PR_20088288_Canopy_SOW_08252015.pdf
PDF 1 MB Posted
- Attached to
- Canopy Assembly Federal contract opportunity
- Solicitation number
- HSBP1015Q0187
About this file
Statement of Work updated with security screening instructions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PR_20088288_Canopy_SOW_09162015.pdf | ||
| HSBP1015Q0187-Past_Performance_Contacts.docx | DOCX document | |
| Sample_Traffic_Control_Plan.pdf | ||
| HSBP1015Q0187_A01_09142015.pdf | ||
| HSBP1015Q0187-QA_1.pdf | ||
| Sample_Traffic_Control_Plan.pdf | ||
| PR_20088288_Canopy_SOW_08282015.pdf | ||
| WD_05-2025_(Rev.-18).pdf | ||
| PR_20088288_Canopy_SOW_08212015.pdf | ||
| HSBP1015Q0187_A00_08212015.pdf | ||
| HSBP1015Q0187-Past_Performance_Contacts.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR 20088288 Canopy SOW_08252015.docx 8/25/2015 3:08 PM
STATEMENT OF WORK
TENSION CLOTH CANOPY INSTALLATION
FOR U.S. CUSTOMS AND BORDER PROTECTION
HIGHWAY 85 MILE POST 58
TUCSON SECTOR
AJO SOUTH TRAFFIC CHECKPOINT
AJO STATION LLF TRAINING
1. INTRODUCTION
The purpose of this statement of work (SOW) is to procure technical subject matter expertise (SME), construction and engineering services for installation of a tension cloth canopy for the United States Border Patrol Tucson Sector and Facilities Management and
Engineering Office (FM&E) of the U.S. Customs and Border Protection (CBP), a component of the Department of Homeland Security (DHS).
2. BACKGROUND
Office of Border Patrol has discontinued operations of the I-8 Traffic Checkpoint and
Tucson Sector is re-purposing the tension cloth canopy from the I-8 checkpoint to enhance the Ajo Station’s Highway 85 Traffic Checkpoint located south of Why, Arizona. This SOW will include disassembly and installation of the existing Ajo checkpoint canopy at the Ajo Station and transportation/installation of the re-purposed stored canopy from the Ajo Station to the Ajo Highway 85 Checkpoint.
3. SCOPE OF WORK
a. General.
The Contractor, as an independent contractor and not as an agent of the
Government, shall, in accordance with the terms and conditions more particularly set forth below, furnish all services, materials, supplies, labor, equipment, transportation, and travel as necessary for the performance of the work specified herein.
b. Project Description.
The project involves removal of the existing canopy at the Ajo South Traffic
Checkpoint, transporting it to the Ajo Station, and erecting the canopy in the Ajo
Station compound to the original manufacturer’s specifications.
The contractor will conduct grading, stabilization, and backfill work at the Ajo
Highway 85 Checkpoint meeting ADOT requirements and the original specific
Statement Of Work
PR 20088288-Canopy Relocation manufacturer specifications for load and wind shear requirements, footings and anchors for the stored canopy.
The contractor will be responsible to transport the canopy from the Ajo Station to the checkpoint site for assembly.
The contractor will purchase and install a new full-coverage canopy cloth on the stored canopy frame in accordance with manufacturer’s specifications.
The contractor will assemble the tension cloth canopy to the original manufacturer’s specifications meeting all regulations set forth by ADOT and stated in this document.
The contractor will replace all light fixtures (16) with modern high efficiency lights that meet or exceed light output of the original equipment and replace electrical outlets (4) with new.
The contractor will purchase and install all vehicle/personnel barriers and semi-permanent/permanent speed control devices and signs as per ADOT plans and direction.
The contractor will take into consideration the remote location of the construction site and limited resources available locally. This factor may require additional planning/costs to meet deadlines and agendas.
4. DELIVERABLES
All deliverables for the Stored Canopy not originally stored at the Ajo Border
Patrol Station prior to construction will be stored at the Highway 85 Checkpoint construction site.
All deliverables for the Ajo Station Canopy will be stored at the Ajo Station compound.
5. GENERAL REQUIREMENTS
a. All work shall be done in accordance with current ADOT standards, specifications, approved plans, and inspected by the Ajo Station Project Manager.
b. It is the contractor’s responsibility to obtain all licenses, permits, pay all charges, fees, taxes and give notices necessary and incidental to the lawful prosecution of the work.
c. The contractor will be responsible to ensure traffic is protected in accordance to
ADOT guidance and regulations.
d. Prior to final inspection by ADOT, all surplus material shall be removed from the right-of-way and the area shall be in a neat and natural state. Any existing equipment or structures damaged during permit work shall be repaired by the contractor.
e. The contractor shall be responsible to comply with all state law for underground or overhead facilities to include Blue Stake inspections prior to breaking ground.
The contractor assumes full responsibility for damage to any utilities to include fiber optic.
f. All work shall be conducted during daylight hours unless approved by ADOT.
g. The contractor will utilize appropriate engineering controls (e.g. water misting) to reduce dust and dust migration during construction as required by ADOT.
h. The contractor will ensure the use of appropriate personal protective equipment by all employees and subcontractors of the Contractor, for the job function being performed.
i. The contractor will maintain a clean and safe workplace. Daily cleanup is required. Contractor is responsible for providing and maintaining separate refuse collection for general trash and waste materials.
j. All contractor and subcontractors employed for this project must meet requirements set forth under the Davis-Bacon act regarding wages/salaries.
6. POINTS OF CONTACT (POCs)
The following lists the points of contact for this project.
Project Manager:
SBPA Doug Adkins
520-387-7002 ext. 2637 douglas.d.adkins@cbp.dhs.gov
SOS David Allen
520-387-7002 ext. 2626 david.allen1@dhs.gov
Contracting Specialist
Kirk Hunt
520-407-2811
Kirk.hunt@dhs.gov mailto:douglas.d.adkins@cbp.dhs.gov
Tucson Sector Facility Manager
Allen Quick
520-748-3092 scott.a.quick@cbp.dhs.gov
7. WORK SCHEDULE
a. Site preparation work will be performed from 7:00 a.m. to 4:00 p.m., Monday through Friday, with Federal holidays excluded. Work affecting traffic will be done in accordance with ADOT guidance.
b. The contractor shall notify the project manager, or authorized representative, in writing at least 48 hours in advance to request a deviation to the established work schedule. Requests to work weekends require a minimum one week notice.
c. A minimum of three rain days will be allowed with possible extensions dependent upon severity of weather.
8. WORK RESTRICTIONS
a. The Contractor shall use only designated areas for parking or storage of materials and/or equipment.
b. The Contractor will coordinate their work schedule in order to minimize impacts on Government personnel.
c. For safety and security purposes, all visitor or contracting personnel must submit the following information to David R. Allen (See SOW paragraph #6) at least 10 days prior to accessing the Sites:
Name: Last, First, Middle Initial
DL Number and State
DOB: MMDDYYYY (No dashes or slashes)
SSN
9. SITE VISIT
The contractor shall perform a site visit to determine actual conditions and details of the requirements prior to developing a work plan. The contractor will coordinate with the project manager to schedule the site visits.
10. LOCATION
Ajo Border Patrol Station - Stored canopy /Small canopy installation
850 North Highway 85 mailto:scott.a.quick@cbp.dhs.gov
Why, Arizona 85321
N 32°16'33.16"
W 112°44'26.04"
Highway 85 South Checkpoint (Job Site) Stored Canopy Installation
Highway 85, Mile Post 58
N 32°12'8.70"
W 112°45'32.97"
Pima County
Note: Distance from the Ajo Station to the Highway 85 South Checkpoint is approximately 5 miles.
References:
Attachment A: Highway 85 Construction Site Photographs
Attachment B: Highway 85 Checkpoint Canopy Location
Attachment C: Canopy to be removed from the Ajo Checkpoint and installed at the Ajo Station specifications/location
Attachment D: Re-purposed I-8 Canopy Specifications/Photographs
Attachment A: Highway 85 Checkpoint Construction Site
Attachment B: Highway 85 Checkpoint Canopy Installation Location
Red Outline – Current Canopy for removal (30’x48’)
Green Outline – Repurposed Canopy for erection (60’x80’) not to scale
The new canopy will maintain the same westerly spacing from the highway as the current canopy and offset to the east side.
The southern end of the new canopy will be moved south approximatley 10’ from the current canopy.
Attachment C: Canopy to be erected at the Ajo Station Length: 30’
Width: 48’
Anchor Type: Staked
Manufacturer: Big Top Fabric Structures
Canopy will be installed east of Building B in an unpaved area south of the parking lot.
Ajo Station Erection Site:
Attachment D: Re-purposed I-8 Canopy for Installation