COTR. The COTR or designee will evaluate the service provider’s performance by (a) reviewing documentation, and (b) interviewing the service provider’s personnel and/or detainees. NOTE: For day-to-day activities, the Government will conduct its surveillance using the worksheets created for this purpose, along with the Contract Deficiency Reports (CDR’s: see Attachment B) and the “Contract Performance Monitoring Tool” set forth in Attachment C. Where ICE/ERO standards are referenced for annual review purposes, the “Monitoring Instruments” and “Verification Sources” identified in ICE/ERO standard will be used.

4.1 Site Visits:

Site visits are used to observe actual performance and to conduct interviews to determine the extent of compliance with performance standards, and to ensure any noted deficiencies are effectively addressed and corrected as quickly as possible. Routine reviews may involve direct observation of the Contractor personnel performing tasks, interacting with detainees and other staff members, and/or reviewing documentation that demonstrates compliance with ICE/ERO standards. On-site inspections may be performed by the ICE COTR. Inspections may be planned (e.g., annual inspections and the regularly scheduled inspections identified in Attachment C) or ad-hoc.

4.2 Ad-Hoc:

These inspections are unscheduled and will be conducted as a result of special interests or unexpected conditions arising from routine monitoring of the Contractor’s QCP, an unusual occurrence pertaining to the agreement, or other ICE concerns. These inspections may also be used as a follow-up to a previous inspection. Inspection findings will be provided to the Contractor as appropriate.

When visiting a site, either the COTR or a designated third party may conduct their own inspections of the Contractor’s performance activities, or accompany the Contractor’s designated Quality Control Inspector (QCI) on scheduled inspections. The COTR may also immediately inspect the same area as soon as the QCI has completed the quality control inspection to determine if any surveillance areas were overlooked. The COTR may also inspect an area prior to the QCI and compare results. The COTR will record all findings; certain deficiencies noted will be provided in writing and must be corrected within a reasonable amount of time (see Attachment B).

4.3 Review of Documentation:

The Contractor must develop and maintain all documentation as prescribed in the performance standards (e.g., post logs, policies, and records of corrective actions). In addition to the documentation prescribed by the standards, the Contractor shall also develop and maintain documentation that demonstrates the results of its own inspections as prescribed in its QCP. The COTR will review both forms of documentation to affirm that the conditions, policies/procedures, and handling of detainees all conform to the performance standards stated herein. When reviewing the Contractor’s documentation, the Government will review all the documents, or a representative sample. Documentation may be reviewed during a site visit, or at periodic points throughout the period of performance.

Interviews and Other Feedback:

The COTR will interview key members of the Contractor’s staff, detainees, and other Government personnel to ascertain current practices and the extent of compliance with the performance standards.

5. FUNCTIONAL PERFORMANCE AREAS AND STANDARDS

To facilitate the performance review process, the required performance standards are organized into five (5) functional areas corresponding to the requirements in the Performance Requirements Summary (PRS). Each functional area represents a proportionate share (i.e., weight) of the monthly invoice amount payable to the service provider based on meeting the performance standards. Payment withholdings will be based on these percentages and weights applied to the overall monthly invoice.

ICE may consistent with the scope of the contract, unilaterally change the functional areas and associated standards affiliated with a specific functional area. The Contracting Officer will notify the Contractor at least 30 calendar days in advance of implementation of the new standard(s). If the Contractor is not provided with the notification, adjustment to the new standard must be made within 30 calendar days after notification. If any change affects pricing, the Contractor may submit a request for equitable price adjustment in accordance with the FAR Clause 52.212-4(c) Contract Terms and Conditions - Commercial Items - Changes clause. ICE reserves the right to develop and implement new inspection techniques and instructions at any time during the performance without advance notice to the Contractor, so long as the standards are not more stringent than those being replaced, unless agreed upon by the parties. The Contractor shall provide a safe and secure environment for staff and detainees through effective and continuously monitored program management.

6. FAILURE TO MEET PERFORMANCE STANDARDS

Performance of services in conformance with the PRS standards is essential for the Contractor to receive full payment as identified in the contract. The Contracting Officer may take deductions against the monthly invoices for unsatisfactory performance documented through surveillance of the Contractor’s activities gained through site inspections, reviews of documentation (including monthly QCP reports), interviews, and other feedback. As a result of its surveillance, the Contractor will be assigned the following rating relative to each performance standard:

Rating
Description
Acceptable
Based on the measures, the performance standard is demonstrated.
Deficient
Based on the measures, compliance with most of the attributes of the performance standard is demonstrated/observed with some area(s) needing improvement. There are no critical areas of unacceptable performance.
At-Risk
Based on the performance measures, the majority of a performance standard’s attributes are not met.

Using the above standards as a guide, the Contracting Officer will implement adjustments to the Contractor’s monthly invoice as prescribed in Attachment A.

