HQ0034-14-R-0169.pdf

PDF 916 KB Posted

Attached to
CPO Coatings Training
Solicitation number
HQ0034-14-R-0169
Issued by

About this file

Solicitation HQ0034-14-R-0169

View the file

Other files

File Type Posted
HQ0034-14-R-0169_Amend_0002.pdf PDF
HQ0034-14-R-0169-0001.pdf PDF
Exhibit_1_-_PPQ.doc DOC document
Attachment_A.pdf PDF
Exhibit_3_-_Subcontracting_Plan_Format.docx DOCX document
Exhibit_2_-_Pricing.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

HQ0034-14-R-0169 26-Aug-2014

b. TELEPHONE NUMBER

703-545-8995

8. OFFER DUE DATE/LOCAL TIME

05:00 PM 26 Sep 2014

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

HQ00349. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANGELA S HUGHES

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SEE SCHEDULE

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

WHS - ACQUISITION DIRECTORATE

1225 SOUTH CLARK ST, SUITE 910

ARLINGTON VA 22202-3909

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE HQ0157 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

OSD AT&L

ANH LUAN HUYNH

5611 COLUMBIA PIKE

SUITE 05D15

FALLS CHURCH VA 22041

TEL: 703-697-3914 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$11,000,000.00

NAICS:

611430

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months

CPO Coatings Training - Base Year

FFP

Corosion Policy and Oversight (CPO) Corrosion Training on Applications of Coatings Technology - Base Year

PURCHASE REQUEST NUMBER: HQ015740730013000

NET AMT

000101 Lot

Funding for CLIN 0001

FFP

0002 1 Lot

Travel - Base

COST

Travel will be conducted in accordance with the PWS. The travel costs are to be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46 “Travel Costs,” the Joint Travel Regulations (JTR), and the Federal Travel Regulation (FTR).

ESTIMATED COST

000201

Funding for CLIN 0002

FFP

FOB: Destination

000202 Lot

Funding for CLIN 0002

FFP

PURCHASE REQUEST NUMBER: DODAAC41340751000

1001 12 Months

OPTION CPO Coatings Training - OY1

FFP

Corosion Policy and Oversight (CPO) Corrosion Training on Applications of Coatings Technology - Option Year 1

1002 1 Lot

OPTION Travel - OY1

COST

Travel for Option Year 1 will be conducted in accordance with the PWS. The travel costs are to be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46 “Travel Costs,” the Joint Travel Regulations (JTR), and the Federal Travel Regulation (FTR).

2001 12 Months

OPTION CPO Coatings Training - OY2

FFP

Coatings Technology - Option Year 2

2002 1 Lot

OPTION Travel - OY2

COST

Travel for Option Year 2 will be conducted in accordance with the PWS. The travel costs are to be reimbursed in accordance with Federal Acquisition

3001 12 Months

OPTION CPO Coatings Training - OY3

FFP

Coatings Technology - Option Year 3

3002 1 Lot

OPTION Travel - OY3

COST

Travel for Option Year 3 will be conducted in accordance with the PWS. The travel costs are to be reimbursed in accordance with Federal Acquisition

4001 12 Months

OPTION CPO Coatings Training - OY4

FFP

Coatings Technology - Option Year 4

4002 1 Lot

OPTION Travel - OY4

COST

Travel for Option Year 4 will be conducted in accordance with the PWS. The travel costs are to be reimbursed in accordance with Federal Acquisition

PERFORMANCE WORK STATEMENT

DOD CORROSION TRAINING ON APPLICATIONS OF COATINGS TECHNOLOGY

PERFORMANCE WORK STATEMENT

1. GENERAL

This is a non-personnel services contract to provide DOD Corrosion Training on Applications of Coatings Technology. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government.

1.1. DESCRIPTION OF SERVICES

The Contractor shall provide all personnel, equipment, supplies, facilities, tools, materials, supervision, and other items and non-personal services necessary to support DOD Corrosion Training on Applications of Coatings Technology as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The contractor shall perform to the standards of this contract.

1.2. BACKGROUND

The term “corrosion” as defined by congressional legislation refers to the deterioration of a material or its properties due to a reaction of that material with its chemical environment. This corrosion environment is substantial and nearly every aspect of Department of Defense (DOD) equipment and infrastructure world-wide are composed of materials susceptible to oxidation, stress, surface wear and other chemical and environmental mechanisms that cause corrosion.

Pursuant to Public Law 107-314 Section 1067, codified in 10 U.S.C. 2228, the Directorate of Corrosion Policy and Oversight (CPO), Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics (OUSD [AT&L]) is responsible for initiating and coordinating corrosion prevention, control and mitigation activities and policies across the DOD. The CPO directs and oversees the DOD Corrosion Prevention and Mitigation Program, a program initiated in response to meeting requirements set forth by the law. In order to implement strategies, determine objectives and develop and execute plans, procedures, and roadmaps, the DOD established an overarching Corrosion Prevention and Control Integrated Product Team (CPC IPT) with Working Integrated Product Teams (WIPT) across seven functional areas officiated by the CPO.

