0047_Performance_Work_Statement.pdf
PDF 96 KB Posted
- Attached to
- Pentagon Plumbing & Facility Services
- Solicitation number
- HQ003415R0047
- Issued by
-
DOD Washington Headquarters Service
About this file
Performance Work Statement
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Cleaning of Kitchen Exhaust Systems, Grease Trap Systems and Sewage Lift and Holding Systems
23FEB15
1. General. The Contractor shall provide all labor, equipment, tools, materials and qualified supervision necessary to ensure that the kitchen exhaust systems, grease trap systems and sewage lift and holding systems are cleaned to bare metal and concrete at various locations within the Pentagon and on the Pentagon Reservation, excluding
RRMC.
1.1 Bidding Requirements. The Contractor shall visit the site, assess the difficulty of work, size of work, and field verify all dimensions and any interference before bidding.
1.2 Price and Proposal. The Contractor shall submit price and proposal for the cleaning and maintenance of all Kitchen Exhaust Systems, Grease Trap Systems and Sewage Lift and Holding Systems listed in this PWS.
2. Scope.
2.1 Overview. The intent of the work is to provide cleaning services of the systems in this PWS to ensure reliability and proper operation and functionality of the utilities at the Pentagon. This is a performance based contract, the contractor will be responsible for determining the frequency of cleaning required to ensure continuous operations. The Government has provided minimum cleaning frequencies as historical data.
2.2 Kitchen Exhaust Systems.
2.2.1 The Contractor shall inspect and clean all specified kitchen duct and exhaust systems in accordance with NFPA Standard 96, other applicable local, state, and federal regulations and procedures and this statement of work. Kitchens Exhaust Systems are listed in Table 1.
The Contractor and the Government quality assurance inspector shall review the current status of all ducts, and exhaust systems included in this contract before servicing is to take place.
2.2.2 Prior to commencement of cleaning operations, ceilings, walls and electrical outlets shall be protected from damages due to accessing ducts or other parts of the exhaust system. All kitchen equipment, countertops, shelves, and other items shall be covered to prevent contamination during cleaning operations. The Contractor shall cover all surfaces underneath hoods and ducts to prevent grease, oil or cleaning solution damage.
2.2.3 Positive cleaning methods shall include but not be limited to manual removal of solidified, semi-solidified, or liquid cooking grease buildup by low pressure application of approved detergents, wash/rinse processes utilizing high pressure hot water or saturated steam cleaning.
2.2.4 No flammable solvents or other flammable cleaning aids shall be used in accomplishing services described in this contract.
2.2.5 Cleaning shall remove all grease accumulation throughout the entire kitchen exhaust system, thereby exposing bare metal in accordance with NFPA 96 as measured by a grease depth gauge.
2.2.6 Cleaning shall include but is not limited to the interior and exterior surface of hoods, fan housings, fans, vertical duct work, horizontal duct work, drip wells, grease receivers, filter racks, filters, water wash baffles and the chambers behind the filters. The Contractor shall dismantle hood components where applicable.
2.2.7 Cleaning shall include the exterior surfaces of fire extinguishing system pipes, nozzles, conduits, and detector brackets within the hood and duct.
2.2.8 Care shall be taken by the Contractor not to apply cleaning chemicals on fusible links or other detection devices or the automatic extinguishing system. Fusible links must be cleaned.
2.2.9 The Contractor shall have pressure washing 360 degree rotation spin jet attachments for cleaning round ducts and any lengths of angular ducts greater than 10 feet and less than 20 feet (greater than one story and less than three).
2.2.10 If equipment must be moved for cleaning, the Contractor shall coordinate with PBMO. The
Contractor shall be responsible for moving the cooking appliances safely out of the way of the hood during cleaning and place them back after cleaning the hoods.
Table 1. List of Kitchen Exhaust Systems
Item # Kitchen Hood Location Riser Fan #
HISTORICAL
Cleaning Fequency
1 PLC#2 Main BJ945B PLC2 PL-MJ953-01 Min. 3 Months 2 PLC#2 Prep BH949A PLC2 PL-MJ953-02 Min. 3 Months 3 Qdoba 3/4 Cafe COR 3 FRC- 405 Min. 3 Months 4 Charley’s Philly Steaks 3/4 Cafe COR 4 FRB-405 Min. 3 Months 5 Peruvian Chicken 3/4 Cafe COR 4 FRB-407 Min. 3 Months 6 SLDF#1 - ARMY 3D558 COR5 W2-EF-24 Min. 3 Months 7 AFP – AIR FORCE 4D868 COR8 W3-EF-54 Min. 3 Months 8 CDR - JCS 2E861 COR8 W3-EF-50 Min. 3 Months 9 OSD 3E859 COR8 W3-EF-49 Min. 3 Months
10 SLDF#2 NAVY 1 4D733 COR7 W3-EF-60 Min. 3 Months 11 SLDF#2 NAVY 2 4D733 COR7 W3-EF-62 Min. 3 Months 12 Dominic’s BC Cafe BC Cafe COR7/8 W3-EF-40 Min. 3 Months 13 McDonald’s 7/8 Cafe COR7 W3-EF-34 Min. 3 Months 14 Taco Bell 7/8 Cafe COR7 W3-EF-35 Min. 3 Months 15 Dunkin Donuts 7/8 Cafe COR7 W3-EF-36 Min. 3 Months 16 Panda 7/8 Cafe COR8 W3-EF-37 Min. 3 Months 17 Sbarro 7/8 Cafe COR8 W3-EF-38 Min. 3 Months 18 CCY Café Main4V CCY CCY EF-RY670-01 Min. 3 Months 19 CCY Café Prep CCY CCY EF-RY670-02 Min. 3 Months 20 Sr. Army Kitchen 3D716 COR 7 EF-3D724 Min. 3 Months 21 Dominic’s 10/1 Cafe COR1 &10 W4-EF-50 Min. 3 Months 22 Market Basket 10/1 Cafe COR1&10 W4-EF-48 and 48A Min. 3 Months 23 Burger King 10/1 Cafe COR1&10 W4-EF-46 Min. 3 Months 24 Fresh Kitchen 10/1 Cafe COR1&10 W4-EF-39 Min. 3 Months 25 Popeye’s 10/1 Cafe COR1&10 W4-EF-49 Min. 3 Months 26 Surf City 10/1 Cafe COR1&10 W4-EF-45 Min. 3 Months 27 Subway 10/1 Cafe COR1&10 W4-EF-51 Min. 3 Months 28 Dunkin Donuts 10/1 Cafe COR1&10 W4-EF-42 Min. 3 Months
29 Pentagon Athletic Center (PAC) Laundry Exhaust duct work
From PAC Laundry room to the RDF outlet
PAC Inline Duct Booster Fan
Min. 3 Months
2.3 Grease Trap Systems.
2.3.1 The Contractor shall inspect and clean all grease trap systems listed in Table 2. The grease trap system includes the grease interceptor and associated grease piping, defined as: grease waste drain lines from the source floor and sink drains to the grease interceptor, the outlet sanitary drain line up to the first riser or horizontal main line and vent lines.
2.3.2 The Contractor shall clean the grease interceptors in accordance with the manufacturer’s recommendations and the Performance Objectives of this contract. The Contractor shall provide all tools, equipment, labor and supervision necessary to access and clean all portions of the grease interceptor; this includes removing and replacing interceptor lids, baffles and access caps in accordance with manufacturer’s specifications. The Contractor shall provide the Government with cleaning procedures to be followed for grease interceptor cleaning. The Contractor shall inform the Government of any changes to cleaning procedures. The Contractor’s cleaning means and methods shall remove all grease accumulation throughout the entire Grease Trap system thereby exposing bare metal.
Cleaning shall include but is not limited to the interior and exterior surface of grease interceptors, baffles and the surrounding areas. Many of the grease interceptors have heavy lids and baffles that must be lifted for proper cleaning; the Contractor shall provide all required tools and equipment to properly lift these portions of the system safely and place them back in the appropriate location. The grease interceptors have enclosed discharge sections that shall be cleaned through the vent holes with every cleaning of the interceptor.
2.3.3 The Contractor shall utilize sewer cable machines and sewer pressure washers with associated accessories (e.g. blades, nozzles, etc.) and whatever other means necessary to safely and nondestructively clean all grease piping to bare metal in order to maintain proper waste discharge and prevent grease build up in grease interceptors and piping. All tools and equipment utilized on the grease piping shall be appropriately sized based on the system parameters. All work on the grease piping system shall be completed by a licensed plumber with at least 10 years of documented experience as a licensed plumber.
2.3.4 The Contractor shall utilize sewer video cameras with appropriate accessories that provide access to all grease piping in order to troubleshoot system blockages as well as to demonstrate that all grease piping is clear to bare metal surface. The camera shall have the ability to measure the distance in the pipe and provide a date/time stamp of all recordings on DVDs. The Contractor shall provide copies of videos of the grease piping with date/time stamps to the Government for review for all scheduled and emergency cleanings.
2.3.5 The Contractor shall clean the immediate area surrounding the grease interceptors and piping access points and prevent accumulation of grease and debris. The Contractor shall clean all work areas to be completely free of grease and debris during each cleaning. The Contractor shall provide their own cleaning materials to clean all adjacent surfaces (floors, walls, doors, shelving, cabinets, etc.) and leave all work areas clean and free of grease.
2.3.6 If any floor cleanout cover for the lines and grease interceptor plug cannot be removed due to any reasons, the Contractor shall cut the screws, cover and/or plug in order to complete the required cleaning. New covers, missing screws, plugs and fasteners shall be provided by the Contractor and installed immediately after cleaning. The Contractor shall notify the COR in writing of any defective containment seals or lid bolts in need of replacement and conduct the necessary repairs to return the equipment to normal operation.
2.3.7 If any equipment must be moved to conduct cleaning, the Contractor shall coordinate with the COR in advance.
2.3.8 The Government will inspect work and assess performance based on the Performance
Objectives. Should the quality of work and frequency result in performance deficiencies, the Contractor will be required to adjust their means, methods and frequency to meet the Performance Objectives. The Contractor shall inform the COR in writing if the frequency of cleanings needs to be adjusted to ensure proper grease trap system operation.
2.3.9 The Contractor shall test the contents of RDF Oil and Sand trap located on the RDF trash site by a certified laboratory before pumping the trap and dispose it per federal, state and county regulations.
Table 2. List of Grease Trap Systems
Equipment # Location / Description Model Manufacturer
HISTORICAL
Cleaning Frequency
GI-1 BH949A - PLC2 / Kitchen Not available Zurn 2-Weeks
GI-2 1B440 - 3/4 - Elevator Bank J-60210A Josam 2-Weeks
GI-3 1D556 - Corridor 5 Z1172-1000 Zurn 2-Weeks
GI-4 1B758 - 7/8 - Elevator Bank J60216A Josam 2-Weeks
GI-5 1E747 - Corridor 7 Z1172-1200 Zurn 2-Weeks
GI-6 BC843A - DODCC
Kitchen Not available Zurn 2-Weeks
GI-7 1C856A - Corridor 8 Z1172-1200 Zurn 2-Weeks GI-8 1CYC663 - CCY Kitchen Smith-8465 JR Smith 2-Weeks GI-9 1C1071 - Corridor 10 Z1172-1700 Zurn 2-Weeks
GI-10 1C124 Corridor 10.5 Z1172-1900 Zurn 2-Weeks GI-11 RDF Trash Site J-1000EE Jensen Once per year GI-12 RDF1K688 JR-8300 JR Smith Once per year
N/A Grease piping: all areas excluding main food court N/A N/A 3- months
N/A Grease piping: main food court N/A N/A 2- months
Total volume pumped out from all grease interceptors is approximately 7,000 gallons.
2.4 Sewage Lift Stations.
2.4.1 The Contractor shall pump out sewage, pressure wash and clean the Sewage Lift Station Pits in accordance with manufacturer’s recommendations and the Performance Objectives.
2.4.2 The Contractor shall jet wash main sewage drain lines as needed so that sewage flows to and from the pit without any restriction.
Table 3. List of Sewage Lift Stations
Equipment # Location / Description
HISTORICAL
Cleaning Frequency
1 Moat Pit outside the Pentagon near Mall Entrance Semi-annual
2 PLC2 Pit Outside the PLC2 Semi-annual
3 PAC Pit Inside the Pentagon room BG645 Semi-annual
MEF Pit outside the Pentagon near Metro Escalators
Semi-annual
Corridor 1&2 Pit outside the Pentagon near A/E drive entrance
Semi-annual
Old Child Daycare Center (CDC) Pit outside the
CDC
Semi-annual
7 CCY Pit under the center Court Yard Semi-annual
8 BF937 Pit inside the Pentagon Semi-annual
9 BF742B Pit inside the Pentagon Semi-annual
2.5 Sewage Holding Tanks.
2.5.1 The Contractor shall clean and pump out sewage holding tanks in accordance with manufacturer’s recommendations and with the results described in the Performance Objectives.
2.5.2 The Contractor shall jet wash main sewage drain lines as needed so that sewage flows to and from the holding tank without any restriction.
2.5.3 The Government has called for twenty four (24) services in the last twelve (12) month period. The Contractor has to determine his own frequency. The Contractor shall be prepared to empty the tanks in inclement weather as the tanks fill up quickly during rain and snow.
Table 4. List of Sewage Holding Tanks
Equipment # Location / Description Volume to be pumped
HISTORICAL
Cleaning
Frequency Green House Sewage Holding tank
One (1) underground tank, approximately 1,800 gallons.
As needed to avoid alarms
K-9 Sewage Holding Tank One (1) underground tank, approximately 3,000 gallons.
As needed to avoid alarms
RDF Mail Handler Trailer waste water holding tanks
Four (4) tanks mounted under the mail trailers, approximately 500 gallons each.
As needed to avoid alarms
2.6 Contractor Minimum Qualifications.
2.6.1 The Contractor shall be a Certified Exhaust Cleaning Company or a company that employs
Certified Exhaust Cleaners that possess Plumbing Licenses. Acceptable certification bodies include Phil Ackland Certification, International Kitchen Exhaust Cleaning Association (IKECA) or a Kitchen Exhaust Cleaners Training and Certification Program created in compliance with ISO 9001. The Contractor shall have a crew leader/supervisor onsite for the duration of the cleaning operation that has holds either an IKECA Certified Exhaust Cleaning Specialist (CECS) or Certified Kitchen Exhaust Cleaner (CKEC) Certification from a training program created in compliance with ISO 9001. The Contractor shall be knowledgeable of National Fire Protection Association (NFPA) 96 – Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations and Federal Occupational Safety and Health (OSHA) Standards. The Contractor shall provide proof of certifications with their proposal.
2.6.2 The Contractor shall submit plumbing license documentation along with 10 years of documented licensed plumbing experience of all plumbers who shall clean the grease trap system piping. The Contractor shall provide proof of licensure and experience with their proposal.
2.6.3 At least one individual per work team shall be able to understand and speak conversational
English. Crew leader/supervisor shall be able to read, write and understand technical English.
2.6.4 The Contractor shall provide the names addresses and phone number of a minimum three
(3) past clients serviced over the past three years.
2.7 Hours of Operation. The Contractor shall coordinate all work with building management. Cleaning services will be performed as follows:
2.7.1 Kitchen Exhaust Systems: Off hours after 5:00 PM and Saturday hours from 7:30 AM to
4:00 PM.
2.7.2 Grease Traps Systems: Off hours after 5:00 PM and Saturday hours from 7:30 AM to 4:00
PM.
2.7.3 Sewage Lift Stations: Normal working hours Monday to Friday from 7:30 AM to 4:00 PM except PAC Sewage pit BG645, CCY pit, BF937 Pit,BF742B Pit, MEF Pit which requires cleaning on Saturdays.
2.7.4 Sewage Holding Tanks: Normal working hours Monday to Friday from 6:00 AM to 5:00
PM.
2.8 The Contractor shall respond to emergency calls within 30 minutes and be on site within two (2) hours. Any services performed under this section are covered under the firm fixed contract price.
2.9 The Contractor shall dispose of all waste/material in accordance with applicable Federal, Commonwealth of Virginia, and local rules/regulations. Copies of all waste manifests for Pentagon solid wastes will be provided to the COR.
2.10 No flammable solvents or other flammable cleaning aids shall be used in accomplishing services described in this contract.
2.11 The Contractor shall remove and reinstall all items (i.e. access panels, grease filters, etc) as needed to be cleaned or to access areas to be cleaned.
2.12 The Contractor shall install new access panels wherever required to clean the duct work thoroughly.
2.13 The Contractor shall post a certificate no more than four hours after the successful completion of work at each piece of equipment indicating the date of cleaning, the date of the next service, the name of the company, all areas not cleaned and company contact information.
2.14 When cleaning procedures are completed, all access panels, doors, cover plates and any other associated closing mechanisms shall be restored to their normal operational condition. The Contractor shall also bring all systems back to the original status and clean their work area. The Contractor should not leave anything behind.
2.15 When an access panel is removed, a Contractor company label or tag preprinted with the name of the
Contractor and giving the date of inspection or cleaning shall be affixed near the affected access panels.
2.16 Vehicle height access into the Pentagon is limited to 10 feet – 4 inches and 10 feet – 2 inches in some areas due to roadway restrictions. The Contractor shall utilize vehicles that will adequately clear this height restriction.
2.17 The Contractor shall be prepared to identify specific work areas (if any) of the systems included in this
PWS that are inaccessible, or not possible to clean and provide solutions that allow for cleaning.
Upon execution of the solutions or their equivalency [as determined by WHS/FSD], the Contractor shall be prepared and capable of inspecting and cleaning all areas and surfaces of the systems included in this PWS to bare metal and concrete.
2.18 Repairs: Major repairs and minor construction may be ordered under the indefinite quantity portion of the contract. The awardee contractor shall be able to provide a licensed engineer for major repairs/ minor construction work. Major repairs and minor construction are subject to the Davis-Bacon Act.
2.19 Indefinite Quantity Work: Single repairs and minor construction from $2,001.00 to $250,000.00 may be ordered under the indefinite quantity portion of this contract. The contractor is responsible for minor incidental repairs under $2,001.00. Over $2,001.00 a request for proposal will be requested by the government if major repairs/ minor construction is required.
2.20 Damage to Government Property. The Contractor shall report all damages to U.S. Government property within one hour after occurrence. All damage caused by the Contractor shall be corrected by the Contractor at the Contractor’s expense without charge to the Government.
2.21 Occupational Safety and Health. The Contractor shall perform all work in strict accordance with the highest safety standards and applicable codes in order to eliminate the possibility of damage to installed machinery, equipment and building structures.
2.22 Lock Out Tag Out. The Contractor shall perform all necessary lock out/tag out in accordance with 29
CFR 1910.147 for the performance of this contract prior to the start of the cleaning process ensuring that all gas systems, electrical switches, and system components that may be accidentally activated shall be locked, pinned, protectively covered and/or sealed. All necessary lock out/tag out procedures shall be accomplished in conjunction with the Pentagon Mechanical and Electrical System Programs.
When all cleaning has been completed, the Pentagon Mechanical and Electrical System Programs shall return the system components to an operable state. All access doors utilized during cleaning shall be replaced and fastened.
2.23 Confined Space Entry. It is anticipated that the Contractor will need to enter some of the systems that are considered confined spaces to perform cleaning functions. Prior to performing any work, the Contractor shall file for and obtain a confined space entry permit from the Pentagon Safety and Environmental Management Branch (SEMB) (703-693-3683) for any bodily entry into the pit system for cleaning. The Pentagon SEMB office hours are from 0630-1700, M-F. The Contractor is responsible for providing necessary confined space training to the Contractor personnel in accordance with 29 CFR 1910.146 and shall provide documentation of referred training to Pentagon SEMB.
Permits will not be issued without proof of current training for all Contractor personnel involved in the confined space entry.
2.24 Fall Protection. The government will supply safe access to all access openings and fans. Where ducts or fans are located near the outside edges of buildings, OHSA approved fall restraint docking devices will be required by the Contractor. The Pentagon will work with the Contractor to properly place suitable docking devices.
2.25 Material Safety Data Sheets. The Contractor shall submit for approval the desired cleaning solution’s
Material Safety Data Sheets to the Pentagon Safety and Health Office prior to the commencement of cleaning activities. All material, chemical and liquids which require handling storage, containment and disposal shall be responsibility of the Contractor.
2.26 Waste Water Removal. The Contractor shall remove all debris and waste water generated from cleaning operations and dispose of the removed material at an approved off site location in accordance with local and federal waste disposal laws.
2.27 Contractor shall submit requests for Building Passes and vehicle entrance at least two weeks in advance for processing. Personnel that fail to meet required security clearances are not authorized to work on the Pentagon Reservation.
2.28 The Contractor shall participate in a monthly progress meeting to review all completed work, upcoming work, schedule, invoicing and payment and any other issues that may arise. The Contractor is responsible for maintaining minutes from the progress meetings and shall submit them to the COR for Government review within 48 hours of the meeting.
3. Government Furnished Items. The Government shall provide the following property services equipment in support.
3.1 Utilities. The Government will furnish electricity and water in the performance of services in this contract. The Government is not responsible for furnishing adaptors for connecting contractor-furnished equipment to government-furnished utilities.
4. Deliverables.
4.1 Schedule. The Contractor shall provide an integrated annual master schedule with all required cleanings.
4.1.1 The Contractor shall submit a schedule of services for Government review and acceptance for the contract option year within 30 calendar days of Notice to Proceed (NTP).
4.1.2 Any changes to the schedule shall be submitted to the COR for review and acceptance no later than 21 days prior to the change taking affect.
4.1.3 The schedule shall include the starting time and duration of cleaning activities.
4.1.4 The schedule shall accommodate tenant schedules and ongoing events in workspaces and adjacent areas.
4.1.5 The schedule shall be developed and maintained in MS Project and provided to the
Government in MS Project and Adobe formats.
4.2 The Contractor shall provide a written report/document within 24 hours after the cleaning of each system in this PWS verifying that cleaning was performed (in accordance with NFPA 96 for Kitchen Exhaust Systems). The report shall include any areas where cleaning could not be accomplished and why the cleaning was not accomplished. The report shall also include any system components that were found deficient during cleaning.
4.3 All written reports shall be submitted in electronic format to the COR.
5. Quality Assurance Surveillance Plan. The following Quality Assurance Surveillance Plan (QASP) has been developed to evaluate Contractor actions while implementing this SOW. It is designed to provide an effective surveillance method of monitoring Contractor performance for each listed objective on the Service Delivery Summary (SDS) in the maintenance contract. The QASP provides a systematic method to evaluate the services the Contractor is required to furnish. This QASP is based on the premise the government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.
5.1 QASP Responsibilities. The Contractor is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved. The Government will periodically evaluate the Contractor’s performance in accordance with the most recent edition of NFPA 96 and additional safety and documentation performance objectives outlined in Table 5. Inspections shall be conducted without notice. All issues found will be brought to the attention of the Contracting Officer.
5.2 QASP Application. In this contract the quality control program is the driver for product quality. The
Contractor is required to develop a comprehensive program of inspections and monitoring actions.
The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the Contractor to success. Careful application of the process and standards presented in the remainder of this document will ensure an effective quality assurance program.
5.3 Contractor Quality Control. The Contractor shall develop a Quality Control Plan and maintain a quality program to ensure cleaning services are performed in accordance with the NFPA Standard 96 and other commonly accepted commercial practices. The Contractor shall inspect, measure, and record grease accumulation depth before beginning work. The Contractor shall develop and implement procedures to assure work is being completed to the expected standards and identify and correct in a timely manner any non-conformance, unsafe, or inadequate workmanship. The Contractor must identify to the COR the specific quality control inspector to notify in case of customer complaints. The Contractor’s Quality Control Plan shall be submitted with the Proposal.
5.4 Surveillance. The Government Quality Assurance Inspector or third party inspector working on behalf of the Government may conduct post inspection cleaning assessments of the work completed in accordance with the most recent edition of NFPA 96. Work found unsuitable must be corrected by the Contractor within three working days of notification of the issues identified as unsatisfactory by the COR. This work correction i.e. re-cleaning, repairs, etc., shall be completed at no addition charge.
Table 5. Performance Objectives
Performance Objective SOW Sections
Performance Threshold
Perform Cleaning Services for Kitchen Duct and Exhaust Systems (including fans), Grease Trap Systems, Sewage Lift Stations and Sewage Holding Tanks. Systems are cleaned and procedures are followed as specified.
2.2, 2.3, 2.4, 2.5
No more than 1 documented failure to clean in accordance with NFPA 96, paragraph 2.3, 2.4 and 2.5 requirements or call back for additional cleaning based on the performance of a Quality Assurance check per quarter.
Posting Certification of Work.
2.13 No documented cases of missed posting
of the certification per year.
Perform Inspections.
Provide a written report/document within 24 hours after the cleaning of each system verifying that cleaning was performed in accordance with NFPA 96.
4.2
No more than 1 missed inspection/report within the specified timeframe per year.
Performance of Lock out/Tag out. 2.21 No documented cases of non-adherence to lock out/tag out procedures.
Obtaining Confined Space Entry Permit and proper confined space entry.
2.22 No documented cases non-adherence to
confined space procedures (both obtaining a permit and following confined space entry procedures).
1. General. The Contractor shall provide all labor, equipment, tools, materials and qualified supervision necessary to ensure that the kitchen exhaust systems, grease trap systems and sewage lift and holding systems are cleaned to bare metal and conc...
File details come from the government source that posted it. Updated .