Rather than withholding funds until a deficiency is corrected, there may be times when an event or a deficiency is so egregious that the Government deducts (vs. “withholds”) amounts from the Contractor’s monthly invoice. This may happen when an event occurs, such as an escape, traffic accident due to the Contractor negligence or sexual abuse, when a particular deficiency is noted three or more times without correction, or when the Contractor has failed to take timely action on a deficiency about which he/she was properly and timely notified. The amount deducted will be consistent with the relative weight of the functional performance area where the deficiency was noted. The deduction may be a one-time event, or may continue until the Contractor has either corrected the deficiency, or made substantial progress in the correction.

Further, a deficiency found in one functional area may tie into another. If a detainee escaped, for example, a deficiency would be noted in “Security and Control,” but may also relate to a deficiency in the area of “Administration and Management.”

7. NOTIFICATIONS

(a) Based on the inspection of the Contractor’s performance, the COTR will document instances of deficient or at-risk performance (e.g., noncompliance with the standard) using the CDR form located at Attachment B. To the extent practicable, issues should be resolved informally, with the COTR and contractor working together. When documentation of an issue or deficiency is required, the procedures set forth in this section will be followed.

(b) When a CDR is required to document performance issues, it will be submitted to the Contractor with a date when a response is due. Upon receipt of a CDR, the Contractor shall immediately assess the situation and either correct the deficiency as quickly as possible or prepare a corrective action plan. In either event, the Contractor shall return the CDR with the action planned or taken noted. After the COTR reviews the Contractor’s response to the CDR including its plan/remedy, the COTR will either accept plan or correction or reject the correction/plan for revision and provide an explanation. This process should take no more than one week. The Contractor shall not use the CDR as a substitute for quality control.

(c) The COTR and CO, in addition to any other designated ICE official, shall be notified immediately in the event of all emergencies. Emergencies include but are not limited to the following: staff use of force including use of lethal and less-lethal force (includes detainees in restraints more than eight hours); assaults on staff/detainees resulting in injuries requiring medical attention (does not include routine medical evaluation after the incident); fights resulting in injuries requiring medical attention; fires; escape; weapons discharge; suicide attempts; deaths; adverse incidents that attract unusual interest or significant publicity; adverse weather (e.g., hurricanes, floods, ice/snow storms, heat waves, tornadoes); transportation accidents resulting in injuries, death, or property damage; and sexual assaults. Note that in an emergency situation, a CDR may not be issued until an investigation has been completed.

(d) If the COTR concludes that the deficient or at-risk performance warrants a withholding or deduction, the COTR must include the complete CDR (with official response from Contractor/service provider) in its monthly report to ICE/ERO Headquarters, with a copy to the Contracting Officer. The CDR must be accompanied by the COTR’s investigation report and written recommendation for any withholding. If contractual action including a withholding or deduction is appropriate, ICE/ERO headquarters will forward the CDR and supporting information to the Contracting Officer for action. The Contracting Officer will consider the COTR’s recommendation and forward the CDR along with any relevant supporting information to the contractor in order to confirm or further discuss the prospective cure, including the Government’s proposed course of action. As described in Section 6 above, portions of the monthly invoice amount may be withheld until such time as the corrective action is completed, or a deduction may be taken.

(e) Following receipt of the Contractor’s notification that the correction has been made, the COTR may re-inspect. Based upon the COTR’s findings, he/she will recommend that the Contracting Officer continue to withhold a proportionate share of the payment until the correction is made, or accept the correction as final and release the full amount withheld for that issue.

(f) If funds have been withheld and either the Government or the Contractor terminates the agreement, those funds will not be released. The Contractor may only receive withheld payments upon successful correction of an instance of non-compliance. Further, the Contractor shall not relieved of full performance of the required services hereunder; the agreement may be terminated upon adequate notice from the Government based upon any one instance, or failure to remedy deficient performance, even if a deduction was previously taken for any inadequate performance.

(g) The COTR will maintain a record of all open and resolved CDRs.

8. DETAINEE/MEMBER OF PUBLIC COMPLAINTS

The Government, detainee and the public are the ultimate recipients of the services identified in this contract. Any complaints made known to the COTR will be logged and forwarded to the contractor for remedy. Upon notification, the Contractor will be given a pre-specified number of hours after verbal notification from the COTR to address the issue. The Contractor shall submit documentation to the COTR regarding the actions taken to remedy the situation. If the complaint is found to be invalid, the Contractor shall document its findings and notify the COTR.