To support the CPO in the management of the diverse range of requirements, CPC IPT WIPTs are required to develop and continually update action plans associated with the following functional areas:

Corrosion Policy, Processes, Procedures and Oversight Metrics, Impact and Sustainment Science and Technology Outreach and Communications Facilities Training and Certification Specifications, Standards and Qualification Process

This contract supports the DOD Corrosion Prevention and Mitigation Strategic Plan (January 2014), specifically the mission of the Training and Certification WIPT (T&C WIPT) mission (reference Attachment A). Specifically, these contract activities directly address a primary T&C WIPT objective to “identify and properly educate and train every individual whose actions could measurably prevent or mitigate corrosion in the Department’s equipment and infrastructure.”

The corrosion training program described within this PWS intends to assist the CPO in carrying out requirements as described under 10 U.S.C 2228.

1.3. GENERAL OBJECTIVES

Once equipment is fielded or facilities are completed, these systems are subject to corrosion resulting from a wide-range of variables including age, usage and ravages of their operating environment. While a substantial return on investment normally occurs early during the acquisition design and procurement process, it remains essential that maintenance and sustainment personnel be adequately trained in corrosion identification, prevention and remediation in order to sustain the lifecycle of these systems. The DOD corrosion training approach therefore must encompass the following objectives:

a. Identify DOD personnel (officers, enlisted and civilians) across the acquisition, maintenance, and sustainment workforce at all levels of DOD systems management requiring corrosion education and training

b. Define the appropriate scope of required education and training and develop course curricula based on critical needs of the target student audience

c. Maintain compliance of corrosion education and training requirements as a result of changes to existing or issuance of new DOD initiatives, policies, and training requirements

d. Maintain viability and relevancy of corrosion education and training through reviews of and updates to (e.g., course content, training material, trainers and training sites) corrosion training curricula, including the integration of emerging technologies and industry trends

e. Analysis of student data to produce meaningful metrics that address current gaps in education and training capabilities, identify corrosion training trends across organizations, and determine the effectiveness of the corrosion training program as a whole

All Services provide varying types and levels of corrosion-related training to their members dependent on positions as assigned as well as their scope of duties and responsibilities.

Additionally, the CPO provides funding for DOD personnel to enroll in training classes related to corrosion prevention and mitigation to augment the individual Service training activities. This effort is necessary to support efforts for DOD agencies’ corrosion prevention and control requirements to sustain a workforce that is adequately trained in corrosion identification, prevention and remediation. Holding the primary responsibilities in the lifecycle maintenance of equipment and infrastructure across the DOD, the maintenance and sustainment community serve as the targeted training audience for this effort.

1.4. SCOPE

The scope of this contract provides corrosion training to DOD personnel in support of the DOD Corrosion Prevention and Mitigation Strategic Plan, section III, subsection E, paragraph 4, WIPT Policies, Mission, Objectives and Strategies: Training and Certification WIPT (Attachment A).

The corrosion training curriculum shall address the general areas of corrosion control, cathodic protection (CP), and coating inspection. This curriculum establishes a foundational understanding and the knowledge base required for a DOD workforce trained in the understanding of corrosion prevention and control issues for DOD equipment and infrastructure.

Curricula and associated courses developed and administered by the contractor shall be in compliance with applicable industry and DOD standards where appropriate.

The contractor shall provide and administer corrosion training curricula to DOD military and civilian personnel, and as required, work in coordination with the Government to update the curriculum to address specific DOD training requirements. Depending on the specific training topic, corrosion courses may include in-person classroom lectures, online coursework, or a combination of both. The contractor shall provide qualified instructors, services, materials, equipment, supplies and facilities necessary to administer the training and as required, administer course examinations. Any additional expenditure such as programmatic support requirements required for management and oversight shall be incorporated in the cost calculations for each individual training course within the curriculum.

The total number of DOD-funded students enrolled in corrosion training curricula fluctuates from year to year; however, a total of 504 DOD students per training year are estimated based on CPO’s historic execution of this activity. However, the number of DOD students able to participate in a particular training course or apply for re-certification in those courses within each fiscal year may vary.

The contractor shall maintain a repository for DOD student records which includes such data fields administrative, demographic, and details of training metrics to include enrollment, courses completed, and other relevant data. Those DOD personnel having successfully completed accredited corrosion training shall be provided appropriate documentation for the application of those course credits toward an accredited professional certification program recognized by applicable organizations across government, industry, and academic organizations.

1.5. PERIOD OF PERFORMANCE

Effective upon contract award, the period of performance shall be for an initial base year (BY) comprised of 12-months, and 4 additional option years (OY), as shown below in Table 1:

Contract Period of Performance.

Table 1: Contract Period of Performance

CONTRACT PERIOD START DATE END DATE

BASE YEAR AWARD DATE AWARD DATE + 365 DAYS

OPTION YEAR I AWARD END AWARD END + 365 DAYS

OPTION YEAR II OY I END OY I END + 365 DAYS

OPTION YEAR III OY II END OY II END + 365 DAYS

OPTION YEAR IV OY III END OY III END + 365 DAYS

1.6. GENERAL INFORMATION

1.6.1. PLACE OF PERFORMANCE

Work to be performed under this contract may be comprised of training facilities provided by the contractor located within the vicinity of DOD or Government installations in the continental United States (CONUS), as well as Hawaii and Alaska, or at a Contractor-chosen training facility at a CONUS location to which Government employees would travel. See Attachment B for possible training locations and estimated number of training classes per location (not an all-inclusive list). The contractor shall be responsible for the coordination of all necessary training facilities based on the requirements of each individual training course.

1.6.2. DISCLOSURE OF INFORMATION

Information made available to the contractor by the Government for the performance or administration of this effort shall be used only for those purposes and shall not be used in any way without the expressed written consent of the Contracting Officer (CO). Contractor and/or contractor personnel shall not divulge or release data or information developed or obtained in performance of this effort, until made public by the Government, except in the release of data or information to authorized Government personnel or upon written approval of the CO. The contractor shall not use, disclose, or reproduce proprietary data that bears a restrictive legend, other than as required in the performance of this effort. Nothing herein shall preclude the use of any data independently acquired by the contractor without such limitations or prohibit an agreement at no cost to the Government between the contractor and the data owner which provides for greater rights to the contractor.

The contractor agrees to assume responsibility for the protection and confidentiality of Government records, which is not considered public information. Each contractor or employee of the contractor to whom information may be made available or disclosed shall be notified in writing by the contractor that such information may be disclosed only for purposes and to the extent authorized herein. The contractor shall not release any information related to this contract to the public, media, or other unauthorized persons or organizations unless the Government has conducted the appropriate security review and granted written approval (e.g., information posted on a public website). Performance of this effort may require the contractor to access and use data and information proprietary to a Government agency or Government contractor which is of such nature that its dissemination or use, other than in performance of this effort, would be adverse to the interests of the Government and/or others.

1.6.3. NON-DISCLOSURE AGREEMENT

The contractor may be required to access to Confidential, Proprietary and/or Sensitive Information held by the government related to the tasks to be performed under this contract. In consideration of the government granting the contractor access to this information, a Non-Disclosure Agreement (NDA) shall be required between the contractor and the government. The terms and conditions are described in detail under Attachment C, NDA Form, of this document. This form shall be signed by all contract personnel working under this contract and submitted upon contract award. If contractors are replaced during the performance of this contract, then new contract employees shall sign the NDA Form upon beginning work.

1.6.4. ORGANIZATIONAL CONFLICT OF INTEREST

Contractor and sub-contractor personnel performing work under this contract may perform services which may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the CO immediately whenever it becomes aware that such access or participation may result in an actual or potential OCI and shall promptly submit a plan to the CO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may implement other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI. The OCI Form found in Attachment D shall be completed by the contractor and submitted with the proposal.

1.6.5. INVOICING

Invoicing shall occur on a monthly basis.

1.6.6. TRAVEL

All travel shall be coordinated through the CPO and approved by the Contracting Officer’s Representative (COR) prior to execution of travel. Travel will be reimbursed at actual cost in accordance with the limitation set forth in FAR 31.205-46, “Travel costs.” Profit and other fees shall not be applied to travel costs. The Contractor shall submit all travel receipts, along with an expense report spreadsheet breakdown of all items requesting reimbursement. All travel and per diem costs shall be in accordance with the Joint Travel Regulations (JTR) and the Federal Travel Regulation (FTR). See webpage http://www.defensetravel.dod.mil/site/travelreg.cfm for the current JTR and http://www.gsa.gov/portal/content/104790 for the current FTR. Per Diem rates may be found at http://www.gsa.gov/portal/content/104877. Local travel within the North Capital Region will not be reimbursed. The term "National Capital Region" means cities and other units of government within the geographic areas within the boundaries of the District of Columbia;

Montgomery and Prince Georges Counties in the State of Maryland; and Arlington, Fairfax, Loudoun, and Prince William Counties and the City of Alexandria in the Commonwealth of Virginia. Locations and duration of travel cannot be fully defined at this time; therefore, ceiling amounts for contractor travel are designated as separate, pre-populated not-to-exceed (NTE) contract line item numbers (CLINs) in the schedule.

http://www.defensetravel.dod.mil/site/travelreg.cfm http://www.gsa.gov/portal/content/104790 http://www.gsa.gov/portal/content/104877

1.6.7. QUALITY ASSURANCE SURVEILLANCE PLAN

The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure the Contractor has performed in accordance with the performance standards in the PRS found in Section 5 of this PWS. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.8. KICK-OFF MEETINGS

Within 10 business days following the contract award, the contractor shall attend a “Contract Kick- Off” meeting and a “Technical Kick-Off” meeting to review the contract terms and conditions and review the technical expectations under the contract. The two meeting locations will be determined after award. The contractor shall provide meeting minutes to the CO for the “Contract Kick-Off” meeting and to the COR for the “Technical Kick-Off” meeting no later than seven business days after each meeting.

2. SPECIFIC TASKS

Education and training in the processes and techniques necessary for effective corrosion prevention and mitigation is vital to the longevity of DOD equipment and infrastructure. These processes and techniques may include, but are not limited to washing, cleaning, painting, coating and preventative compound treatments; recognition/detection and interpretation of corrosion through visual observation and/or non-destructive testing; removal of corrosion from materials via mechanical and chemical means; repair of corroded structures and equipment; and reworking of materials and structures to restore corrosion-resistant properties. It also includes recognition of operational environment conditions that stimulate or hasten corrosion and understanding of means of storing, protecting and transporting equipment subject to corrosion.

The duties of the CPO and T&C WIPT include determining the corrosion prevention and control training needs of all members of the acquisition and sustainment workforce. Where appropriate, the training activities may be carried out in coordination with organizations in the private sector that are recognized by DOD as leading experts in corrosion training and certification. Under this requirement, the contractor shall support CPO and T&C WIPT activities as defined in the specific tasks below.

2.1. ADMINISTRATION OF COATINGS TECHNOLOGY TRAINING CURRICULUM

The contractor shall provide and administer corrosion training specifically to members of the DOD military and civilian workforce. The curriculum shall focus on applications of coatings technology related to corrosion prevention and control of corrosion and corrosion-related issues of equipment and facilities. In general, topics covered in this effort shall address the following themes as shown in Table 2.1 below: protective coating application, surface preparation (e.g., steel and concrete), and methods of inspection and quality control.

The specific method of delivery of training for this curriculum may include in-person classroom lectures, online coursework, or combination of both, depending on requirements of the specific training topic. The contractor shall be responsible for delivering course material, qualified instructors (Section 2.4, Instructor Qualifications), and as appropriate, any testing/examination material. In addition, the contractor shall be responsible for delivering the training using a method of delivery (e.g., training facility and/or via internet/online), as shown in the attached listing of required courses, which will be incorporated into this PWS upon award as Attachment E.

The suite of training topics to be provided by the contractor shall be of a depth and breadth to effectively address the following corrosion topics:

2.1 CATEGORY TOPICS COVERED

a PROTECTIVE COATING APPLICATION

Mixing and storage Measuring wet film thickness (WFT) Conventional, airless and plural component equipment operation Troubleshooting spray equipment Coating touch-up by brush and roll Understanding product data b

SURFACE PREPARATION

(STEEL AND CONCRETE)

Principles of surface preparation Surface preparation standards Evaluating job site conditions Primary components of an abrasive blasting system Abrasives and abrasive standards Nozzle equipment operations Mechanical cleaning methods Chemical or detergent cleaning methods Portable centrifugal (wheel) blast equipment operations Evaluating initial condition of surface Cleaning and repair before surface preparation Concrete surface preparation o Blast cleaning/shot blasting o Water cleaning/jetting acid etching and flame cleaning o Scarification/power tools

Water jetting equipment and productivity Safety c INSPECTION

Inspector roles and responsibilities Inspection and environmental safety Inspecting and testing abrasive blast media Safety hazard inspection Surface preparation equipment Surface preparation o Surface profile o Soluble salts

Coating types and characteristics Coating handling and application Coating inspection and defects Ambient and substrate conditions Inspection planning and documentation NAVSEA requirements Condition assessments d QUALITY CONTROL

Quality systems QCS qualifications and requirements Training and qualifications Technical resources Quality manuals and procedures Documentation and data control Calibration programs Contract document and specification review Work plans and process control procedures Inspection plans Inspection reports Internal audits

2.2. MAINTAINING STUDENT DATA AND TRAINING RECORDS

Over the life of the contract, the contractor shall maintain a data repository system and ensure the capture of and subsequent management of DOD student data. The contractor shall ensure that administrative, demographic, and if applicable, any previously completed or concurrent corrosion training courses, is captured prior to the execution of any training course. At a minimum, the contractor shall ensure that the data fields shown below in Table 2: Minimum Required Data Fields for DOD Students are captured for each DOD student. The contractor shall update the data repository system with a frequency no less than once per month.

Table 2: Minimum Required Data Fields for DOD Students

DATA FIELD DESCRIPTION

ADMINISTRATIVE Full Name Contact Information (e.g., Email Address, Phone Number, Office Address)

DEMOGRAPHIC

Organization Job Title/Position or Duty Assignment General Area of Responsibility (e.g., Acquisition Workforce, Maintenance/Sustainment, Facility/Infrastructure, Command/Command Support)

TRAINING RECORDS

Previous Training and Certifications (Including Course/Date Completed) Courses Currently Enrolled Courses Completed (Including Pass/Fail Data) End-of-Course Survey Results

2.3. CURRICULUM REVIEW

Through the life of the contract, contractor course development coordinators shall periodically engage with subject matter experts across academia, industry, and government on corrosion prevention and control topics. The nature of specifications and standards within the DOD and across industry is dynamic due to new and evolving technologies and practices, and to effectively integrate such changes requires continuous collaboration with corrosion subject matter experts.

These ongoing engagements are critical to ensuring that the curriculum continues to be relevant and adequate in meeting DOD-specific training requirements.

The government shall review and approve any proposed changes to the DOD-specific training curriculum prior to their implementation. This coordination process may be conducted informally and on an as-needed basis throughout the period of performance. However, a formal review of the corrosion training curriculum shall be conducted annually between the contractor and a reviewing committee comprised of members and/or representatives of the CPO and the

T&C WIPT.

2.3.1. ANNUAL CURRICULUM REVIEW

The contractor shall coordinate with the CPO for a mutually agreed upon time and date to conduct an annual curriculum review. The review shall occur no earlier than 90 days prior to the end date of the contract period of performance. It shall be the responsibility of the contractor to coordinate an appropriate time and date with the CPO to conduct the review.

The training curriculum shall be reviewed by a members and/or designated representatives of the CPO, T&C WIPT, contractor, and as necessary, other appropriate corrosion subject matter experts. The contractor shall update the training curriculum prior to reflect required changes prior to the execution of the subsequent option year period of performance. This annual review may occur via teleconference or in-person discussions as appropriate. Once completed, the contractor shall provide a written summary of these proceedings to the government. This summary may be included as part of the final report detailed in section 2.5.3 below.

2.4. INSTRUCTOR QUALIFICATION REQUIREMENTS

At a minimum, all designated course instructors shall meet the general qualification requirements described below in Table 3: Minimum Instructor Qualifications.

Table 3: Minimum Instructor Qualifications

EXPERIENCE DESCRIPTION

RELEVANT WORK Minimum 4-years of relevant work experience within the specific subject matter of the training to be provided

SUBJECT MATTER

EXPERTISE Comprehensive understanding and practical knowledge/application related training to be provided

TRAINING/INSTRUCTO

R

Documentation of successful completion of a formal instructor/trainer qualification program (may be from academic, industry, or government organization)

Demonstrated abilities instructing/training adult learners on technical and educational material

2.5. REPORTING

2.5.1. MONTHLY STATUS REPORTS

The contractor shall provide a monthly status report to the CPO. At a minimum, monthly reports to the CPO shall include metrics summarizing student enrollment and course completion data by category/topic and by individual course. Monthly status reports may also document any review of existing corrosion training courses to determine whether curriculum and materials require updating to reflect changes in DOD needs and/or trends in technology and industry, and any action related to such review. With the exception of the initial month, all subsequent reports should include metrics for the current month reported as well as the cumulative totals for prior months.

2.5.2. AD-HOC QUERIES

The contractor may be required to generate responses to ad-hoc administrative queries using data/information maintained in the student data repository system. These are required on an as-needed basis for general informational purposes and support to various CPO activities such as reports to CPO leadership, strategic planning, programmatic support, and engagements/meetings with other academic, industrial, and governmental entities.

2.5.3. FINAL REPORT

The contractor shall provide a final report on the last month of the period of performance to the CPO. The final report may be submitted in lieu of a monthly status report on the final month of the period of performance. At a minimal, the report shall include an executive summary of project highlights, summary of student/course metrics, any lessons learned along with their associated recommendations in the path forward, and other information deemed pertinent by the contractor. As referenced in section 2.3.1, the annual curriculum review summary may be included as part of this final report.

2.6. CONTRACTOR PROJECT MANAGEMENT PLAN

The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline, and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be provided at time of proposal submission, concurred upon and finalized within 10 business days after contract award, and updated as needed thereafter, but no less than annually.

3. GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

Government furnished property, equipment, or services is not provided nor required to perform work under this contract.

4. CONTRACTOR FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

The contractor shall provide all supplies, equipment, facilities, and services required to perform work under this contract.

4.1. FACILITY

The contractor shall provide appropriate training accommodations suitable for the administration of in-person/classroom-type training courses at a contractor-provided facility located within the vicinity of DOD installations CONUS, in addition to Hawaii and Alaska, or at a Contractor-chosen training facility at a CONUS location to which Government employees would travel.

4.2. MATERIALS

The contractor shall provide all required materials and equipment necessary to perform work under this contract. Specific training materials vary by topic and specific course requirements, but may include a combination of equipment, software, hardware, supplies (e.g., coursework materials, end-of-course surveys, course examinations), and associated administrative/logistical activities necessary to administer the training curriculum.

5. PERFORMANCE REQUIREMENTS

5.1. PERFORMANCE REQUIREMENTS SUMMARY

High-Level Objective: Develop a viable corrosion training program to support DOD military and civilian personnel across all levels of DOD systems management which empowers them with the foundation of knowledge and skillsets necessary to effectively manage corrosion and corrosion-related issues in support of DOD equipment and infrastructure systems.

5.1 PERFORMANCE

REQUIREMENT

PERFORMANCE

STANDARDS AQL/DEVIATION INSPECTION

METHOD

a

Attend “Contract Kick- Off” meeting and “Technical Kick-Off” meeting & provide minutes

Attended both meetings within 10 business days after award and provided minutes within 7 business days after each meeting

Deviation with approval from CO or

COR

Meeting attendance scheduled by CO and COR; review of minutes for “Contract Kick-Off” meeting by CO and for “Technical Kick-Off” meeting by

COR

b

Administer training curriculum on applications of coatings technology to DOD military and civilian personnel

Delivered course content adequately supports corrosion training needs for DOD students

Deviation with approval from COR

Review of training curriculum and course content:

i. Initial Review – During Source Selection by Evaluation Panel

ii. Subsequent Reviews – During Annual Curriculum Review by COR c Monthly status reports provide a summary of DOD student enrollment data and

Monthly Status Reports must provide updated information/data for the current reported month with

Deviation with approval from COR

Review of Monthly Status Reports by

COR

training metrics respect:

i. Student training metrics by category/topic and by individual courses (including course enrollment/ completion numbers)

ii. Training metrics based on cumulative totals of all previously monthly reports

iii. Documentation of any review of existing corrosion training courses to determine whether curriculum and materials require updating to reflect changes in DOD needs and/or trends in technology and industry, and any action or recommendation related to such review.

d

Maintain a regular cycle to the data repository for DOD students to ensure student data and records are up-to-date, accurate, and complete

≥ 1 update(s) per month;

DOD student records must include data fields outlined in Table 2

Deviation with approval from COR

Review of Monthly Status Reports and Ad-Hoc Query review at random intervals by

COR

e

Course instructors meet minimal qualification requirements

Instructors must meet or exceed requirements outlined in Table 3

No deviation authorized

Review of training curriculum and course content:

i. Initial Review – During Source Selection by

Evaluation Panel

ii. Subsequent

Reviews – During Annual Curriculum Review by COR

6. DELIVERABLES

All deliverables must meet professional standards and meet the requirements set forth in contractual documentation. It is the responsibility of the contractor for the delivery of all end products specified to the CPO. Specific deliverables under this task and date in which they must be delivered will be as mutually agreed upon between the Government and the contractor. Days identified below for deliverables are intended to be working days unless otherwise specified. All deliverables developed under this contract shall become the property of the U.S. Government with unlimited and unrestricted rights.

6.1. SCHEDULE OF DELIVERABLES

6.1 DELIVERABLE FREQUENCY MEDIUM / FORMAT SUBMIT TO PWS

REF

a

KICK-OFF

MEETING

MINUTES FOR

EACH

MEETING

Within 7 business days after each meeting

Electronic / MS Windows- Compatible Format CO & COR 1.6.7 b

ANNUAL

CURRICULUM

REVIEW

SUMMARY

REPORT

No later than 15 days prior to the end of the

POP

Mutually Agreed Upon Format CPO COR 2.3.1 c

MONTHLY

STATUS

REPORTS

No later than the 15th day after the end of each month

Electronic / MS Windows- Compatible Format CPO COR 2.5.1 d AD-HOC QUERIES As Requested Electronic / MS Windows-

Compatible Format CPO COR 2.5.2 e FINAL REPORT No later than the 15th day of the final month

Electronic / MS Windows- Compatible Format CPO COR 2.5.3 f

CONTRACTOR

PROJECT

MANAGEMENT

PLAN

With proposal and finalized within 10 business days after award. Updated as needed, but no less than annually.

Electronic / MS Windows- Compatible Format

CO - with proposal;

CPO COR -

after award

2.6

HQ0034-14-R-0169

ATTACHMENT A: DOD CORROSION PREVENTION AND MITIGATION STRATEGIC PLAN,

JANUARY 2014

(See attached file)

ATTACHMENT B: POSSIBLE TRAINING LOCATIONS

LOCATION POSSIBLE TRAINING LOCATION ESTIMATED FREQUENCY

PER YEAR

CONUS

CONTRACTOR-CHOSEN TRAINING

FACILITY 1

PHOENIX, AZ 1

SAN DIEGO, CA 4

LOUISVILLE, KY 1

JACKSONVILLE, FL 2

NEWINGTON, NH 3

PORTSMOUTH, NH 2

NORFOLK, VA 8

SEATTLE, WA 6

OCONUS HONOLULU, HI 4

OTHER WORLD-WIDE-WEB / ONLINE Ongoing / As- Required

ATTACHMENT C: NON-DISCLOSURE AGREEMENT FORM

NON-DISCLOSURE AGREEMENT

[AUG 2013 VERSION]

I, (Individual Name), (hereinafter RECIPIENT), an employee of (Company Name), a Contractor providing support services to the (Agency) and likely to have access to nonpublic information, agree to and promise the following:

WHEREAS RECIPIENT is engaged in delivering support services to (Agency) under (Task Order Number); and

WHEREAS it is the intention of (Agency) to protect and prevent access to and disclosure of nonpublic information, including but not limited to Planning, Programming, Budgeting and Execution (PPBE) information, to anyone other than employees of the United States Government and others who have a need to know, unless so authorized by the Contracting Officer's Representative; and

WHEREAS (Agency) acknowledges that RECIPIENT will have or require access to such nonpublic information in the course of delivering the contract services; and therefore, WHEREAS RECIPIENT will be given or otherwise have access to nonpublic information while providing such services; and finally, WHEREAS "nonpublic information" includes such information as PPBE information, proprietary information (e.g., information submitted by a contractor marked as proprietary), advance procurement information (e.g., future requirements, statements of work, and acquisition strategies), source selection information (e.g., bids before made public, source selection plans, and rankings of proposals), trade secrets and other confidential business information (e.g., confidential business information submitted by a contractor), attorney work product, information protected by the Privacy Act (e.g., social security numbers, home addresses and telephone numbers), and other sensitive information that would not be released by (Agency) under the Freedom of Information Act (e.g. PPBE data);

NOW THEREFORE, RECIPIENT agrees to and promises as follows:

RECIPIENT shall not seek access to nonpublic information beyond what is required for the performance of the support services contract;

RECIPIENT will ensure that his or her status as a contractor employee is known when seeking access to and receiving such nonpublic information from Government employees;

As to any nonpublic information to which RECIPIENT has or is given access, RECIPIENT shall not use or disclose such information for any purpose other than providing the contract support services, and will not use or disclose the information for any personal or other commercial purpose; and

If RECIPIENT becomes aware of any improper release or disclosure of such nonpublic information, RECIPIENT will advise the Contracting Officer's Representative in writing as soon as possible.

The RECIPIENT agrees to return any nonpublic information given to him or her pursuant to this agreement, including any transcriptions by RECIPIENT of nonpublic information to which RECIPIENT was given access, if not already destroyed, upon RECIPIENT leaving the contract.

RECIPIENT understands that any unauthorized use, release or disclosure of nonpublic information in violation of this Agreement will subject the RECIPIENT to administrative, civil or criminal remedies, as may be authorized by law.

****These provisions are consistent with and do not supersede, conflict with, or otherwise alter the employee obligations, rights, or liabilities created by existing statute or Executive order relating to (1) classified information,

(2) communications to Congress, (3) the reporting to an Inspector General of a violation of any law, rule, or regulation, or mismanagement, a gross waste of funds, an abuse of authority, or a substantial and specific danger to public health or safety, or (4) any other whistleblower protection. The definitions, requirements, obligations, rights, sanctions, and liabilities created by controlling Executive orders and statutory provisions are incorporated into this agreement and are controlling.****

SIGNATURE AND DATE

PRINTED NAME: ____________________________________________________

TITLE: _____________________________________________________________

EMPLOYER: ________________________________________________________

ATTACHMENT D: ORGANIZATIONAL CONFLICT OF INTEREST FORM

OCI ANALYSIS/ DISCLOSURE FORM

1. BPA Number HQ0034-14-C-xxxx

2. Program Title

3. Contractor Name and Address

4. Telephone Number and POC

5. Type of work to be performed under this agreement:

Other DSE Professional Services -related work requiring analysis and determination:

6. Contract Number and Program Title

7. Brief Summary/ Description of work performed under Block 6 action:

8. Relationship between requirements of Block 1 action and work performed under Block 6 action (If None, State Why):

9. Offeror/Contractor OCI Evaluation and Assessment (If either answer is yes, attach a copy of the SOW and complete Block 10):

(a) Does Actual OCI exist? ( ) Yes ( ) No

(b) Does Potential OCI exist? ( ) Yes ( ) No

10. Summary of actual/potential OCI, including actions planned to avoid, neutralize, or mitigate conflict or potential conflict:

11. Typed Name of Responsible Official

12. Signature

13. Date

14. Typed Name of Contracting Officer

15. Approval Signature

16. Date

INSTRUCTIONS FOR COMPLETING OCI ANALYSIS/ DISCLOSURE FORM

Blocks 1 through 5: Self explanatory

Block 6: Fill in the number and the short, official title by which the contract or subcontract requiring analysis and determination is formally known. This is work that has already been awarded, is being performed by your company, and requires a comparison with the work described in Blocks 1 – 5. NOTE: One OCI Analysis/ Disclosure Form shall be submitted for EACH related contract or subcontract currently being performed.

Block 7: Provide a brief, but specific, narrative summary of the SOW and work performed on the contract or subcontract listed in Block 6, including the period of performance and the value.

Block 8: Provide a brief, but specific, narrative summary of ANY relationship between the work to be performed under the action listed in Block 1 and the previous work performed under the action listed in Block 6. Please be as specific as possible by citing the specific RFP/SOW paragraph where possible.

Block 9: Place an “X” in the appropriate ( ) for your responses.

Block 10: If you answer yes to either 9(a) or to 9(b), provide a summary of the actual or potential OCI.

Blocks 11, 12, and 13: Provide the name of your company official with the responsibility for and/or authority to discuss and commit the company on matters related to OCI issues. That official should then sign and date each form.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

000101 Destination Government Destination Government

0002 Destination Government Destination Government

000201 Destination Government Destination Government

000202 Destination Government Destination Government

1001 Destination Government Destination Government

1002 Destination Government Destination Government

2001 Destination Government Destination Government

2002 Destination Government Destination Government

3001 Destination Government Destination Government

3002 Destination Government Destination Government

4001 Destination Government Destination Government

4002 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 30-SEP-2014 TO

29-SEP-2015

N/A OSD AT&L

ANH LUAN HUYNH

5611 COLUMBIA PIKE

SUITE 05D15

FALLS CHURCH VA 22041

703-697-3914

HQ0157

000101 N/A N/A N/A N/A

0002 POP 30-SEP-2014 TO

29-SEP-2015

N/A OSD AT&L

ANH LUAN HUYNH

5611 COLUMBIA PIKE

SUITE 05D15

FALLS CHURCH VA 22041

703-697-3914

000201 N/A N/A N/A N/A

000202 N/A N/A N/A N/A

1001 POP 30-SEP-2015 TO

29-SEP-2016

N/A OSD AT&L

ANH LUAN HUYNH

5611 COLUMBIA PIKE

SUITE 05D15

FALLS CHURCH VA 22041

703-697-3914

1002 POP 30-SEP-2015 TO

29-SEP-2016

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 30-SEP-2016 TO

29-SEP-2017

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 30-SEP-2016 TO

29-SEP-2017

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 30-SEP-2017 TO

29-SEP-2018

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 30-SEP-2017 TO

29-SEP-2018

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 30-SEP-2018 TO

29-SEP-2019

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 30-SEP-2018 TO

29-SEP-2019

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984

52.203-6 Alt I Restrictions On Subcontractor Sales To The Government (Sep 2006) -- Alternate I

OCT 1995

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

JUL 2013

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.209-7 Information Regarding Responsibility Matters JUL 2013

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.212-1 Instructions to Offerors--Commercial Items APR 2014

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2014

52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.217-5 Evaluation Of Options JUL 1990

52.219-8 Utilization of Small Business Concerns MAY 2014

52.219-25 Small Disadvantaged Business Participation Program-- Disadvantaged Status and Reporting

JUL 2013

52.222-3 Convict Labor JUN 2003

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-35 Equal Opportunity for Veterans SEP 2010

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.232-20 Limitation Of Cost APR 1984

52.232-33 Payment by Electronic Funds Transfer--System for Award Management

JUL 2013

52.233-3 Protest After Award AUG 1996

52.242-15 Stop-Work Order AUG 1989

52.243-2 Alt I Changes--Cost-Reimbursement (Aug 1987) - Alternate I APR 1984

52.246-4 Inspection Of Services--Fixed Price AUG 1996

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991

252.209-7001 Disclosure of Ownership or Control by the Government of a Terrorist Country

JAN 2009

252.219-7004 Small Business Subcontracting Plan (Test Program) JAN 2011

252.225-7001 Buy American And Balance Of Payments Program DEC 2012

252.225-7012 Preference For Certain Domestic Commodities FEB 2013

252.225-7031 Secondary Arab Boycott Of Israel JUN 2005

252.226-7001 Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.227-7015 Technical Data--Commercial Items FEB 2014

252.227-7028 Technical Data or Computer Software Previously Delivered to the Government

JUN 1995

252.227-7037 Validation of Restrictive Markings on Technical Data JUN 2013

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .