Attachment J-01a BMD Systems Engineering Bid-To 2016-09-22
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ0147-16-R-0009
TEAMS BMDS Systems Engineering
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
The tables on the following pages list all of the product deliverables identified in the TEAMS BMDS Systems Engineering
Performance Work Statement (PWS). Each product deliverable has an associated nominal annual quantity (i.e. 3 / year). This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Amendment 0001
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #1: BMDS Planning and Architecture Development
Product Nominal Annual Quantity
Engineering End-of-Week Status (para 3.1.a) 156
Weekly Activity Reports (para 3.1.a, 3.1.g.2, 3.1.g.3) 208
BMD System Strategic Architecture Roadmap (para 3.1.a) 1
BMD System Architecture Briefings (para 3.1.a.2) 24
Architecture Analysis Parameters, Briefings, and Engineering Reports (para 3.1.a.2, 3.1.b) 28
DE-Directed Trade Study Analyses, Briefings, Reports, and Memorandums (para 3.1.c) 58
Analyses (3.1.c.1) 3
Assessments (3.1.c.1) 6
Concept and Functional Description Updates (3.1.c.1) 2
Plans (3.1.c.1) 4
Roadmaps (3.1.c.1) 1
Briefings / Briefing Materials (para 3.1.c.1, 3.1.h.8, 3.1.i.4, 3.1.i.5, 3.1.i.6, 3.1.l.4, 3.1.l.7, 3.1.l.8, 3.1.m.2, 3.1.m.4) 74
White Papers (para 3.1.c.1, 3.1.l.2, 3.1.l.3, 3.1.n.3) 18
Test Plans (3.1.c.1) 6
Test Objectives (3.1.c.1) 3
Test Requirements (3.1.c.1) 3
System Level Architectural Change Assessments (para 3.1.d) 58
Architecture Effectiveness & Alternatives White Papers (para 3.1.e) 62
Initial Requirements Documents (IRDs) (para 3.1.a.4, 3.1.f) 16
Technology Assessments (para 3.1.f.1, 3.1.l, 3.1.l.1, 3.1.m) 15
Briefings, Reports, and Memorandums (para 3.1.f.2, 3.1.f.3, 3.1.k.4) 90
Element Specification Change Reports (para 3.1.g, 3.1.g.5, 3.1.g.7) 12
Future Capabilities Transition Plans (para 3.1.h) 13
Technology Transfer Plan (para 3.1.h.1) 2
Event Calendar (para 3.1.h.2) 12
Information and Decision Briefings (para 3.1.h.3) 15
Gap Analysis Summary Advanced Technology (para 3.1.h.4) 31
Meeting Synopsis (para 3.1.h.4, 3.1.h.6, 3.1.h.8, 3.1.j.2, 3.1.l.4) 50
Integrated Experiments Campaign Requirements Document(s) Recommendations (para 3.1.h.5) 2
Configuration Management Plan Recommendations (para 3.1.h.5) 2
Risk Management Plan (para 3.1.h.5) 2
Risk Mitigation Plan (para 3.1.h.5) 2
Requirements Management Plan and Schedule (para 3.1.h.7) 2
Program Executive Review Monthly Assessment Data (para 3.1.h.8) 24
Program Executive Review Quarterly Assessment Data (para 3.1.h.8) 16
Meeting Agendas and Minutes (para 3.1.h.8) 112
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #1: BMDS Planning and Architecture Development
Product Nominal Annual Quantity
Program Overview Briefing Updates (para 3.1.h.9) 15
ASP White Paper (para 3.1.h.10) 12
ASB White Papers (para 3.1.h.10) 27
Technical Assessment Metrics Recommendations (para 3.1.h.11) 24
Technical Insight Summary (para 3.1.h.11) 4
Security Classification Guide Updates (para 3.1.h.12, 3.1.j.5) 15
Reports (para 3.1.i.4, 3.1.i.5, 3.1.i.6, 3.1.l.4, 3.1.m.1) 48
Risk Assessments and Reports (para 3.1.j) 10
Monthly Project Quad Charts (para 3.1.j.1) 60
SAP Working Papers (para 3.1.j.3) 20
Acquisition Documents and Artifacts (para 3.1.j.4) 3
Panel Synopses (para 3.1.j.6) 1
Briefing Materials (para 3.1.j.7) 3
Special Study / Trade Study Analysis Reports or Briefings (para 3.1.k) 14
Technology Assessments for Broad Agency Announcements (BAAs) (para 3.1.l.2, 3.1.l.3) 15
Purchase Request (PR) Approval Documents (para 3.1.l.2, 3.1.l.3) 15
Domestic/International University Research Program Review Summary (para 3.1.l.4) 14
Advanced Research to Identify Technology Needs Summary (para 3.1.l.5) 10
Technology Researchers Coordination Review Summary (para 3.1.l.7, 3.1.l.9, 3.1.l.10, 3.1.l.11) 50
Draft Memo for Record (para 3.1.l.7, 3.1.l.8, 3.1.m.3, 3.1.n.3, 3.1.o.3) 57
Status Reports (para 3.1.m.5) 15
Achievable Capabilities List (para 3.1.n) 1
ACL Briefings (para 3.1.n) 6
Technical and Export Control Reviews and Written Assessments (para 3.1.o) 35
Technology Security Policy Review for Public Release Approvals (para 3.1o.1) 15
Technical and Export Control Reviews and Written Assessments for Public Release (para 3.1.o.2) 15
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #2: BMDS Technology Development
Product Nominal Annual Quantity
Technical Assessments (para 3.2.b) 15
Future Capability Integration Plans (para 3.2.b) 2
BMD SDD Updates (para 3.2.c) 36
Briefings / Briefing Materials (para 3.2.d) 12
Weekly Activity Reports (para 3.2.d) 52
Engineering End-of-Week Status (para 3.2.d) 52
Element Specification Change Reports (para 3.2.d) 12
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #3: BMDS Design and Technical Baseline Establishment
Product Nominal Annual Quantity
Engineering End-of-Week Status (para 3.3) 208
Weekly Activity Reports (para 3.3) 104
BMD SDD (para 3.3.a.1) 1
BMDS PIP (para 3.3.a.1) 3
Briefings / Briefing Materials (para 3.3.a.1, 3.3.a.2, 3.3.a.5, 3.3.a.6) 27
BMDS Change Notices (para 3.3.a.2) 24
SCNs (para 3.3.a.5) 10
SICDs (para 3.3.a.5) 3
DCNs (para 3.3.a.5) 10
Comment Matrices (para 3.3.a.6) 25
Design Threat parameter Space Database and Documentation (para 3.3.a.6) 10
Comment Log Matrix (para 3.3.a.7) 3
Technical Decision Memoranda (para 3.3.a.8) 30
BMDS TBL MKO Portal Site (para 3.3.a.8, 3.3.e.2) 30
BMDS TBL CMKO Portal Site (para 3.3.a.8, 3.3.e.2) 30
Program Specifications and Interface Specifications (para 3.3.b, 3.3.b.2, 3.3.b.3, 3.3.b.4, 3.3.d.2, 3.3.d.3, 3.3.d.5, 3.3.e.4) 39
Program Technical Baseline Documents (para 3.3.b) 6
Change Notices (CNs) (para 3.3.b, 3.3.e.3.c) 15
MDA Form 007, MDA Read Ahead (para 3.3.b) 15
Technical Baseline Recommendations Summary (para 3.3.b, 3.3.c) 74
DOORS Updates (para 3.3.b.1) 36
Interface Document Library (para 3.3.b.2) 15
Interface Specification Tree (para 3.3.b.2) 2
Reports and White Papers (Assessments) (para 3.3.b.2, 3.3.b.3, 3.3.c.2, 3.3.d.5, 3.3.e.4) 264
Technical Baseline Update Briefing Package (para 3.3.b.2) 12
Technical Reports and White Papers (para 3.3.b.3, 3.3.d.3) 15
Technical Reports (para 3.3.b.4, 3.3.c.1, 3.3.c.3, 3.3.d, 3.3.d.1, 3.3.d.2, 3.3.d.3) 15
Inputs for Preliminary SCN Drafts and Updates (para 3.3.c.2) 15
White Papers (para 3.3.c.3) 116
Reports and White Papers (para 3.3.c.4) 24
After Action Reports (para 3.3.c.5) 18
Requirements Trace Reports (para 3.3.d, 3.3.d.1) 15
Briefings (para 3.3.d.1) 60
ITAG Technical Reports and White Papers (para 3.3.d.3) 15
Technical Assessment Reports (para 3.3.d.4) 15
Staff Packages (para 3.3.e, 3.3.e.2) 36
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #3: BMDS Design and Technical Baseline Establishment
Product Nominal Annual Quantity
BRWG Minutes and Decision Memoranda (para 3.3.e.1) 15
Technical Presentations (para 3.3.e.1) 15
Change Request Forms (para 3.3.e.2) 36
Single Technical Authority Decision Memos (para 3.3.e.2) 36
ISG Decision Memos (para 3.3.e.2) 36
Summary Unclassified TBL Spreadsheet (para 3.3.e.2) 30
Charter Draft (para 3.3.e.3.a) 3
ICWG meetings (para 3.3.e.3.b) 15
Interface Specifications (para 3.3.e.3.c) 15
BMD System Specification Variance (para 3.3.e.4) 4
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #4: BMDS Test and Verification
Product Nominal Annual
Quantity
Engineering End-of-Week Status (para 3.4) 364 Weekly Activity Reports (para 3.4, 3.4.b.10, 3.4.g, 3.4.g.13, 3.4.j, 3.4.l.4) 448
FRACAS (BDR), MRWG, ICWG, and ITAG Technical, After Action, Status, and Trip reports; white papers; briefings; and presentations (para 3.4)
MIP (para 3.4.a) 4
MIP Briefings (para 3.4.a) 3
MIP Inputs (para 3.4.a.1) 3
MIP Reports (para 3.4.a.1) 15
White Papers and Assessments (para 3.4.a.2, 3.4.a.3) 24
Technical, After Action, Status, and Trip Reports (para 3.4.a.2) 15
Briefings / Briefing Materials (para 3.4.a.3, 3.4.b.1, 3.4.c.8, 3.4.c.8.a, 3.4.d.12, 3.4.d.17, 3.4.g.5, 3.4.i.3, 3.4.j, 3.4.k, 3.4.l, 3.4.l.1, 3.4.l.3, 3.4.l.4)
Meeting Agendas and Minutes (para 3.4.a.3, 3.4.b.10, 3.4.c.8, 3.4.c.8.a, 3.4.c.10.a, 3.4.g.1, 3.4.i.2, 3.4.i.3, 3.4.j, 3.4.l) 2185
Updated BMDS PIP with MIP data added (para 3.4.a.5) 2
BMDS FT CONOPS / Annual Update (para 3.4.b) 1
FTSP (para 3.4.b) 2
FTSP Database (para 3.4.b) 2
IPT Agenda and Minutes (para 3.4.b) 52
IMAP (para 3.4.b) 2
IMAP, IMMP, IMTP, Verification Plan Comment Matrix (para 3.4.b) 7
CEC/EME Database Review (para 3.4.b) 2
GT CONOPS (para 3.4.b) 4
Technology Development Test Plans (para 3.4.b) 8
Test Requirement and Planning Assessments (para 3.4.b, 3.4.b.1, 3.4.c.4, 3.4.c.6, 3.4.i.2) 36
Test Configuration Sheets (para 3.4.b, 3.4.d.1) 2
CEC/EME Smart Book (para 3.4.b, 3.4.d.1, 3.4.e) 4
Technical Reports (para 3.4.b, 3.4.d.14, 3.4.i.1) 30
Event Requirements Sheets (para 3.4.b) 70
Test Analysis Results (para 3.4.b.1, 3.4.b.3) 35
Reports (para 3.4.b.1, 3.4.d.17, 3.4.e.6, 3.4.i.1, 3.4.i.3, 3.4.k, 3.4.k.1, 3.4.l.1, 3.4.l.4, 3.4.m.2) 3630
Flight Test Design and Analysis (FTDA) Review Package/Internal Minutes (para 3.4.b.1) 15
End of Event Briefing/ Briefing Material (para 3.4.b.1) 15
Test Case / Configuration Sheets (para 3.4.b.2, 3.4.c.7) 35
Analysis Results (para 3.4.b.3) 30
Test Objectives Memo (para 3.4.b.3, 3.4.c, 3.4.c.2, 3.4.d.3) 42
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #4: BMDS Test and Verification
Product Nominal Annual
Quantity
Exercise Objectives Data Collection (para 3.4.b.3, 3.4.c.5, 3.4.c.8, 3.4.c.8.a, 3.4.c.9) 18
AEP (para 3.4.b.4) 15
PMT and SPMT Reports (para 3.4.b.4) 20
GT Planning Smart Book (para 3.4.b.5) 5
GT Event Objective Prioritization (para 3.4.b.5) 5
FTSP Planning Forms (para 3.4.b.5) 2
FT Smart Books (para 3.4.b.5) 50
Blue Force Defense Designs (para 3.4.b.5, 3.4.c.8.a) 2
GT CONOPS Execution Procedures (para 3.4.b.7, 3.4.b.8) 5
Defense Designs (para 3.4.b.8) 8
GT Scenario Design Certification Report (para 3.4.b.9) 3
Weekly Staff Notes (para 3.4.b.10) 12
Trip Reports (para 3.4.b.10, 3.4.l.4) 36
Test Objectives and Scenarios (para 3.4.c, 3.4.c.7) 5
Thermometer Charts (para 3.4.c.2) 20
White Papers (para 3.4.c.3) 15
TO Memo Comments (para 3.4.c.3) 6
Test Reports (para 3.4.c.4) 15
Test Case Sheets (para 3.4.c.4, 3.4.c.6) 6
Exercise / Wargame After Action Report (para 3.4.c.7, 3.4.d.4, 3.4.d.15) 11
Exercise Objective Statements and Status Reports (para 3.4.c.7, 3.4.c.9, 3.4.d.4) 98
Meeting Summaries (para 3.4.c.7, 3.4.g.4) 220
Meeting Synopses (para 3.4.c.8, 3.4.g.1, 3.4.i.2, 3.4.i.3, 3.4.l.4) 3208
Scenario Certification Memo (para 3.4.c.10.a) 3
Pre-ITP Scenario Analysis Report (para 3.4.c.10.a) 3
Staffing Packages (para 3.4.c.10.a, 3.4.d.3) 7
Executive Test Review Briefing (para 3.4.d, 3.4.d.2.a, 3.4.d.3) 16
Products Checklist (para 3.4.d) 60
Knowledge Skills and Abilities Guide (para 3.4.d.1) 1
Resource Loading and Tracking Tool (para 3.4.d.1) 12
FT CONOPS Updates (para 3.4.d.1) 1
FT CONOPS Phase Products (para 3.4.d.1) 50
GT CONOPS Updates (para 3.4.d.1) 2
CEC/EME Thermometer Chart (para 3.4.d.1) 15
CONOPS Reports (para 3.4.d.1) 15
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #4: BMDS Test and Verification
Product Nominal Annual
Quantity
Executive Test Requirements Review Briefing (para 3.4.d.2) 7
GT Review Synopsis (para 3.4.d.2) 22
Test Readiness Review (TRR) Virtual Package (para 3.4.d.2.a) 20
Post TRR Summary Package (para 3.4.d.2.a) 15
DE Pre-Phase and Phase I FT CONOPS Product Inputs (para 3.4.d.2.a) 25
Comment Adjudication Sheets (para 3.4.d.3) 300
Wargame Development Documentation (para 3.4.d.4) 2
Exercise Development Documentation (para 3.4.d.4) 2
Element EADSIM Representation Documentation (Performance Parameter Notebook and Representation Descriptions) (para 3.4.d.4) 12
Wargame/Exercise Objective Statements and Status Reports (para 3.4.d.5) 12
Wargame/Exercise Development Documentation (para 3.4.d.5) 2
Software Change Request (SCR) Reviews Summary Report (para 3.4.d.6) 12
Event Dataset Reviews Summary Report(para 3.4.d.6) 2
Battle plan Working Group Meeting Summaries (para 3.4.d.6.a) 12
EADSIM Datasets (per event) (para 3.4.d.7) 2
EADSIM Dataset Checkout Briefing (para 3.4.d.7) 2
Pre-Mission Analysis Briefs (para 3.4.d.8) 2
Battle Plan Briefings (para 3.4.d.9) 2
EADSIM Software Change Request (para 3.4.d.10, 3.4.d.10.a) 50
Initial Risk and Mission Assurance Assessments Phase Review Briefing (para 3.4.d.12) 95
Special Study / Trade Study Analysis Report or Briefing (para 3.4.d.13, 3.4.g) 4
MAR (para 3.4.d.15) 15
Quick Look (para 3.4.d.15) 30
Executive Quick Look Briefs (EQLB) Briefings (para 3.4.d.15) 15
DE Phase 2 and 3 Product Review Package(s) (para 3.4.d.15) 200
Technology Assessments (para 3.4.d.16) 15
End-of-Day PMT, SPMT and SPFR Report (para 3.4.d.17) 20
End of the Day SITREPs (para 3.4.d.17) 40
Post Test Briefings / Briefing Materials (para 3.4.d.18) 15
Final Reports (para 3.4.d.18) 15
TARs (para 3.4.d.18) 15
FT CONOPS Comment Matrix (para 3.4.d.19) 50
Test Policy (para 3.4.d.19) 1
CEC/EME assessment reports (para 3.4.e) 6
Test Event Allocation Report (para 3.4.e) 15
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #4: BMDS Test and Verification
Product Nominal Annual
Quantity
Status Reports (para 3.4.e.1, 3.4.i.1, 3.4.n) 36
TRMP-T CEC/EME Inputs (para 3.4.e.2) 2
CEC/EME TRMP-T Module Design Document (para 3.4.e.3) 2
Technical Interchange Meetings (para 3.4.e.4) 52
Test Event Allocation Documents (para 3.4.e.4) 2
Briefings (para 3.4.e.7) 12
IMTP TCS Review (para 3.4.e.8) 12
Test Objective Memorandum Review (para 3.4.e.8) 6
Verification Reports (para 3.4.f, 3.4.f.1, 3.4.f.2, 3.4.f.3) 24
Verification Plan (para 3.4.f, 3.4.f.1, 3.4.f.6) 1
Technical Reports and White Papers (para 3.4.f, 3.4.l.2) 24
Analysis Tools (para 3.4.f.1) 15
DE DOORS Database Maintenance (para 3.4.f.3) 12
Verification Body of Evidence (para 3.4.f.4) 2
Technical Analysis White papers and Briefings (para 3.4.g) 12
Flight Test Strategic Plan Database (para 3.4.g) 1
Mission Specific Target Requirements (para 3.4.g.1) 12
Target Assessment Certification Report (para 3.4.g.1) 12
Threat-to-Target Comparison (para 3.4.g.1) 12
Flight Test Strategic Plan (FTSP) Parameter Database (para 3.4.g.2) 750
FTSP Target Parameter Database (para 3.4.g.3) 330
I-SIM FT BMDS Overlay and Operational Overlay (para 3.4.g.3) 30
Target Requirements Working Group Minutes (para 3.4.g.5) 104
TCC&R (para 3.4.g.6) 1
MDA Instruction 5000.06-INS (para 3.4.g.6) 1
TRWG Charter (para 3.4.g.6) 1
Target System Specifications (para 3.4.g.7) 1
Target Capabilities Comparison for System Specification and Mission Requirements Development (para 3.4.g.7.a) 24
Requirements Confirmation (para 3.4.g.7.a) 250
Target Data Product Requirements Definitions Document (para 3.4.g.8) 1
Configuration Management Plan (para 3.4.g.9) 1
E-Tasker Comment Matrix (para 3.4.g.10) 386
Staff Summary Sheet (para 3.4.g.10) 286
E-tasker database (para 3.4.g.10) 262
Integrated Master Schedule (para 3.4.g.11) 12
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #4: BMDS Test and Verification
Product Nominal Annual
Quantity
Status Update Chart (para 3.4.g.12) 52
Status Briefings (para 3.4.g.15) 52
Meeting Minutes (para 3.4.g.16, 3.4.i.1) 320
Engineering Analyses, Reports, and Memorandums (para 3.4.h.1) 12
Technical Reports, Briefing Packages, After Action Reports, and Summaries (para 3.4.i) 15
Action Tracking (para 3.4.i) 150
Issue Sheet Comments (para 3.4.i) 200
Meetings (para 3.4.i.1) 40
Reviews (para 3.4.i.1) 5
DPR, DBR, TBR, and BAR Support (para 3.4.i.1) 80
After Action Reports (para 3.4.i.1) 15
Courses of Action (COAs) (para 3.4.i.1) 25
Contingency Plans (para 3.4.i.1) 15
Implementation Plan (para 3.4.i.1) 25
Audit Responses (para 3.4.i.1) 4
Action Item File Responses (para 3.4.i.1) 25
Executive Summary (EXSUM) for Executive Reviews (para 3.4.i.1) 60
TIMs Summary Report (para 3.4.i.1) 2
Mission Data Reviews (MDR) Summary Report (para 3.4.i.1) 2
QLBs (para 3.4.i.1) 2
Charter Updates (para 3.4.j) 2
FT Mission Overview Briefing/Briefer (para 3.4.j) 26
OTA Issue Sheets (para 3.4.j) 150
FT Consolidated Executive Review Schedule (para 3.4.j) 52
Records Management (para 3.4.j.1) 15
Risk and BDR Mitigation Plans (para 3.4.k) 10
FRACAS BDR briefing Package (para 3.4.k.1) 10
Meeting Notices and Agendas (para 3.4.l.5) 104
Minutes and Action Items (para 3.4.l.5) 104
Risk and BDR Briefings (para 3.4.m) 104
Risk Database/Library (para 3.4.m.1) 2
Repository Updates (para 3.4.m.1) 15
End of Event Reports (para 3.4.m.1) 20
Best Practices Database (para 3.4.m.1) 20
FTSP Database Updates (para 3.4.m.1) 26
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #4: BMDS Test and Verification
Product Nominal Annual
Quantity
Lesson Learned Database Report (para 3.4.m.1) 25
THAAD Observation Reports (TORs) Database Updates (para 3.4.m.1) 12
BDRs Database Updates (para 3.4.m.1) 24
TRMP-T database updates (para 3.4.m.1) 12
Element Prototype Planner Software Change Requests (para 3.4.m.2) 30
Initial Test Resource Requirements Assessment (para 3.4.m.2) 11
Element Prototype Planner Performance Briefings for Planning Exercises (PLANEX) / Exercises (para 3.4.m.2) 1
GT Lessons Learned (para 3.4.m.2) 2
MRWG Smart Book (para 3.4.n) 16
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #5: BMDS Capability and Architecture Assessment
Product Nominal Annual Quantity
Engineering End-of-Week Status (para 3.5) 52
Weekly Activity Reports (para 3.5) 52
Integrated Master Assessment Plan (para 3.5.a) 2
BMDS Assessment Strategy (para 3.5.b) 10
Meeting Agendas, Briefing Materials, Minutes and Action Item Tracking (para 3.5.b, 3.5.c, 3.5.c.6, 3.5.c.12, 3.5.h) 96
APs (para 3.5.c) 9
AXPs (para 3.5.c, 3.5.c.3) 8
ARs (para 3.5.c, 3.5.c.4, 3.5.c.10, 3.5.c.11) 22
Element Informational Briefings (para 3.5.c.1) 9
Follow-on TIM Agenda and Minutes (para 3.5.c.1) 13
AP Revisions (para 3.5.c.2) 27
AXP Revisions (para 3.5.c.2) 27
AR Revisions (para 3.5.c.2) 27
Briefing Materials (para 3.5.c.2, 3.5.c.3, 3.5.c.4, 3.5.d.2, 3.5.d.3) 18
Meeting Minutes (para 3.5.c.2, 3.5.c.3, 3.5.c.4, 3.5.c.5, 3.5.d.2, 3.5.d.3) 18
EXSUMs (para 3.5.c.2, 3.5.c.3, 3.5.c.4, 3.5.c.5, 3.5.d.2, 3.5.d.3) 18
CACs (para 3.5.c.4) 40
KTPs (para 3.5.c.4) 400
Updated ARs (para 3.5.c.6) 27
Capabilities and Limitations Baseline (para 3.5.c.9, 3.5.d.3) 5
Briefing Materials in support of Engineering Boards (para 3.5.d.1) 18
Assessment Reports and Addenda (para 3.5.d.4) 5
START Database Design Document (para 3.5.e) 1
START Data Dictionary (para 3.5.e) 1
START Database User's Guide (para 3.5.e) 1
START Configuration Management Plan (para 3.5.e) 1
Master Schedule (para 3.5.f) 11
Master Schedule Updates (para 3.5.f) 52
Technical Summaries and Comments (para 3.5.g) 15
Staff Meeting Presentations (para 3.5.g) 52
Meeting Minutes / Executive Summaries (para 3.5.g) 65
Venue Allocation CONOPS (para 3.5.h) 1
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #6: BMDS Delivery
Product Nominal Annual Quantity
OCB Updates (para 3.6.a) 20
OWG Meeting Agendas and Minutes (para 3.6.b) 60
Meeting Synopsis (para 3.6.b) 100
OCB Unclassified Spreadsheet Tool (para 3.6.b) 20
OWG Action Items (para 3.6.b) 60
OCB Concurrence Forms (para 3.6.b) 20
OCB MKO and CMKO Portals (para 3.6.c) 20
MKO and CMKO OCB Portal Pages (para 3.6.c.1) 20
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #7: Product Office Systems Engineering
Product Nominal Annual
Quantity
Technology Assessments (para 3.7.a, 3.7.b) 15
Review Briefing Packages (para 3.7.a, 3.7.a.1) 26
Action Coordination Response Report (para 3.7.a) 20
SAP Oversight Briefings (para 3.7.a.1) 5
Reports (para 3.7.a.2, 3.7.b, 3.7.b.7) 22
Briefings / Briefing Materials (para 3.7.a.2, 3.7.b) 22
Technical Analysis (para 3.7.a.2) 9
Cost Analysis (para 3.7.a.2) 15
Program Management Reviews (para 3.7.a.2) 12
Meetings (para 3.7.a.2) 65
Test Analysis Results (para 3.7.b) 3
Summary Notes with Analysis (para 3.7.b) 20
JRMET Technical, After Action, and Status Reports, Minutes, Briefings, and Presentations (para 3.7.b) 28
Draft Responses (para 3.7.b.1) 20
Staff Packages (para 3.7.b.1) 20
WAR Updates (para 3.7.b.1) 52
Comment Matrices (para 3.7.b.2) 100
Briefings / Reports (para 3.7.b.3) 4
Countermeasures Risk Assessment Roadmap (para 3.7.b.4) 1
Assessments (para 3.7.b.5) 8
Technology Maturation Plans (para 3.7.b.6) 5
Trade studies (para 3.7.b.7) 10
Technical Reports, Briefings, and Minutes (para 3.7.b.8) 15
Composite Risks (para 3.7.b.8) 15
Coordination Meeting (para 3.7.b.8) 260
Database Queries (para 3.7.b.8) 500
Program Test Objectives and Scenarios (para 3.7.b.9) 5
Program Technology Test Plan (para 3.7.b.9) 2
CARD Draft Working Papers (para 3.7.c) 7
Software Technical Reports (para 3.7.d, 3.7.d.1, 3.7.d.2, 3.7.d.3, 3.7.d.4, 3.7.d.7, 3.7.d.8, 3.7.d.9, 3.7.d.11, 3.7.d.12, 3.7.d.13, 3.7.d.14, 3.7.d.15, 3.7.d.16)
Materiel Release Schedules (para 3.7.d.5) 4
Software Change Packages (para 3.7.d.5) 26
Modification Work Orders (para 3.7.d.5) 12
Software Library Catalogue (para 3.7.d.6) 12
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #7: Product Office Systems Engineering
Product Nominal Annual
Quantity
Earned Value Management Analyses (para 3.7.d.10) 12
Software Technical Task Descriptions (para 3.7.d.11) 2
Software Schedules (para 3.7.d.12, 3.7.d.16) 12
Software Build Documentation and Software Metrics (para 3.7.d.12) 12
JRMET Scorecard, Minutes, and Reports (para 3.7.e.1) 15
JRMET Database, Scorecards, and Portal Site (para 3.7.e.2) 15
Issue Sheets (para 3.7.e.3) 15
Action Items Tracking (para 3.7.e.3) 15
Technical Reports (para 3.7.e.4) 15
Program Failure Documentation (para 3.7.e.4) 15
Minutes, White Papers, After Action Reports, and Action Item Reports (para 3.7.e.5) 15
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #8: Engineering Functional Management
Product Nominal Annual
Quantity
Engineering End-of-Week Status (para 3.8) 208
Weekly Activity Reports (para 3.8, 3.8.b.8) 208
JRMET RAMWG Technical, After Action, and Status reports, briefings, and presentations (para 3.8) 10
Analysis Results (para 3.8.a.1, 3.8.a.2.b, 3.8.b.1, 3.8.b.11.d, 3.8.b.15, 3.8.b.15.a) 13
RFI Responses (para 3.8.a.2, 3.8.a.2.c) 50
RFA Responses (para 3.8.a.2, 3.8.a.2.c) 50
Red Force Laydown (para 3.8.a.2) 1
Blue Force Laydown (para 3.8.a.2) 1
RFI Response Recommendations (para 3.8.a.2.a) 790
RFA Response Recommendations (para 3.8.a.2.a) 790
RFI Information (para 3.8.a.2.b) 25
RFA Analysis Results (para 3.8.a.2.b) 35
Studies, detailed analyses, and document reviews (para 3.8.a.3) 75
Synopses of TIMs, Wargames, Tests, Exercises, technical project reviews and presentations (para 3.8.a.3) 50
Technical verification and operational validation event results coordination and review (para 3.8.a.3) 12
Briefings / Briefing Materials (para 3.8.a.3.a, 3.8.a.4, 3.8.b.1, 3.8.b.4, 3.8.b.9.a, 3.8.b.11.c, 3.8.b.13, 3.8.c.1, 3.8.d.4, 3.8.e.3, 3.8.g.1, 3.8.g.2, 3.8.i)
Meeting Synopses (para 3.8.a.4, 3.8.b.1, 3.8.c.1, 3.8.e.3, 3.8.i) 1052
Independent Non-advocate Reviews (para 3.8.a.4) 2
Read Aheads (para 3.8.b.1) 160
Executive Review EXSUMS (para 3.8.b.1) 160
End-of-Week and End-of-Day Reports (para 3.8.b.1) 20
End-of-Event Briefing Package (para 3.8.b.1) 15
Staff Summary Sheets (para 3.8.b.14) 36
BMDS and Program-level Plans and Documentation Updates (para 3.8.b.2) 3
Briefings (para 3.8.b.2.a) 15
Reports (para 3.8.b.3, 3.8.b.10, 3.8.b.15.a) 58
System Pre-Mission Test (SPMT) and Test Execution End-of-Day Reports (para 3.8.b.7) 20
SPMT and Test Execution End-of-Week Reports (para 3.8.b.7) 7
Flight Test Issues Sheet (para 3.8.b.7, 3.8.b.8) 52
TO Memo Metrics (para 3.8.b.8) 52
Resource Metrics (para 3.8.b.8) 52
Portal Content (organization, maintenance, access control) (para 3.8.b.10.b) 50
Spectrum Supportability Risk Assessment (para 3.8.b.14, 3.8.b.14.a, 3.8.b.14.c, 3.8.b.14.d) 8
Spectrum Supportability Evaluations (para 3.8.b.14, 3.8.b.14.a, 3.8.b.14.c, 3.8.b.14.d) 2
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #8: Engineering Functional Management
Product Nominal Annual
Quantity
Inter-Service SM Document (Frequency Assignment Request) (para 3.8.b.14, 3.8.b.14.a, 3.8.b.14.c, 3.8.b.14.d) 12
SM Stage 4 DoD Form 1494 (para 3.8.b.14, 3.8.b.14.a, 3.8.b.14.c, 3.8.b.14.d) 4
Quarterly SM Working Group Briefings (para 3.8.b.14, 3.8.b.14.a, 3.8.b.14.c, 3.8.b.14.d) 4
Element Spectrum Supportability Risk Assessment Technical Review (para 3.8.b.14.a) 2
Spectrum Supportability Documentation Technical Review (para 3.8.b.14.a) 2
SM Document (Frequency Assignment Request) (para 3.8.b.14.a) 6
CCMD or Element Host Nation Technical Review (para 3.8.b.14.a) 4
Element SM Stage DoD Form 1494 Technical Review (para 3.8.b.14.a) 2
Element SM Monthly Reviews (para 3.8.b.14.a) 12
Spectrum Management Working Group Briefings (para 3.8.b.14.b) 6
Spectrum Management Working Group Agenda (para 3.8.b.14.b) 6
Develop SSS for E-tasker and coordination with Element Programs (para 3.8.b.14.c) 6
Briefing Slides (para 3.8.e.1) 260
Meeting Agendas and Minutes (para 3.8.e.3) 156
JRMET Charter (para 3.8.h) 2
White Papers (para 3.8.h) 15
JRMET Meeting Minutes and Action Item Closure Status (para 3.8.h.1) 15
Technical Reports (para 3.8.h.1) 15
RAM Database Updates (para 3.8.h.2) 5
Smart Books (para 3.8.i) 2
Web/Portal Page (para 3.8.i) 50
POC Lists (para 3.8.i) 10
Fault Tree Analysis (para 3.8.i.1) 12
Fishbone Diagram (para 3.8.i.1) 12
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #9: Modeling and Simulation
Product Nominal Annual
Quantity
M&S Plans and Strategies (para 3.9.a) 15
Threshold and objective key performance parameters and milestones for each BMDS M&S Increment (para 3.9.a) 3
Independent evaluation of baseline execution versus plans (para 3.9.a) 5
BMDS M&S CPSs (para 3.9.b.5) 6
Program Plan (para 3.9.b.5) 7
I-Sim Audio/Visual Products (para 3.9.c.1) 4
Training Curriculum (para 3.9.c.2) 3
BMDS M&S Strategic Plan (para 3.9.e.4) 1
M&S Engineering Market Analysis (para 3.9.e.6) 2
M&S Acquisition Plans (para 3.9.e.6) 2
M&S Acquisition Strategies (para 3.9.e.6) 2
BMDS M&S Conceptual Model (para 3.9.f.1) 2
BMDS M&S System Requirements Documents (para 3.9.f.3) 2
SPFR Benchmark Testing Daily Summaries (para 3.9.f.4) 6
SPFR Briefs/Reports (para 3.9.f.4) 2
Accreditation Plans/Reports (para 3.9.f.5) 2
V&V Plans/Reports (para 3.9.f.5) 4
Model Analysis and Assessment Reports (para 3.9.f.5) 4
BMDS M&S Policies/Directives (para 3.9.f.6) 1
BMDS M&S VV&A Database (para 3.9.f.10) 1
M&S VV&A Toolkit (para 3.9.f.10) 1
Update M&S Strategic Plan (para 3.9.g.1) 1
AoAs (para 3.9.g.2.a) 4
CoAs (para 3.9.g.2.a) 4
Analysis of Performance Specifications (para 3.9.g.2.b) 4
Assessment of Non-compliance to Requirements Report (para 3.9.g.3) 4
Action Item Resolution (para 3.9.g.3) 4
Executive Summaries (para 3.9.g.4) 72
M&S Diagrams/Descriptions (para 3.9.g.4) 36
Assessment of Contractor inputs to Technical Evaluation of Proposals and Cost Estimates (para 3.9.g.5) 3
Assessment of Submittals to AMRDEC STARS Lab Offers (para 3.9.g.5) 3
Sensors Model Functionality Matrix (para 3.9.g.6) 4
RFI Responses (para 3.9.g.6, 3.9.g.6.a) 24
Sensors M&S Development Schedules for SNE IMS (para 3.9.g.7) 52
SNEA Program Plan (para 3.9.g.7) 4
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #9: Modeling and Simulation
Product Nominal Annual
Quantity
Sensors Monthly Activity Report (para 3.9.g.8) 12
Short Suspense Responses, Assessments and Reports (para 3.9.g.8) 52
Updated M&S Repository (para 3.9.g.9) 12
Updated V&V Library (para 3.9.g.9) 12
Sensors M&S Verification and Validation Plan (para 3.9.g.10) 2
Sensors M&S VV&C White Papers (para 3.9.g.11) 4
Sensor M&S Responses to OTA, EEV, and other RFIs (para 3.9.g.11) 4
Sensors CEC/EME Closure Evidence (para 3.9.g.12) 1
Sensors Acceptability Criteria Review Report (para 3.9.g.12) 1
Issues or Areas of Concern (para 3.9.h) 12
M&S Community Feedback (para 3.9.h) 12
Planning Schedules and Development Tracking of THAAD M&S Integration to System Venues (para 3.9.h) 24
BMDS OTA Accreditation Plan (para 3.9.h) 2
THAAD M&S Briefings and Documents (para 3.9.h) 52
Action Item Tracking (para 3.9.h, 3.9.h.2, 3.9.h.3, 3.9.h.4, 3.9.h.5.a) 52
MDA Form 100, MDA Comments Matrices (para 3.9.h.1) 52
TH M&S Verification and Validation Plan (para 3.9.h.2) 2
VV&A Report Reviews (para 3.9.h.2) 12
Element Post-Flight Reconstruction Reports Reviews/Comments (para 3.9.h.2) 2
THAAD M&S Briefings (para 3.9.h.2, 3.9.h.3) 52
TH M&S Requirements Documents (para 3.9.h.3) 12
TH M&S Simulation Support Plan (para 3.9.h.3) 2
TH M&S Development and Implementation Plans (para 3.9.h.3) 2
THAAD M&S Test Plans (para 3.9.h.3) 2
THAAD M&S Smart Book (para 3.9.h.3) 12
Meeting Minutes and/or Synopses (para 3.9.h.4) 52
SCR Spreadsheet (para 3.9.h.5.a) 52
TH Wargames and Exercises Calendar (para 3.9.h.5.a) 12
Change Requests and SCR Review and Assessment (para 3.9.h.5.a) 52
Configuration Management Plan for Wargames and Exercises products (para 3.9.h.5.a) 2
Wargames and Exercises Dataset Development Process & Procedures (para 3.9.h.5.a) 2
M&S Product Specific Notebook of all CRs and SCRs written during Wargames and Exercises events (para 3.9.h.5.a) 2
Bid-To Product Quantities
August 2016
This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Performance Objective #10: Foreign Material Sales Weapon Systems Support
Product Nominal Annual Quantity
FMS THAAD Software Technical Reports (para 3.10, 3.10.a.1, 3.10.b, 3.10.b.1) 24
FMS THAAD Field Reports (para 3.10, 3.10.a.1, 3.10.b, 3.10.b.1) 4
FMS THAAD Meeting Reports (para 3.10, 3.10.a.1, 3.10.b, 3.10.b.1) 4
FMS THAAD Trip Reports (para 3.10, 3.10.a.1, 3.10.b, 3.10.b.1) 4
FMS THAAD Analyses, Assessments, and Evaluations (para 3.10.a, 3.10.a.2, 3.10.a.3, 3.10.a.4, 3.10.a.5, 3.10.b.3, 3.10.b.4) 12
FMS THAAD Summary Analysis (para 3.10.b.2) 1
FMS THAAD Software Schedules (para 3.10.b.2) 12