9. ATTACHMENTS

A. Performance Requirements Summary

B. Contract Discrepancy Report

C. Performance Monitoring Tool

Attachment A - Performance Requirements Summary

FUNCTIONAL

AREA/

WEIGHT

PERFORMANCE

STANDARD (NDS, ICE POLICIES, PWS)

PERFORMANCE

MEASURE

METHOD OF

SURVEILLANCE

ACCEPTABLE

QUALITY

LEVEL

WITHHOLDING

CRITERIA

Safety

(20%)

(Addresses a safe work environment for staff, volunteers, contractors and detainees) PBNDS References: Part 1 - SAFETY

1) Emergency Plans;

2) Environmental Health and Safety;

3) Transportation (by Land).

Performance measures are reflected in the monitoring instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR

Annual review of facility using

Detention Management Control

Program (DMCP) procedures and based upon the performance standard

Periodic reviews in accordance with the contract performance monitoring tool (see attached)

· Annual review of facility using Detention

Management Control

Program (DMCP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool

· Monthly review of corrective action plan results

· Ad-hoc reviews as needed

· CDRs Performance fully complies with all elements of standard at a level no less than acceptable (see

Section 6 of the

QASP)

A Contract Discrepancy Report that cites violations of cited

PBNDS and PWS (contract) sections that provide a safe work environment for staff, volunteers, contractors and detainees, permits the Contract

Officer to withhold or deduct up to 20% of a monthly invoice until the Contract

Officer determines there is full compliance with the standard or section.

Security

(20%)

(Addresses protect the community, staff, contractors, volunteers, and detainees from harm) PBNDS References: Part 2 - SECURITY

4) Admission and Release;

5) Classification System;

6) Contraband;

7) Facility Security and Control;

8) Funds and Personal Property;

9) Hold Rooms in Detention Facilities;

10) Key and Lock Control;

11) Population Counts;

12) Post Orders;

13) Searches of Detainees;

14) Sexual Abuse and Assault Prevention and Intervention;

15) Special Management Units;

16) Staff-Detainee Communication;

17) Tool Control;

18) Use of Force and Restraints.

Weapons Control 4-ALDF-2B-04, 4-ALDF-2B-08, 4-ALDF-7B-14

Sexual Assault 4-ALDF-4D-22-8

Permanent Logs 4-ALDF-2A-11 Performance measures are reflected in the monitoring instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR

Annual review of facility using

Detention Management Control

Program (DMCP) procedures and based upon the performance standard

Periodic reviews in accordance with the contract performance monitoring tool (see attached)

· Annual review of facility using Detention

Management Control

Program (DMCP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool

· Monthly review of corrective action plan results

· Ad-hoc reviews as needed

· CDRs Performance fully complies with all elements of standard at a level no less than acceptable (see

Section 6 of the

QASP)

A Contract Discrepancy Report that cites violations of PBNDS and PWS (contract) sections that protect the community, staff, contractors, volunteers, and detainees from harm, permits the Contract Officer to withhold or deduct up to 20% of a monthly invoice until the

Contract Officer determines there is full compliance with the standard or section.

Order

(10%)

(Addresses contractor responsibility to maintain an orderly environment with clear expectations of behavior and systems of accountability) PBNDS Reference: Part 3 - ORDER

19) Disciplinary System.

Diversity Training 4-ALDF-6A-08, 4-ALDF-7B-10 Performance measures are reflected in the monitoring instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR

Annual review of facility using

Detention Management Control

Program (DMCP) procedures and based upon the performance standard

Periodic reviews in accordance with the contract performance monitoring tool (see attached)

· Annual review of facility using Detention

Management Control

Program (DMCP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool

· Monthly review of corrective action plan results

· Ad-hoc reviews as needed

· CDRs Performance fully complies with all elements of standard at a level no less than acceptable (see

Section 6 of the

QASP)

A Contract Discrepancy Report that cites violations of PBNDS and PWS (contract) sections that maintain an orderly environment with clear expectations of behavior and systems of accountability permits the Contract Officer to withhold or deduct up to 10% of a monthly invoice until the

Contract Officer determines there is full compliance with the standard or section.

Care

(20%)

(Addresses contractor responsibility to provide for the basic needs and personal care of detainees) PBNDS References: Part 4 - CARE

20) Food Service;

21) Hunger Strikes;

22) Medical Care;

23) Personal Hygiene;

24) Suicide Prevention and Intervention;

25) Terminal Illness, Advanced Directives, and Death.

Experimental Research 4-ALDF-4D-18 Communicable Disease 4-ALDF-4C-14

Performance measures are instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR

Annual review of facility using

Detention Management Control

Program (DMCP) procedures and based upon the performance standard

Periodic reviews in accordance with the contract performance monitoring tool (see attached)

· Annual review of facility using Detention

Management Control

Program (DMCP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool

· Monthly review of corrective action plan results

· Ad-hoc reviews as needed

· CDRs Performance fully complies with all elements of standard at a level no less than acceptable (see

Section 6 of the

QASP)

A Contract Discrepancy

Report that cites violations of PBNDS and

PWS(contract) sections that provide for the basic needs and personal care of detainees, permits the

Contract Officer to withhold or deduct up to 20% of a monthly invoice until the

Contract Officer determines there is full compliance with the standard or section.

