Section L

View the file

Other files for this federal contract opportunity

Other files attached to TEAMS BMD Systems Engineering, newest first.
File Type Posted
HQ0147-16-R-0009-0002.pdf PDF
HQ0147-16-R-0009-0002-Conform.pdf PDF
Attachment_L-09_Historical_Hours_10-18-16.pdf PDF
BMD_Systems_Engineering_Final_RFP_Amendment_2_QAs.pdf PDF
HQ0147-16-R-0009-0002-Conform.pdf PDF
HQ0147-16-R-0009-0002.pdf PDF
Attachment_L-09_Historical_Hrs_25Apr2016_.pdf PDF
BMD_Systems_Engineering_Final_RFP_Amendment_2_QAs.pdf PDF
BMD_Systems_Engineering_Final_RFP_Amendment_2_QAs.pdf PDF
HQ0147-16-R-0009-0002.pdf PDF
L-07_Historical_Hrs_25Apr2016_.pdf PDF
HQ0147-16-R-0009-0002-Conform.pdf PDF
Attachment_L-01_Past_Performance_Information_(PPI)_Rev_1.pdf PDF
Response_TEAMS_BMD_SE_Final_RFP_QA_(October_3 _2016).pdf PDF
HQ0147-16-R-0009-0001-Amendment.pdf PDF
Attachment_J-01a__BMD_Systems_Engineering_Bid-To_2016-09-22.pdf PDF
Section_M_BMD_Systems_Engineering_Amend_01__10_-7-16.pdf PDF
Attachment_L-07_TEAMS_BMD_Systems_Engineering_Excel_Pricing_Workbook_(10-3-16).xlsx XLSX spreadsheet
Attachment_L-09_Historical_Hours_10-03-16.pdf PDF
Section_L_BMD_Systems_Engineering_Amend_01_10-4-16.pdf PDF
HQ0147-16-R-0009-0001-Conform.pdf PDF
Attachment_J-01_-_BMD_Systems_Engineering_PWS_2016-10-03_(track_changes).pdf PDF
Attachment_L-11_Bidders'_Library_Request_Form_9-22-16.pdf PDF
J_Attachments.zip ZIP file
Section_M_BMD_Systems_Engineering.pdf PDF
HQ0147-16-R-0009.pdf PDF
Section_L_BMD_Systems_Engineering.pdf PDF
BMD_Sys_Eng_presolicitation_notice.pdf PDF
L_Attachments.zip ZIP file
BMD_Systems_Engineering_Final_RFP_Q As.xlsx XLSX spreadsheet
BMD_Systems_Engineering_QA_Responses_-_Final_1_Aug_16.pdf PDF
Section_J_Attachments.zip ZIP file
HQ0147-16-R-0009_-_Draft_RFP_BMD_Systems_Engineering.pdf PDF
Section_L_Attachments.zip ZIP file
Section_M_BMDS_Systems_Engineering_6.28.16.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEAMS BMD Systems Engineering

HQ0147-16-R-0009

Section L: Instructions, Conditions, and Notices to Offerors

L-1.0 GENERAL INSTRUCTIONS TO OFFERORS

L-1.1 The proposal instructions in this section are designed to assist offerors in preparing a complete response that reflects a full understanding of the approach proposed to accomplish all contractual requirements. Section M details how proposals will be evaluated.

L-1.2 Offerors are expected to comply with all requirements of the Request for Proposal (RFP).

Throughout this solicitation (with the exception of section L-13.0 and section M-101), “Major

Subcontractors” are defined as a subcontractor whose proposed effort provides at least 10% of the proposed total price of the contract and/or a subcontractor that performs a critical function in the performance of the resulting contract, whether it is technical or financial, and/or have important roles in any high or medium risk areas identified in the offeror’s proposal. Team Members are the entities that make up a joint venture or any other partnership or teaming arrangement that is formed for the purpose of responding to this solicitation. All forms of joint ventures are acceptable for

TEAMS. Industry should review FAR subpart 9.6, FAR part 19, and 13 CFR part 121 for information on joint ventures. The responsibility for ensuring that any joint venture meets the

Small Business Administration (SBA) requirements to be classified as a Small Business rest with the offeror. Teaming agreements should be provided with a joint venturer’s proposal.

L-1.3 The Procuring Contracting Officer (PCO) is the sole point of contact for this acquisition.

Address any questions or concerns you may have to the PCO. Written requests for exchanges of information may be sent to the PCO via email. Email is the preferred method for exchanges of information. The PCO for this acquisition is as follows:

Mr. Jeffrey McMillan

MISSILE DEFENSE AGENCY (MDA)

CONTRACTS DIRECTORATE - MDA/DACM

5222 Martin Road

Redstone Arsenal, AL 35898-0001

(256) 450-3431

Email: Jeffrey.mcmillan@mda.mil

L-1.4 Non-Governmental personnel from the contractor identified below will be utilized to manage the Isolated Local Area Network (ISOLAN) during source selection.

LinTech Global, Inc.

31600 W 13 Mile Rd, Ste 122

Farmington Hills, MI 48334-1407

All contractor personnel have signed non-disclosure agreements. If you object to the disclosure of your submittals to non-Government personnel, you must provide your written objections to the contracting officer within 10 days of RFP issuance. If you object to disclosure of a portion of your proposal, provide your consent for the remainder of the proposal to the contracting officer within the same timeframe.

The Cost and Price Volume instructions at L-13.0 utilize the term “Major Subcontractor” to identify the offeror’s team members that comprise 10% or more of the total proposed hours vice 10% of the total cost/price; “Minor

Subcontractors” are those team members that comprise less than 10% of the total proposed hours.

mailto:Jeffrey.mcmillan@mda.mil

L-1.5 Notice Regarding Organizational Conflict of Interest (OCI) – Determination to Participate in This Acquisition (JAN 2015)

a. The acquisition of advisory and assistance services under this solicitation may create actual or potential conflicts of interest for offerors and their prospective subcontractors.

In assessing and addressing conflicts of interest, MDA will follow the guidance in FAR subpart 9.5. Offerors are responsible for ensuring that both they and their proposed subcontractors are not restricted from participating in any acquisition under the TEAMS areas due to an OCI caused by any MDA-funded contract or subcontract; Ballistic

Missile Defense System (BMDS)-related contract or subcontract; or, other significant, non-BMDS related business relationships with firms doing business with or in support of MDA.

b. MDA has developed an OCI memorandum with respect to the acquisition of advisory and assistance services (see Attachment 12 to Section L). This solicitation also includes a clause in Section H that establishes restrictions and obligations to prevent and resolve

OCIs.

c. Certain capability areas under TEAMS contracts present heightened concern to the

Government with respect to OCI. These contracts are outlined in the TEAMS OCI

Memorandum Attachment to this RFP. Offerors shall consider these areas carefully and fully evaluate potential OCIs. The Government will analyze potential OCIs within these and other areas of concern on a case-by-case basis.

d. Procedures To Follow Before Submission of Proposals:

1) Offerors should carefully review the respective MDA and TEAMS OCI

Memorandum and OCI clause to ensure their proposals and teaming arrangements are consistent with MDA’S and TEAMS’ OCI Memorandum. Questions and clarifications regarding the policy should be provided to the contracting officer. The contracting officer will meet with offerors on a one-on-one basis, if requested and as necessary, to discuss individual offeror or team arrangements concerning MDA’s

OCI policy.

2) Offerors are encouraged to submit the completed OCI Disclosure Form and supporting documentation before the proposal due dates as PDF documents via electronic mail to TEAMS_OCI@mda.mil. This submission will not count against any proposal page limitation. Based on MDA’s review of the submitted documentation, the contracting officer will provide preliminary, written advisory approval to participate in this acquisition. This advisory approval will not be binding on MDA. If the form and supporting documentation are not submitted earlier, they must be included as part of the offeror’s proposal submission.

3) The submission shall also identify all actual or potential conflicts of interest that might occur under the TEAMS areas, and shall specify in adequate detail for the

Government’s evaluation, the nature of the conflict and the measures the contractor has taken or proposes to take to avoid, mitigate, or neutralize (hereafter referred to as “mitigate”) such conflicts.

mailto:TEAMS_OCI@mda.mil

e. Procedures to Follow With Proposal Submission:

1) Each offeror must submit, for itself and its subcontractors, an "OCI Disclosure

Form" (dated Jan 2015), Attachment L-05, and applicable supporting documents.

The submission shall identify all of the team's MDA-funded contracts or subcontracts; BMDS-related contracts or subcontracts; and, any significant, non-

BMDS related business relationships with firms doing business with or in support of

MDA. For each identified contract, the offeror shall disclose the contract number;

name, and telephone number of the contracting officer; a description of the work performed or being performed; and, such additional information as the contracting officer may request to assist in the identification of actual or potential OCIs. An offeror which has already submitted the OCI Disclosure Form(s) to the contracting officer and received an OCI advisory letter does not have to re-submit the forms with its proposal. If changes have been made, the offeror must submit the changes with its proposal.

2) An offeror’s failure to provide adequate information to avoid or mitigate an OCI may cause its proposal to be rejected and relieves the Government of any further responsibility to resolve OCI issues. See FAR 9.504(e). Notices to offerors of OCIs and their responses thereto are not negotiations or discussions as those terms are used in FAR 15.306(d).

3) The offeror must submit a Mitigation Plan that addresses all conflicts in adequate detail for the contracting officer to determine whether an OCI exists or has been mitigated. If an offeror determines that an actual or potential OCI does not exist, it shall include a statement to that effect as part of its proposal, and does not need to submit an OCI Mitigation Plan with its proposal. However, to facilitate resolution of OCIs during contract evaluations, offerors are encouraged to submit an OCI

Mitigation Plan with their proposals. The OCI Mitigation Plan shall specifically address the OCI disclosures required in this section and explain how the prime is in full compliance with the agency's OCI policy. As part of its Mitigation Plan, the offeror must identify which contracts or subcontracts it will continue to support and those it intends to terminate or allow to lapse to eliminate any conflicts. The plan shall also address other OCI resolution and mitigation measures to include the divestment of business units. The OCI Mitigation Plan will be reviewed in conjunction with the PCO’s Responsibility Determination prior to award.

f. MDA Engineering Team – Industry (MET-I) (formerly MDA National Team (MDNT))

Participation: Based on the relevant MET-I confidentiality documents and FAR subpart

9.5:

1) MET-I Participants will be restricted from all TEAMS pre-contract award activity, including, but not limited to, marketing activities, Independent Research and

Development (IR&D) planning in support of TEAMS, bid/no-bid decisions, and proposal preparation activities - including red-team participation.

2) After award of a TEAMS contract, MET-I Participants may work for a TEAMS contract awardee, including direct or indirect involvement with any subsequently competed TEAMS contracts, so long as they are not continuing to also work as a

MET-I Participant. Former MET-I Participants have a continuing duty to protect proprietary information acquired under the MET-I program and to refrain from any non-MET-I use of such information without permission of the owner.

3) The term "MET-I Participant" means those individuals who are assigned by their

MET-I employer to work on the MET-I and, by reason of this assignment, will have access to the Proprietary Information of others or information that could provide its employer an unfair competitive advantage.

g. The contracting officer shall review and determine whether each offeror selected for award has addressed and resolved all OCIs in its OCI Mitigation Plans before making an award. If an OCI is not adequately addressed or mitigated, the contracting officer reserves the right to notify the contractor, as is, and allow the contractor a reasonable opportunity to respond before making an award decision. The contracting officer reserves the right to reject offers from contractors which do not adequately resolve all

OCIs or are inconsistent with the agency’s OCI policy. The contracting officer also reserves the right to obtain an OCI waiver and make an award when in the best interests of the United States.

L-2.0 SOURCE SELECTION METHODOLOGY

L-2.1 Competitive, Best Value Source Selection

The Government intends to award a single full and open contract. The contract will consist of cost plus fixed fee (CPFF) Contract Line Item Numbers (CLINs). The contract will have a base period of two (2) years with three (3) one-year options.

L-2.2 Offeror’s Best Terms

The Government may award without discussions, however, reserves the right to enter into discussions. Therefore, the offeror’s initial proposal shall contain the offeror’s best terms for

Security, Small Business, Transition, Past Performance, Technical, Management, and Cost and

Price. If the Government contemplates award without discussions, the offerors may be given the opportunity IAW FAR 15.306 to clarify certain aspects of their proposals (e.g., the relevance of an offeror’s past performance information and adverse past performance information to which the offeror has not previously had an opportunity to respond) or to resolve minor or clerical errors.

L-2.3 Competitive Range

If discussions are to be conducted, the PCO will establish a competitive range (as set forth in FAR

15.306(c)) based on the ratings of each proposal against all evaluation criteria. If the PCO determines that an offeror’s proposal should not be included in the competitive range, the proposal will be eliminated from consideration for award and written notice of the decision will be provided to the unsuccessful offeror in accordance with FAR subpart 15.503.

If the PCO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the PCO may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

L-2.4 Final Proposal Revisions

If discussions are deemed necessary with offeror(s), upon completion of those discussions, the

PCO will request that the offeror provide a Final Proposal Revision (FPR). Revisions to any volume(s) shall be submitted by providing two hard copies, one “clean” copy, and one with “track changes”. Matching DVD-R copies shall also be submitted.

The offeror is advised that any changes to the proposal in the FPR shall be fully addressed and/or explained and reflected in the proposed price. Failure to comply with this requirement can adversely influence the evaluation of the proposal. The PCO will establish a common due date and time for submission of the FPR.

When final proposal revisions are requested, any revisions or non-compliance with contract terms and conditions submitted in the final proposal revision may not be subject to further discussion or negotiation and may render the offer unacceptable to the Government. This provision is not intended to restrict the offeror’s opportunity to revise figures, e.g., prices, discounts, or percentage rates. Rather, it is intended to preclude any misunderstandings by the Government that could result if new or revised terms and conditions submitted in the final proposal revision have not been fully disclosed, discussed, and understood during discussions or negotiations. Hence, such new or revised terms and conditions are not solicited and, if submitted in the final proposal revision, may render the offer unacceptable to the Government.

L-2.5 Pre/Post Award Debriefing

Pre/Post award debriefings will be conducted IAW FAR 15.505 and 15.506, respectively.

L-2.6 Errors/Omissions

If an offeror believes that the requirements in these instructions contain an error, omission, ambiguities, or are otherwise unsound, the offeror shall immediately notify the PCO in writing with supporting rationale no later than five (5) business days after release of this solicitation.

L-2.7 Mistakes

Mistakes in an offeror’s proposal discovered after award shall be handled IAW FAR 14.407-4 as referenced in FAR 15.508.

L-2.8 Evaluation Notices (ENs)

The Government may need to conduct written exchanges with offerors which will be in the form of an Evaluation Notice (EN). Page format and limitations will be placed on responses to ENs in the event they are issued. The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors. ENs may be sent electronically (i.e., via e-mail) at the discretion of the contracting officer. The EN will request an e-mail or a hardcopy response. If a hardcopy response is requested, the EN responses shall be submitted on a light colored paper to distinguish between the original and clarifications. Specific paper color requirement will be identified in the EN instruction(s).

L-2.9 Request for Proposal (RFP) Revisions/Amendments

The Government reserves the right to revise or amend any portion of this solicitation. Such revisions or amendments will be available on the FedBizOpps website at https://www.fbo.gov/ using Standard Form (SF) 33. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to FedBizOpps. If such amendments require material changes, the proposal due date may be extended at the discretion of the PCO and by enough days to enable an offeror to revise its proposal. In such cases, the amendment will include an announcement of the new proposal due date and time. The offeror shall provide acknowledgement in Block 14 of the SF 33 of any solicitation amendments issued by the

Government.

L-2.10 Bidders’ Documents Library

The Bidders’ Documents are representative products and reference documents provided to assist in development of offerors’ proposals. The documents will be made available for review in a

Bidders’ Library located in MDA’s Von Braun IV facility, Redstone Arsenal, AL. Requests for access to the Bidders’ Documents Library shall be submitted utilizing the instructions at

Attachment L-11.

The Government, while trying to ensure document applicability and currency, does not warrant the accuracy or compliance of the information contained in the Bidders’ Documents Library. All documents are subject to revision and changes without further notice.

In addition to the Bidders’ Documents Library information, Attachment L-09 provides program information for the BMD Systems Engineering requirement to help industry prepare their offers.

This information includes cumulative past and potential execution requirements by stakeholder.

This information was compiled based on work similar in scope to that contained in this Request for

Proposal. Bidders are cautioned that this information is provided to assist offerors in preparing their proposal and should not be used as the sole basis for proposing the effort required to accomplish the requirements of this solicitation.

L-2.11 Contracting Officer’s Responsibility Determination

Prior to awarding a contract, the contracting officer must perform a responsibility determination for the selected contractor. The standards of contractor responsibility and the requirement for the

Contracting Officer to make and document a responsibility determination are set forth in FAR

9.104 and 9.105. To be determined responsible, a prospective contractor must:

Have adequate financial resources to perform the contract, or the ability to obtain them.

Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.

Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history, except as provided in FAR 9.104-2.

Have a satisfactory record of integrity and business ethics.

Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety precautions applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).

https://www.fbo.gov/

Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

L-3.0 PROPOSAL CONTENT

L-3.1 Proposal Acceptability

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors to be eligible for award. By submission of its offer, the offeror consents and agrees to all solicitation requirements and identified constraints. Non-conformance with the instructions provided may result in an unfavorable proposal evaluation, or rejection of an offeror’s proposal, rendering it ineligible for award.

L-3.2 The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation by the Government and for substantiating the validity of stated claims. The proposal shall not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet the areas to be evaluated.

Offerors shall assume that the Government has no prior knowledge of their experience and will base its evaluation on the information presented in the offeror's proposal. The offeror’s proposal shall demonstrate that the offeror possesses the technical expertise, management experience, and successful record of past performance to perform all requirements of the PWS. Offerors are permitted to submit a maximum of two proposals. Each proposal shall be separate, discretely priced, and fully compliant with all stated terms, conditions, and performance requirements set forth in this solicitation. Page limits and all other proposal preparation instructions in this RFP apply to each separate proposal. The submission of more than one proposal is simply an opportunity to propose differing technical and/or management solutions to accomplish the PWS requirements. However, these are not considered Alternate Proposals. Alternate proposals – defined herein as proposals that deviate in any way from the solicitation terms and conditions and/or the stated performance requirement – will not be considered.

Contingent proposals are not allowed, nor will they be accepted, considered or evaluated by the

Government. Contingent proposals are defined herein as proposals that include terms or conditions that imply that performance is contingent upon any sort of provisioning from the Government that is not set forth in the RFP.

The offeror’s proposal shall include all of the information requested and shall comply fully with these Section L instructions. Failure to do so may cause the offeror's proposal to be eliminated from consideration for award. Offerors are reminded to properly mark their proposal documents which contain proprietary or restricted information.

NOTE: IF THE PROPOSAL IS NOT RECEIVED BY THE DUE DATE/TIME SPECIFIED, THE

OFFEROR’S PROPOSAL IS CONSIDERED LATE IN ACCORDANCE WITH FAR 52.215-1.

L-3.3 Offerors are advised that the Government may incorporate into the final contract enhancing features included in the offeror’s proposal deemed beneficial to the Government. With the exception of the Cost and Price Volume and the Small Business Volume, no cost or pricing information should appear in any other volume. The Government advises offerors that taking exception to or deviating from any term or condition of the RFP may make an offer unacceptable and the offeror ineligible for award.

L-3.4 All offerors’ proposal(s) shall be valid at least 180 days after the RFP closing date. The offeror shall make a clear statement in the Executive Summary that the proposal is valid until the applicable date as referenced above and in the RFP.

L-4.0 PROPOSAL ORGANIZATION

L-4.1 In presenting material in the proposal, the offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. It is the responsibility of the offeror to present enough information to allow the various technical and management approaches, as well as price, to be meaningfully evaluated without discussions. The offeror must include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions to problems. Unnecessarily elaborate brochures or other presentation materials beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.

L-4.2 The offeror shall prepare the proposal as set forth in the Proposal Organization Table L-1 below. The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies as specified in Table L-1. The volumes identified in the table should be separately bound in three-ring, loose-leaf binders, as necessary; Volumes III, IV, and V may be combined (but separately tabbed) in a single binder for convenience. The contents of each proposal volume are described in the Proposal Organization paragraphs as noted in the table below.

L-4.3 Each proposal volume shall be unclassified. Each volume shall be written in Standard

English and be complete in and of itself.

The offeror shall provide a Proposal Cross Reference Matrix as set forth in Table L-2. This proposal matrix is only a tool to assist in the proposal evaluation process.

L-4.4 Table L-1 shall serve as the offeror’s guide for proposal organization and content by volume.

Table L-1: Proposal Organization and Content

Volume Title

# of Hard

Copies

# of

Electronic

Copies *

Max # of

Pages **

Volume I – Contract Documentation Original Plus 1 2 No Limit

Tab 1: Master Table of Contents No Limit

Tab 2: Model Contract Tab 3: Solicitation Exceptions Matrix

Tab 4: Ground Rules and Assumptions

Tab 5: OCI Mitigation Plan***

Volume II – Executive Summary Original Plus 3 2

Tab 1: Executive Summary Content 10

Tab 2: Proposal Cross Reference Matrix No Limit

Volume III – Security Plan Original Plus 1 2 10

Volume IV – Small Business Original Plus 1 2 10

Volume V – Transition Plan Original Plus 1 2 10

Volume VI – Past Performance Original plus 3 2

Tab 1: List of subs and Joint Ventures (JVs) No Limit

Tab 2: Organizational Structure Change History 5

Tab 3: Past Performance Information (PPI) 25

Tab 4: Past Performance Questionnaire No Limit

Tab 5: L-03 Consent Letter No Limit

Tab 6: L-04 Client Authorization Letter No Limit

Volume VII - Technical Original Plus 3 2

Tab 1: Technical Expertise/Approach 30

Tab 2: Technical Staffing Approach 10

Tab 3: Resumes 3 per person

Volume VIII - Management Original Plus 3 2

Tab 1: Management Approach 20

Volume IX – Cost and Price Original Plus 1 2 No Limit

* SUBMIT EACH VOLUME ON A SEPARATE DVD-R.

** Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. These limitations shall apply to both electronic and hard copy proposals.

Each page shall be counted except the following:

1. Volume Cover Pages

2. Table of Contents

3. List of Tables and Figures

4. Glossaries / Acronym List

5. Tabs / Dividers

6. Blank pages

*** OCI Mitigation Plan will not be evaluated, but must be submitted with the proposal, except as specified in L-1.5e.

See L-1.5 for further instructions.

L-4.5 Page size shall be 8.5 x 11 inches, not including foldouts. Except for the reproduced sections of the solicitation document and any non-narrative sections (e.g., tables, graphs, charts, figures, etc.), the text size shall be no less than Microsoft Word Times New Roman 12 point font, single-spaced. Use at least 1-inch margins on the top and bottom and 1-inch side margins. Pages shall be numbered sequentially by volume. In the event the offeror creates an ambiguity, the

Government may exercise its own discretion in counting pages. If the page count is exceeded, the excess pages will not be read or considered in the evaluation of the proposal. These limitations shall apply to both electronic and hard copy proposals. Special considerations will not be given for colors, pictures or unnecessary graphics. Other than the electronic media solicited, audio and video recordings, or any other electronic media (i.e., CD & tape) will not be accepted.

L-4.6 The Government may need to conduct exchanges with offerors which will be in the form of an EN. The PCO has the authority to release ENs and provide any clarifications to industry after the legal advisor and SSEB Chairperson have reviewed the ENs or clarification content. Page format and specified page limits for EN responses will be identified in the letters forwarding the

ENs to the offerors. ENs may be sent electronically (i.e., via email) at the discretion of the

Government. The EN will request an email or a hardcopy response, and offerors must submit their responses by the time and date specified in the letter. If a hard copy is requested, the EN response shall not be submitted on standard white bond paper. If a hard copy response is requested, the EN responses shall be submitted on a light colored paper to distinguish between the original and clarifications.

L-4.7 Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics.

Foldout pages may not be used for pages of text. Legible tables, charts, graphs, diagrams, schematics and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible and shall not exceed 11 x 17 inches in size. Each printed side of a foldout will count as two pages. For tables, charts, graphs and figures, the font shall be no smaller than 10 point. All information (except documentation numbers, classification markings, and page numbers) shall be contained within an image area of 9 x 15 inches. Foldout pages shall fold so that the Government can read and evaluate them without removal from proposal binder. Foldout pages shall fold entirely within the volume.

L-4.8 Each volume shall contain a glossary of all abbreviations and acronyms used for the entire proposal, with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

L-4.9 Each volume shall contain detailed table of contents to delineate the subparagraphs within that volume. A Master Table of Contents, contained in Volume I, shall contain a consolidation of the individual Table of Contents for all Volumes (I through IX). See L-5.1.

L-4.10 Tab indexing shall be used to identify sections within each Volume. The offeror shall index the sections identified in the Volume Organization outlined in each Volume. Tabs do not count against the page limitations for their respective Volumes.

L-4.11 Tables and figures can be used to illustrate quantitative or qualitative data. Tables and figures are not required. If provided, each volume shall contain a list of all tables and figures within that volume. The List of Tables and Figures will not count against the page limitations for their respective volumes. Tables, graphs, charts, and figures are considered non-narrative sections of the proposal and are only to be provided to enhance the proposal narrative. If, at the PCO’s discretion, an excessive amount of narrative is included in a table, chart, graphic, or illustration in an effort to subvert the proposal’s page limitations, the text may be severed from the non-narrative section and included in the page count of the narrative section of the proposal.

L-4.12 Each volume shall be written on a stand-alone basis so that its contents may be evaluated without cross-referencing to other volumes of the proposal. Each response to each subfactor shall be self-contained.

L-4.13 All copies (original unbound, hard copy and electronic copy) of an offeror’s proposal must be submitted together in accordance with the scheduled submission date for the particular volumes.

All Prime and team member information must be incorporated into one coherent submittal. Be sure to identify appropriate markings such as the legend at FAR 52.215-1(e), Restriction on disclosure and use of data.

L-4.14 One hardcopy of each volume shall be clearly identified as “original”. The “original” shall be formatted as follows:

1. Clearly marked as “Original”

2. Unbound

3. Printed on both sides, long edge (Note: pages should be printed in order to flip pages left to right)

4. Each volume, except for the Cost Volume, shall have a cover sheet, clearly marked as volume number, “ORIGINAL”, offeror’s name, solicitation title, and solicitation number

5. The Cost Volume foldout pages shall fold entirely within the volume so that the pages fit within a 8 x 11 ½ inch area.

L-4.15 Each hard copy volume of the proposal, with the exception of the original, should be separately bound in a three-ring loose-leaf binder, which shall permit the volume to lie flat when open. Staples shall not be used. A cover sheet should be bound in each book, clearly marked with volume number, copy number, offeror’s name, solicitation title, and solicitation number.

L-4.16 A label should be placed in the spine of each binder clearly identifying the solicitation number, volume number and name, copy number, and offeror’s name.

L-4.17 Complete electronic volumes shall be submitted in Microsoft Office 2007 or compatible format. Offerors are permitted to submit documents such as signed letters (i.e., OCI, Consent and

Client Authorization Letters), ORCA and embedded graphics (if applicable) in .pdf format, with the exception of pricing. Pricing spreadsheets (Excel Price Workbook (EPW)) should be submitted using MS Excel 2007 or compatible. If files contain links, the links must be intact and maintained through all revisions. Electronic copies will not be password protected. All electronic copies shall be submitted on DVD-R in a protective sleeve. The DVD-R and protective sleeve shall be clearly marked as to volume number, offeror’s name, solicitation title, and solicitation number. Electronic file directory titles and organization shall reflect the titles and organization of these instructions.

Each directory shall contain a Microsoft Word file with the Master Table of Contents for that directory. Offerors shall ensure electronic copies on DVD-R are virus free. Offerors who do not provide an electronic EPW (Attachment L-07) and/or Pricing Volume Narrative (Section L-14.5) will be eliminated from consideration for award. Offerors who do not provide a “complete” electronic EPW (Attachment L-07) and/or Pricing Volume Narrative (Section L-14.5) (after discussions, if discussions are held) will be removed from consideration for award. A “complete”

EPW is defined as an EPW that matches hard copy proposals and contains, at a minimum, completion of all the fields in the EPW format provided with the RFP.

L-4.18 The MS Office copies of the proposal shall be an exact duplicate of the “original” paper proposal. The DVD-Rs will also be used for proposal evaluation. The Government will not perform a word-by-word check of the “original” vs. the .doc and .xls versions. If discrepancies are identified between the electronic proposal and the “original” paper proposal, the paper proposal shall prevail.

L-4.19 Sound or video files shall not be embedded into the proposal files.

L-4.20 All proposals shall be submitted to the following address:

MISSILE DEFENSE AGENCY (MDA)

ATTN: Mr. Jeffrey McMillan, MDA/DACM

MDA Source Selection Facility

5222 Martin Road

Redstone Arsenal, AL 35898-0001

L-5.0 VOLUME I: CONTRACT DOCUMENTATION

L-5.1 The offeror shall include a master table of contents of the entire proposal (include in

Contract Documentation only). See L-4.9.

L-5.2 Model Contract (SF33)

The offeror shall provide a complete copy of this RFP (including Sections L and M, less other attachments, with any amendments) with the original signature of an official authorized to contractually bind the offeror in Block 17 of the SF 33. The offeror must complete the following sections within the RFP:

Section A (SF 33, Blocks 13 through 18)

Section B

Offerors will populate the estimated cost and fixed fee values for CPFF CLINs.

Section K, Representations, Certifications and other Statements of Offeror

Offerors will complete representations, certifications, acknowledgments and statements via the System for Award Management at https://www.sam.gov. A hardcopy shall be included in the Contract Documentation volume. Any additional Section K information shall also be included in this section.

L-5.3 Solicitation Exceptions Matrix

The offeror is required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements. The offeror must clearly identify any exceptions to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall refer to a paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation to document http://www.sam.gov/ any exceptions to, or deviations from, any of the clauses or special contract requirements along with justification.

L-5.4 Ground Rules and Assumptions

The offeror must clearly identify any ground rules and assumptions made in preparing the proposal.

L-5.5 OCI Mitigation Plan

The offeror must submit an OCI Mitigation Plan as detailed in paragraph 1.5 (e).

L-6.0 VOLUME II: EXECUTIVE SUMMARY

L-6.1 Executive Summary Content: The Executive Summary shall include company information and a summary of the offeror’s proposal. This portion may be utilized by the evaluation team to support its evaluation of each factor. However, any summary material presented here shall not be considered as meeting the solicitation requirements for any portions of other volumes of the proposal.

Company Information: The offeror shall provide the Company/Division Address, Identifying Codes, and Applicable Designations, company/division's street address, county and facility code, CAGE code, DUNS code, and size of business (large or small). The offeror shall also provide the mailing address, telephone and fax numbers and facility codes for the cognizant Contract Administration Office, Defense Contract Audit Agency (DCAA), and Government Paying Office including the name, telephone and fax number for the

Administrative Contracting Officer (ACO). The offeror shall provide a single point of contact and one alternate for all matters dealing with their proposal including name, position title, address, phone, fax number and email address. In addition, the offeror shall provide the name and contact information for their Facility Security Officer that is responsible for managing the offeror’s facility and personnel clearance actions.

Proposal Summary: The offeror shall provide a top-level summary of their proposal suitable for describing their approach to Agency senior leadership.

L-6.2 Proposal Cross Reference Matrix: The offeror shall provide a matrix using the format below (Table L-2) to cross reference their proposal to, at a minimum, the PWS and Sections L and

M. The offeror’s proposal paragraph number and format shall mirror Sections L and M paragraph numbering to the maximum extent practicable. The offeror may populate and include additional columns as it sees fit to accommodate a more efficient evaluation. This is only a tool to assist in the proposal process and is provided for informational purposes only. The contractor is ultimately responsible for ensuring all areas are fully addressed and all requested information is completed and turned in appropriately IAW Section L of the RFP.

TABLE L-2: Proposal Cross Reference Matrix Format

PWS Paragraph Section L Section M Offeror’s Proposal Paragraph Reference

XX.X L-XX.X M-XX.X XX.X

L-7.0 VOLUME III: SECURITY PLAN

The offeror shall describe its approach for the following areas:

a. Obtaining appropriate facility and personnel security clearances.

b. Processes for safeguarding classified materials (to include handling, storage, and transmission) in accordance with the requirements of the DD Form 254.

c. Processes for safeguarding Controlled Unclassified Information (CUI) (to include handling, storage, and transmission).

d. Providing cleared personnel upon completion of the contract transition period and throughout contract performance, including short-notice change orders.

The Security Plan shall identify by name, the Facility Security Officer that is responsible for managing the offeror’s facility and personnel clearance actions.

Failure to adequately address all four aspects of an offeror’s Security Plan may result in an

“Unacceptable” rating. Offerors that receive an “Unacceptable” rating for Security Plan (after discussions, if discussions are held) will be removed from consideration for award.

L-8.0 VOLUME IV: SMALL BUSINESS

L-8.1 Small Business Subcontracting Plan (Large Business Offerors Only): The offeror shall submit a Small Business Subcontracting Plan in accordance with FAR 52.219-9 including information required in paragraphs (d) (1) through (d) (11) of that clause. The Contracting Officer must determine the Small Business Subcontracting Plan to be acceptable in order for the offeror to be eligible for contract award.

For the purpose of paragraph (d) (1) of FAR 52.219-9, propose the following percentages as a minimum:

Small Business subcontracts: 40%

Veteran Owned Small Business subcontracts: 3.0%

Service Disabled Veteran Owned Small Business subcontracts: 3.0%

HUBZone Small Business subcontracts: 3.0%

Small Disadvantaged Business subcontracts: 5.0%

Women Owned Small Business subcontracts: 5.0%

Note: The above small business subcontract percentages are expressed as a percentage of total subcontracting dollars. Offerors are encouraged to propose percentages greater than those listed, but must propose no less than the minimum Small Business subcontract percentage of 40% in order to receive an acceptable rating.

Socio-Economic Percentages Only: In order to receive an acceptable rating for socio-economic percentages, the offeror must meet or exceed the minimum percentages stated above for at least 3 of the 5 socio-economic categories, and, if applicable, provide a justification why the offeror is proposing lower than the minimum percentages. At a minimum, such justification must include efforts associated with locating small businesses in the applicable category and rationale why sufficient small businesses who meet the requirement could not be located.

In addition to the requirements outlined in FAR 52.219-9, the Small Business Subcontracting Plan shall include the following:

a. A statement that block 15 of the Individual Subcontract Report and Summary Subcontract Report will contain the email addresses of both the Procuring Contracting

Officer and the MDA Office of Small Business Programs (subcontracting-oversight@mda.mil).

b. A description of the process the prime offeror will use to ensure timely and accurate small business subcontract reporting in the Electronic Subcontracting Reporting System

(eSRS) for all tiers of subcontracting in accordance with FAR 52.219-9. A description of the methodology used to ensure that the flow-down requirements of the eSRS are met.

c. Information specified below segregated by base period and each option period:

1) Subcontractor name, type of business, product/service to be performed, dollar value, timeframe, and nature of commitment the small business participation planned for this acquisition for the following: (Small Business, Veteran Owned Small Business, Service Disabled Veteran Owned Small Business, HUBZone Small Business, Small

Disadvantaged Business, and Women Owned Small Business.) The contractor shall clearly describe the nature of commitment (e.g., fully executed teaming agreement, planned purchase order, etc.).

d. A narrative explanation regarding the basis for and efforts associated with establishing proposed percentages, to include initiatives and tools that will be employed under the contract to enhance small business participation.

The successful offeror’s Small Business Subcontracting Plan will be incorporated into the contract at contract award.

L-8.2 Small Business Participation Plan: In order to gather data to assess the contractor’s small business participation in accordance with FAR 52.219-8, the contractor shall develop and submit a

Small Business Participation Plan. The Small Business Participation Plan is separate from the FAR requirement for a Small Business Subcontracting Plan. The contractor shall ensure that Small

Business Subcontracting Plan submissions are consistent with the Small Business Participation

Plan information. This Small Business Participation Plan shall reference the portion of the Small

Business Subcontracting Plan that provides specific details of how the contractor will utilize small business participation at the first tier subcontract level throughout the period of performance of the contract plus options. The Small Business Participation Plan shall provide information specified below segregated by base period and each option period:

Percentage and total cost of subcontract small business participation expressed in terms of total contract value for all small business subcontracts. (The Small Business Participation

Plan proposed subcontract dollars and percentages shall be consistent with the Small Business

Subcontracting Plan dollars and percentages. Note that the Small Business Participation Plan is expressed in terms of total contract value and the Small Business Subcontracting Plan is expressed in terms of total subcontracted dollars.)

The Small Business Participation Plan will be incorporated into the contract upon contract award.

Table L-3: Small Business Participation Dollars and Percent

TOTAL CONTRACT VALUE - $

Category

Subcontractor Name

Proposed

SB Percent of Total

Contract Value

Proposed

SB Participation Dollars

Small Business HUBZone Small Business Veteran Owned Small

Business

Service-Disabled Veteran-

Owned Small Business

Small Disadvantaged

Women-Owned Small

Failure to adequately address all five aspects of an offeror’s Small Business may result in an

“Unacceptable” rating. Offerors that receive an “Unacceptable” rating for Small Business (after

L-9.0 VOLUME V – TRANSITION PLAN

The offeror shall describe its approach to successfully planning, implementing and accomplishing a seamless transition and maintaining continuity of support during the transition period as defined in the PWS.

Failure to adequately address all aspects of an offeror’s Transition Plan may result in an

“Unacceptable” rating. Offerors that receive an “Unacceptable” rating for Transition Plan (after

L-10.0 VOLUME VI – PAST PERFORMANCE

Even though the evaluation of acceptability of Past Performance is separate and distinct from

Determination of Responsibility required by FAR subpart 9.1, past performance information contained herein may be used to support the Determination of Responsibility for the successful offeror. Information provided on the Past Performance Questionnaires assists the evaluation team in determining the acceptability for past performance.

L-10.1 The offeror shall submit a complete list of all subcontractors and joint ventures with this volume. Past Performance Information (PPI) (Attachment L-01) should be submitted only for the major subcontractors expected to perform aspects of the effort the offeror considers critical to the overall successful performance. As stated in L-1.2, “Major Subcontractor” is defined as a subcontractor whose proposed effort provides at least 10% of the proposed total price of the contract and/or a subcontractor that performs a critical function in the performance of the resulting contract, whether it is technical or financial, and/or have important roles in any high or medium risk areas identified in the offeror’s proposal. Team Members are the entities that make up a joint venture or any other partnership or teaming arrangement that is formed for the purpose of responding to this solicitation. PPI can reflect experience at either the Prime contractor or subcontractor level. Offerors must demonstrate how the offeror’s and subcontractors’ past performance meets the relevancy definition in Section M. This information is to assist the evaluators in determining relevancy of past performance submitted for the evaluation by confirming the roles of the team members compared to the scope of the contract(s) submitted for evaluation.

L-10.2 Organizational Structure Change History

Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition.

Offerors shall include a “roadmap” describing all changes in the organization of the offeror and any teaming partners. As part of this explanation, show how these changes impact the relevance of any efforts identified for past performance evaluation/performance assessment. The "roadmap" should be both specifically applicable to the efforts identified and general enough to apply to efforts on which the Government receives information from other sources. This information will facilitate relevancy determination for contracts submitted for past performance. The organizational change roadmap is limited to a period of three years from the date of the Final RFP release.

L-10.3 Past Performance Information (PPI), Attachment (L-01): A maximum of ten PPIs may be submitted for the entire team. The team consists of the Prime offeror, its proposed subcontractors and/or joint ventures.

L-10.4 Past Performance Questionnaire (PPQ) (Attachment L-02): The offeror is responsible for, not later than 14 days prior to proposal due date, sending Attachment L-02 to respondents of their choice who will subsequently submit information to the Government to be received by the proposal due date. The offeror shall provide a list of the proposed respondents with two points of contact, current e-mail address and phone numbers in their Past Performance Volume. The Government reserves the right to contact these sources if they do not submit responses by the RFP closing date and consider them in making a past performance assessment. PPQs that do not correspond to submitted PPIs might not be evaluated.

L-10.5 Consent Letters (Attachment L-03): Past performance information concerning subcontractors will not be disclosed to a private party without the subcontractor's consent. Because a Prime offeror is a private party, the Government will need that consent before disclosing subcontractor past performance information to the prime during exchanges. The offeror shall provide a consent letter for each proposed subcontractor using the format provided at Attachment

L- 03, Consent Letter. This letter allows the release of adverse past performance information on a subcontractor to the offeror so the offeror can respond to such information.