RFP EXHIBIT A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HQ042319R0014_CONFORMED_DOCUMENT.pdf | ||
| ATTACHMENT_06,_INTERESTED_VENDORS'_QUESTIONS_AND_GOVERNMENT_RESPONSES.pdf | ||
| HQ042319R00140001_AMENDMENT.pdf | ||
| ATTACHMENT_01,_PWS_DATED_22_MARCH_2019.pdf | ||
| ATTACHMENT_04,_Instructions_to_Offerors_(FAR_52.212-1_Addendum_).pdf | ||
| ATTACHMENT_03,_DD254.pdf | ||
| HQ042319R0014.pdf | ||
| ATTACHMENT_02,_QASP.pdf | ||
| ATTACHMENT_05,_Evaluation_Factors_and_Evaluation_Methodology.pdf | ||
| ATTACHMENT_01,_PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER_ Interface Strategy Plan
D. SYSTEM/ITEM
TRAVEL PAY SYSTEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
INTERFACE STRATEGY PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
NA
5. CONTRACT REFERENCE
PWS 4.5.1
6. REQUIRING OFFICE
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
NA
9. DIST STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLOCK #16
| 14. |
| DISTRIBUTION |
a. ADDRESSEE
b. COPIES
8. APP CODE
SEE BLOCK #16
11. AS OF DATE
NA
13. DATE IF SUBSEQUENT SUBM.
NA
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8 - Approval is required
Block #12 - First draft due NLT 21 Days after award with weekly updates thereafter.
Final due NLT 2 months (60 calendar days) after the award; then as interfaces are developed and approved, no more than 1 month (30 calendar days) after the first exchange of data
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
| COR |
| 1 |
| 1 |
| PM |
| 1 |
| 1 |
| PCO |
| 1 |
| 1 |
15. TOTAL - - - - - - - - ->
G. PREPARED BY
CSD CONTRACT SPECIALIST (CS)
H. DATE
02/26/2019
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. | |||
| B. EXHIBIT | |||
| C. CATEGORY: | |||
| TDP | TM | OTHER_ Database Conversion Action Plan |
D. SYSTEM/ITEM
TRAVEL PAY SYSTEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
DATABASE CONVERSION ACTION PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
NA
5. CONTRACT REFERENCE
PWS 4.6.5.1, 5.3.2.
6. REQUIRING OFFICE
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
NA
9. DIST STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLOCK #16
14. DISTRIBUTION
b. COPIES
8. APP CODE
SEE BLOCK #16
11. AS OF DATE
NA
13. DATE IF SUBSEQUENT SUBM.
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8 - Approval is required
Block #12 - Deliver within 7 calendar days of notice
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
H. DATE
02/26/2019
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER_Internal Control Artifacts
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
INTERNAL CONTROL ARTIFACTS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
NA
5. CONTRACT REFERENCE
4.8.3 and 6.6
6. REQUIRING OFFICE
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
NA
9. DIST STATEMENT
D
10. FREQUENCY
SEE BLOCK #16
12. DATE OF FIRST SUBMISSION
SEE BLOCK #16
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE
SEE BLOCK #16
11. AS OF DATE
NA
13. DATE IF SUBSEQUENT SUBM.
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8 - Approval is required
Block #12 - Delivered NLT 7 calendar days after Governenet request (AR* = AS REQUESTED)
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
AR*
PM
AR*
PCO
AR*
15. TOTAL - - - - - - - - ->
G. PREPARED BY
H. DATE
02/26/2019
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_Reports
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
MULTIPLE REPORTS (SEE BLK # 16)
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 5.2, 6.1.5 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Multiple Reports: Test Discrepancy Report (TDR); Program Trouble Report (PTR); System Change Request (SCR); Incident report.
Block #12 – TDR: Deliver with each software release
PTR: Deliver with each software release
SCR: Deliver with each software release
Incident Report: Within 7 calendar days of the incident
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Software Release and Installation Programs (Version)
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
SOFTWARE RELEASE AND INSTALLATION PROGRAMS (VERSION)
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 5.2.5 and 5.1.1 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #12 - A copy is required, no later than 7 calendar days, once one or more changes is authorized and approved for release into production.
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Software Testing Documentation
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
SOFTEWARE TESTING DOCUMENTATION
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 5.4 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - With each software update and release
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Automated Computation Results
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
AUTOMATED COMPUTATION RESULTS
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 5.4.4 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 7 calendar days after error notification; with each software update and release
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCOT
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Database definitions and schemas
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
DATABASE DEFINITIONS AND SCHEMAS
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 5.7 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12: With each software update and release
Block #12The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCOT
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Functionality and Design Plan
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
FUNCTIONALITY AND DESIGN PLAN
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 6.4.1 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 2 months (60 calendar days) after the award; then as SCRs are implemented into the production environement, no more than 1 month (30 calendar days) are production release
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Configuration Design Plan
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
CONFIGURATION DESIGN PLAN
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 6.4.2 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 2 months (60 calendar days) after the award; then as SCRs are implemented into the production environement, no more than 1 month (30 calendar days) are production release
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Product Release Portfolio
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
PRODUCT RELEASE PORTFOLIO
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 6.4.3 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 10 days after the SCRs are finalized for the release
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Task Support Plan
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
TASK SUPPORT PLAN
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 6.4.4 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 10 days after the action is identified as a requirement
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Implementation Plan
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
IMPLEMENTATION PLAN
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 6.5.1 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 2 months (60 calendar days) after the award
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Quality Control Plan
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
QUALITY CONTROL PLAN
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 9.1 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - As changes occur throughout the life of the PWS
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Phase 1, A – Parallell Processing Documented Evidenance
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
PHASE 1, A- PARALLEL PROCESSING DOCUMENTED
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 9.3.1 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 10 calendar days after the parallel processing month
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_ Phase 1, B – Reconciled Auotmated to Manually Computed Vouchers (provide system-calculated vouchers)
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
PHASE 1, B – RECONCILED AUTOMATED TO MAUALLY COMPUTED VOUCHERS 9PROVIDE SYSTEM-CALCULATED VOUCHERS)
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 9.3.1 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Block #8: Approval is required
Block #12 - NLT 10 calendar ddays after the paralled processing month
Block #12 - The Government will have 5 business days to review the submittal, and if any corrections are required the contractor shall effect such and submit the revised document within 5 business days of notification of deficiency.The Government will review/approve the re-submittel document within 5 business days, unless the issues first identified are not adequately addressed therein.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: TDP |
TM
OTHER_Lifecycle Documents
D. SYSTEM/ITEM
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
PROGRAM LIFECYCLE DOCUMENTS (SEE BLK # 16)
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) NA |
| 5. CONTRACT REFERENCE PWS 5.7, 6.1.3, 6.3.3, 6.4.5, 6.4.6, 6.5 |
| 6. REQUIRING OFFICE |
TRAVEL PAY SYSTEM PROGRAM MANAGEMENT OFFICE
7. DD 250 REQ
LT
| 9. DIST STATEMENT D |
| 10. FREQUENCY SEE BLK #16 |
| 12. DATE OF FIRST SUBMISSION SEE BLK #16 |
| 14. |
| DISTRIBUTION |
b. COPIES
8. APP CODE BLOCK SEE BLK #16
| 11. AS OF DATE NA |
| 13. DATE IF SUBSEQUENT SUBM. NA |
final
| draft |
| reg |
| repr |
16. REMARKS
Program Lifecycle Documents: Database Changes; Rate; User Manuals; Per diem, mileage, lodging, dislocation allowance, and tax rate updates; Help screens; Training Materials; Screen shots; Data dictionary; How-to guides, best practices, and troubleshooting checklist; Articles and presentaitons, Monthly Progress Report; In Progress Review; Project Kick-Off Meeting Agenda; Project Kick-Off Meeting Minutes.
Block #8 - Approval is not required. However, the Governemnt will review submittal for accuracy and completeness.
Block #12 -
Database Changes: A copy is required, no later than 7 calendar days, once one or more changes is authorized and approved for release into production.
Rate: With each software update and release
User Manuals: With each software update and release
Per diem, mileage, lodging, dislocation allowance, and tax rate updates: Monthly or as updated by issuing federal agency
Help screens; Training Materials: With each software update and release
Screen shots: As requested
Data dictionary: With each software update and release
How-to guides, best practices, and troubleshooting checklist: With each software update and release
Articles and presentaitons: With each software update and release
Monthly Progress Report: NLT than 10 calendar days after the last day of the month
In Progress Review: As requested
Project Kick-Off Meeting Agenda: 1 workday before the schedule meeting
Project Kick-Off Meeting Minutes: NLT 7 calendar days following the meeting
Block #12 - The Government will have 5 business days to review each submittal.
NOTE: Contractor shall provide the submittal electronically as e-mail attachment, readable by Adobe PDF, Microsoft Word, PowerPoint or Excel (2013 or later).
COR
PM
PCO
CS
15. TOTAL - - - - - - - - ->
G. PREPARED BY
| H. DATE 02/26/2019 |
| I. APPROVED BY |
| J. DATE |