Activities

(10%)

(Addresses contractor responsibilities to reduce the negative effects of confinement) PBNDS References: Part 5 - ACTIVITIES

26) Correspondence and Other Mail;

27) Escorted Trips for Non-Medical

Emergencies;

28) Marriage Requests;

29) Recreation;

30) Religious Practices;

31) Telephone Access;

32) Visitation;

33) Voluntary Work Program.

Performance measures are instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR

Annual review of facility using

Detention Management Control

Program (DMCP) procedures and based upon the performance standard

Periodic reviews in accordance with the contract performance monitoring tool (see attached)

· Annual review of facility using Detention

Management Control

Program (DMCP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool

· Monthly review of corrective action plan results

· Ad-hoc reviews as needed

· CDRs Performance fully complies with all elements of standard at a level no less than acceptable (see

Section 6 of the

QASP)

A Contract Discrepancy

Report that cites violations of PBNDS and PWS

(contract) sections that reduce the negative effects of confinement permits the

Contract Officer to withhold or deduct up to 10% of a monthly invoice until the

Contract Officer determines there is full compliance with the standard or section.

Justice

(5%)

(Addresses contractor responsibilities to treat detainees fairly and respect their legal rights-At this

Contract Detention

Facility, performance of the applicable

PBNDS are the responsibility of ICE and are not the responsibility of the

Contractor) PBNDS References: Part 6 - JUSTICE

34) Detainee Handbook;

35) Grievance System;

36) Law Libraries and Legal Materials;

37) Legal Rights Group Presentations.

Performance measures are reflected in the monitoring instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR
· Annual review of facility

using Detention

Management Control

Program (DMCP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool

· Monthly review of corrective action plan results

· Ad-hoc reviews as needed

· CDRs Performance fully complies with all elements of standard at a level no less than acceptable (see

Section 6 of the

QASP)

A Contract Discrepancy

Report that cites violations of PBNDS and PWS sections that treat detainees fairly and respect their legal rights, permits the Contract Officer to withhold or deduct up to

5% of a monthly invoice until the Contract Officer determines there is full compliance with the standard or section.

Administration and

Management

(5%)

(Addresses contractor responsibilities to administer and manage the facility in a professional and responsible manner consistent with legal requirements) PBNDS References: Part 7 - -ADMIN &

MANAGEMENT

38) Detention Files;

39) News Media Interviews and Tours;

40) Staff Training;

41) Transfer of Detainees;

Policy Development and Monitoring 4-ALDF-7D-06

Contractor Quality Control/ Assurance Program (Contract) 4-ALDF-7D-02

Accommodations for the Disabled, 4-ALDF-6B-04, 4-ALDF-6B-07

Performance measures are instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR

· Annual review of facility using Detention

Management Control

Program (DMCP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool

· Monthly review of corrective action plan results

· Ad-hoc reviews as needed

· CDRs Performance fully complies with all elements of standard at a level no less than acceptable (see

Section 6 of the

QASP)

A Contract Discrepancy

Report that cites violations of PBNDS and PWS sections that require the Contractor’s administration and management of the facility in a professional and responsible manner consistent with legal requirements, permits the

Contract Officer to withhold or deduct up to 5% of a monthly invoice until the

Contract Officer determines there is full compliance with the standard or section.

Workforce Integrity

(5%)

(Addresses the adequacy of the detention/correctional officer hiring process, staff training and licensing/ certification and adequacy of systems to report and address staff misconduct) Staff Background and Reference Checks (Contract) 4-ALDF-7B-03

Staff Misconduct 4-ALDF-7B-01

Staffing Pattern Compliance within 10% of required (Contract) 4-ALDF-2A-14

Staff Training, Licensing, and Credentialing (Contract) 4-ALDF-4D-05, 4-ALDF-7B-05, 4-ALDF-7B-08

Performance measures are reflected in the monitoring instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR
· Annual review of facility using Detention Management Control Program (DCMP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached contract performance monitoring tool

· Monthly review of corrective action plan results.

· Ad-hoc reviews as needed

· CDRs

Performance fully complies with all elements of standard at a level no less than acceptable (See section 7 of the QASP)

A rating of Deficient on any three of the standards will result in a 5% withholding in the monthly invoiced per-diem day rate until compliance with the standard is established.

A rating of At-Risk on any of the standards will result in a 5% withholding in the monthly invoiced per-diem day rate until compliance with the standard is established.

Detainee Discrimination (5%)

(Addresses the adequacy of policies and procedures to prevent discrimination against detainees based on their gender, race, religion, national origin, or disability)

Discrimination Prevention 4-ALDF-6B-02-03
Performance measures are reflected in the monitoring instrument that accompanies each standard or in the supplemental performance monitoring tool issued by the COTR
· Annual review of facility using Detention Management Control Program (DCMP) procedures and based upon the performance standard

· Periodic reviews in accordance with the attached performance monitoring tool (see attached)

· Monthly review of corrective action plan results.

· Ad-hoc reviews as needed

· CDRs

Performance fully complies with all elements of standard at a level no less than acceptable (see Section 7 of the QASP)
A rating of Deficient on the standards will result in a 5% withholding in the monthly invoiced per-diem day rate until compliance with the standard is established.

A rating of At-Risk on any of the standards will result in a

5% withholding in the monthly invoiced per-diem day rate until compliance with the standard is established.

Mobilization: The Government may withhold or deduct monthly invoiced amount for failure to meet to the Mobilization Plan as follows:

Number of Working Days after the date in the Mobilization Plan the Contractor was to assume full performance.
Amount Withheld or Deducted from the monthly invoice.
1 to 5 Working Days
Up to 5% withhold
6 to 10 Working Days
Up to 10% withhold
11 to 15 Working Days
Up to 15% withhold or deducted*
16 to 20 Working Days and beyond
Up to 20% withhold or deducted*
21 Working Days and beyond
Up to 25% withhold or deducted*

* The Government may deduct amounts from the invoice if it determines the Contractor is failing to make substantial progress in meeting the schedule. The decision to withhold or deduct invoice amounts is solely at the discretion of the Government. Deducted amounts are not recoverable by the Contractor.

The following is a breakdown of the percentage amounts that will be withheld or deducted for each functional area for 1st offense through 4th offense in deficient and at-risk. As stated in the withholding and deduction criteria, no more than the total weight for each functional area (for example 15% for Administration and Management) will be withheld or deducted on a monthly invoiced per diem day rate. The offenses will be recorded on a 12 month basis.

WITHHOLDING

Deficient
1st Offense
2nd Offense
3rd Offense
4th Offense
Administration & Management
3.75%
7.50%
11.25%
15.00%
Security & Control
6.25%
12.5
18.75
25.00%
Detainee Care
5.00%
10.00%
15.00%
20.00%
Safety Standards
6.25%
12.5
18.75
25.00%
Order
3.75%
7.50%
11.25%
15.00%

DEDUCTION

At-Risk
1st Offense
2nd Offense
3rd Offense
4th Offense
Administration & Management
3.75%
7.50%
11.25%
15.00%
Security & Control
6.25%
12.5
18.75
25.00%
Detainee Care
5.00%
10.00%
15.00%
20.00%
Safety Standards
6.25%
12.5
18.75
25.00%
Order
3.75%
7.50%
11.25%
15.00%

Attachment B - Contract Discrepancy Report

CONTRACT DISCREPANCY REPORT

1. CONTRACT NUMBER

Report Number:
Date:

2. TO: (Contractor and Manager Name)

3. FROM: (Name of COTR)

DATES

CONTRACTOR NOTIFICATION

CONTRACTOR RESPONSE DUE BY
RETURNED BY CONTRACTOR
ACTION COMPLETE

4. DISCREPANCY OR PROBLEM (Describe in Detail: Include reference in PWS / Directive: Attach continuation sheet if necessary.)

5. SIGNATURE OF CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE (COTR)

6. TO: (COTR)

7. FROM: (Contractor)

8. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. ATTACH

CONTINUATION SHEET IF NECESSARY. (Cite applicable Q.A. program procedures or new A.W. procedures.)

9. SIGNATURE OF CONTRACTOR REPRESENTATIVE

10. DATE

11. GOVERNMENT EVALUATION OF CONTRACTOR RESPONSE/RESOLUTION PLAN: (Acceptable response/plan, partial acceptance of response/plan, rejection: attach continuation sheet if necessary)

12. GOVERNMENT ACTIONS (Payment withholding, cure notice, show cause, other.)

CLOSE OUT

NAME AND TITLE
SIGNATURE
DATE

CONTRACTOR

NOTIFIED

COTR

CONTRACTING

OFFICER

Attachment C – Performance Monitoring Tool

Detention and Removal Operations

Performance Monitoring Tool

Facility Name: _____________ _ Month/Year: _______

Frequency

DETENTION STANDARD
Rating A/D/R
Corrective Action Required / Comments
Due Date
D
W
M
Q

1. Admission and Release

A.
ICE information is available for initial classification
B.
Medical screening taking place within timeframes
C.
Inventory resident personal effects
D.
Resident funds accountability in place for admin/release
E.
All visual searches documented and are not routine in procedure
F.
Appropriate clothing and bedding issued
G.
Orientation material in English, Spanish or most prevalent second language

2. Resident Classification System

A.
All residents classified appropriately upon arrival
B.
Reassessment and reclassification process in place
C.
Housing assignments are based upon classification
D.
Work assignments are based upon classification system
E.
Residents are assigned color coded uniforms/wrist bands to reflect classification level

3. Contraband

A.
Policy in place for handling contraband
B.
Contraband disposed of properly and documented
C.
Facility staff make a concerted effort to control contraband
D
W
M
Q
DETENTION STANDARD
Rating A/D/R
Corrective Action Required/ Comments
Due Date

4. Correspondence and Other Mail

A.
Incoming mail screened and delivered daily
B.
Outgoing mail screened for contraband
C.
Legal mail opened in front of resident
D.
Incoming funds processed properly
E.
Rules for correspondence and other mail posted in housing unit or common areas, and resident handbook
F.
Facility has a system for residents to purchase stamps
G.
SMU has same correspondence privileges as general population

5. Resident Handbook

A.
Staff aware of handbook contents and follow procedures
B.
Available in both English and Spanish and/or second most prevalent language
C.
Handbook is updated as necessary
D.
Orientation material available to illiterate residents

6. Detention Files

A.
Detention file created for each new arrival
B.
Detention files contain documents generated during custody
C.
Detention files maintained in a secure area

7. Disciplinary Policy

A.
Rules of conduct/sanctions provided in writing
B.
Incident reports investigated within 24 hours
C.
Disciplinary panel adjudicate infractions
D.
Disciplinary sanctions are in accordance with standards
E.
Staff representation available
D
W
M
Q
DETENTION STANDARD
Rating

A/D/R

Corrective Action Required / Comments
Due Date

8. Emergency Plans

A.
Staff trained
B.
Written plans
C.
Evacuation routes primary and secondary
D.
A complete set of emergency plans is available
E.
Staff work stoppage plan is available

9. Environmental Health and Safety

A.
System for storing/issuing/maintaining hazardous materials
B.
Complete inventories of hazardous materials maintained
C.
A complete list of MSDS readily accessible to staff and residents
D.
Fire prevention/control/evacuation plan
E.
Conduct fire/evacuation drills according to schedule/standard
F.
Staff trained to prevent contact with blood and bodily fluids
G.
Emergency generators are tested bi-weekly
H.
Every employee and resident using flammable, toxic, or caustic materials receives advance training in their use, storage, and disposal
I.
Safety Office (or officer) maintains files of inspection reports; Including corrective actions taken
J.
Facility appears clean and well maintained
K.
All flammable and combustible materials (liquid and aerosol) are stored and used according to label recommendations
D
W
M
Q
DETENTION STANDARDS
Rating

A/D/R

Corrective Action Required / Comments
Due Date

10. Non-Medical Emergency Escorted Trips

A.
The Field Office Director considers and approves, on a case-by-case basis, trips to visit an immediate family member in accordance with standards

11. Security Inspections

A.
Staff are required to conduct security check of assigned areas
B.
All visitors officially recorded in a visitor log book
C.
Front entrance staff inspect ID of everyone entering/exiting
D.
Maintain a log of all incoming and departing vehicles
E.
Housing unit searches occur at irregular times
F.
Area searches documented in log book
G.
Daily/Monthly fence checks completed and logged
H.
Facility administrator or designee and department heads visit housing units and activity areas weekly
I.
Officers monitor all vehicular traffic entering and leaving the facility
J.
The facility has a written policy and procedures to prevent the introduction of contraband into the facility or any of its components
K.
Security officer posts located in or immediately adjacent to resident living areas to permit officers to see or hear and respond promptly to emergency situations. Personal contact and interaction between staff and residents is required and facilitated
L.
Daily procedures include: perimeter alarm system tests; physical checks of the perimeter fence; documenting the results
D
W
M
Q
DETENTION STANDARDS
Rating

A/D/R Corrective Action Required/

Comments Due Date

M.
Tools being taken into the secure area of the facility are inspected and inventoried

12. Food Service

A.
Appropriate security measures for sharps are in place
B.
Appropriate food temperatures are maintained for both hot and cold food
C.
Food Service department maintained at a high level of sanitation
D.
Residents receive safety and appropriate equipment training prior to beginning work in department
E.
A minimum of two hot meals served daily
F.
Facility has a standard 35 day cycle menu
G.
A registered dietician conducts nutritional analysis
H.
All menu changes documented
I.
Common fare menu for authorized residents
J.
Weekly inspections conducted and documented

13. Funds and Personal Property

A.
Inventory personal property/funds is maintained
B.
Funds/valuables documented on receipt
C.
Residents property searched for contraband
D.
Staff forward arriving residents medication to medical staff
E.
Resident funds are deposited into the cash box
F.
Staff secure every container used to store property with a tamper-proof numbered strap
G.
Quarterly audits of resident baggage & luggage are conducted, verified, and logged
D
W
M
Q
DETENTION STANDARDS
RATING

A/D/R Corrective Action Required/

Comments Due Date

14. Resident Grievance Procedures

A.
Grievance procedures in place
B.
Staff awareness of procedures for emergency grievances
C.
Grievance log is utilized
D.
Staff forward any grievances alleging staff misconduct to ICE
E.
Informal resolution to a resident grievance documented in detention file

15. Hold Rooms in Detention Facilities

A.
Residents are not held in hold rooms longer than 12 hours
B.
All residents pat searched prior to placement in hold room
C.
Maintain detention log for each resident in hold room
D.
Written evacuation plan posted for each hold room
E.
Hold rooms contain sufficient seating for the number of residents held
F.
No bunks/cots/beds or other related make shift sleeping apparatuses are permitted inside hold rooms
G.
Male and females are segregated from each other at all times
H.
Residents are provided with basic personal hygiene items such as water, soap, toilet paper, cups for water, feminine hygiene items, diapers and wipes
I.
Officers closely supervise the detention hold rooms. Hold rooms are irregularly monitored every 15 minutes

16. Hunger Strikes

A.
Procedures for referring resident to medical if verbally refused or observed refusing to eat beyond 72 hours
D
W
M
Q
DETENTION STANDARDS
Rating

A/D/R

Corrective Action Required / Comments
Due Date
B.
Staff receive training in identification of hunger strike
C.
Process for determining reason for hunger strike

17. Key and Lock Control

A.
Maintain inventories of all keys/locks/locking devices
B.
Emergency keys are available for all areas of the facility
C.
Chit system used to issue security equip./keys/radios
D.
Policy regarding restricted keys present and followed by staff
E.
Facility has a key accountability policy and procedures to ensure key accountability. The keys are physically counted daily
F.
Locks and locking devices are continually inspected, maintained, and inventoried

18. Access to Legal Material

A.
Adequate equipment is available for residents
B.
Legal materials/law library current and available for residents
C.
Resident access provided to include SMU
D.
Denials documented
E.
Schedule for use implemented 5 hours weekly per resident
F.
Access to legal material within 24 hours of written request
G.
Indigent residents provided free stamps/envelopes for legal matters

19. Group Presentations on Legal Rights

H.
ICE/DRO approved videos played for all incoming residents
I.
Posters announcing presentation appear in common areas at least 48 hours prior to presentation
D
W
M
Q
DETENTION STANDARDS
Rating

A/D/R

Corrective Action Required / Comments
Due Date
J.
Residents in SMU receive separate presentation
K.
Facility ensures adequate presentations so all residents wanting to attend have the opportunity

20. Marriage Requests

A.
Marriage written requests approved by FOD

21. Medical Care

A.
Intake process includes medical and mental health screening
B.
Sick call procedures established
C.
Adequate medical staff available proportionate to population
D.
Pharmaceuticals stored in a secure area
E.
All residents receive physical examination/assessment within 14 days of arrival
F.
Sick call slips available in English, Spanish and/or most prevalent second language
G.
The facility has a written plan for 24 hour emergency health care when no medical staff are on-duty or when immediate outside medical attention is required
H.
Medical records are available and transferred with the resident
I.
Records are maintained of medication distribution
J.
All sharps are under strict control and accountability
K.
A sharps container is used to dispose of used sharps
L.
The medical department is maintained at a high level of sanitation
D
W
M
Q
DETENTION STANDARDS
Rating A/D/R
Corrective Action Required / Comments
Due Date

22. Issuance and Exchange of Clothing, Bedding, and Towels

A.
Clothing provided upon intake and exchanged weekly
B.
Sheets and towels exchanged weekly
C.
Climate appropriate clothing issued and maintained in good repair
D.
Facility provides and replenishes personal hygiene items as needed, at no cost to resident
E.
Showers operate between 100 degrees and 120 degrees
F.
Showers meet ADA standards and requirements
G.
Food Service resident volunteers exchange garments daily

23. Population Counts

A.
Staff conduct formal count at least once per 8 hour shift/ 3x per day
B.
At least two officers participate in count for each area
C.
Recount conducted when incorrect count is reported
D.
Face to photo count conducted as necessary
E.
Each resident positively identified during count

24. Post Orders

A.
Every post has a post order, current & signed by the facility administrator
B.
Housing unit officers record all resident activity in a log
C.
Supervisor visits each housing area once per shift
D.
Staff sign post orders, regardless of whether the assignment is temporary, permanent, or due to an emergency
E.
Anyone assigned to an armed post qualifies with the post weapons before assuming post duty
D
W
M
Q
DETENTION STANDARDS
Rating

A/D/R

Corrective Action Required / Comments
Due Date

25. Recreation

A.
Outdoor/indoor recreation is provided
B.
Access to recreation activities 1 hour x 5 days
C.
Staff conduct daily searches of recreation areas
D.
In unit sedentary activities are available

26. Religious Practices

A.
Residents are allowed to engage in religious services
B.
Authorized religious items are allowed in resident possession

27. Special Management Unit (Administrative Segregation)

A.
Written order accompany resident placed in SMU
B.
SMU reviews are conducted in a timely manner (3,7,14,30,60)
C.
Residents in SMU have access to legal materials
D.
Residents in SMU retain visiting privileges
E.
Maintain a permanent log regarding resident related activities
F.
SMU phone access same as general pop unless exception is made
G.
Residents in SMUs may shave and shower three times weekly and receive other basic services (laundry, hair care, barbering, clothing, bedding, linen) on the same basis as the general population
H.
The facility administrator (or designee) visits each SMU daily
I.
A health care provider visits every resident in a SMU at least 3x week, and residents are provided any medications prescribed for them
D
W
M
Q
DETENTION STANDARDS
Rating A/D/R
Corrective Action Required / Comments
Due Date
J.
Residents in the SMU are offered at least one hour of recreation per day, scheduled at a reasonable time, at least five days per week. Where cover is not provided to mitigate inclement weather, residents are provided weather-appropriate equipment and attire
K.
When a resident has been held in Admin Segregation for more than 30 days, the facility administrator notifies the Field Office Director, who notifies the ICE/DRO Deputy Assistant Director, Detention Management Division

28. Special Management Unit (Disciplinary Segregation)

A.
Written order accompany resident placed in SMU
B.
SMU reviews are conducted in a timely manner (3,7,14,30,60)
C.
Admin SMU residents enjoy same privileges as gen pop
D.
Residents in SMU have access to legal materials
E.
Residents in SMU retain visiting privileges
F.
Maintain a permanent log regarding resident related activities
G.
Written order accompany resident placed in disciplinary SMU
H.
Residents in disciplinary SMU have access to legal materials
I.
Residents in disciplinary SMU retain visiting privileges
J.
Disciplinary SMU phone access limited to legal/consular calls
K.
Residents in SMUs may shave and shower three times weekly and receive other basic services (laundry, hair care, barbering, clothing, bedding, linen) on the same basis as the general population
D
W
M
Q
DETENTION STANDARDS
Rating

A/D/R

Corrective Action Required / Comments
Due Date
L.
The facility administrator (or designee) visits each SMU daily
M.
A health care provider visits every resident in a SMU at least 3x week, and residents are provided any medications prescribed for them
N.
Residents in the SMU are offered at least one hour of recreation per day, scheduled at a reasonable time, at least five days per week. Where cover is not provided to mitigate inclement weather, residents are provided weather-appropriate equipment and attire

29. Staff-Resident Communication

A.
Housing unit rounds conducted daily by security staff
B.
Housing unit rounds conducted daily by Deportation Staff
C.
Resident requests answered within 72 hours
D.
ICE SDC visit schedules are posted in housing unit
E.
Request forms are available to residents
F.
There is a secure box available for residents to place requests in for ICE staff that is checked on a daily basis
G.
Unannounced ICE staff housing unit visits occur weekly
H.
Visiting staff observe, document and communicate current climate and conditions of confinement

30. Suicide Prevention and Intervention

A.
The facility has a written suicide prevention and intervention program approved and signed by the health authority and facility administrator which is reviewed annually
B.
Every new staff member receives suicide-prevention training. Suicide-prevention training occurs during the employee orientation program and annually thereafter
C.
The facility has a designated and approved isolation room for evaluation and treatment
D
W
M
Q
DETENTION STANDARDS
Rating

A/D/R

Corrective Action Required / Comments
Due Date
D.
Staff observes and documents the status of a suicide-watch resident at least once every 15 minutes

31. Telephone Access

A.
Upon intake, residents are made aware of phone policies
B.
Out of order phones reported to service provider
C.
Telephones inspected regularly by staff
D.
Telephone access rules posted in each housing unit
E.
The number for the ICE OIG is posted in housing units
F.
The pro bono list is posted in housing units
G.
Emergency phone call messages delivered to residents
H.
Special access calls are available to residents
I.
Notification of telephone monitoring posted by unit phones

32. Terminal Illness, Advanced Directives, and Death

A.
Residents who are chronically or terminally ill are transferred to an appropriate off-site facility
B.
The facility has written plans for addressing organ donations
C.
There is a policy addressing Do Not Resuscitate Orders
D.
The facility has written procedures detailing the proper notifications

33. Tool Control

A.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .