Performance_Work_Statement.pdf
PDF 564 KB Posted
- Attached to
- CTTSES 01-18 (Interpretation)
- Solicitation number
- HQ0013-18-Q-0050
- Issued by
-
Defense Security Cooperation Agency
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Near East South Asia Center for Strategic Studies
Performance Work Statement for
Simultaneous Interpretation Services Countering Transnational Threats Senior Executive Seminar 01-18
30 April – 11 May 2018
1. Purpose: This PWS details the tasks required for language and translation support services to the Near East South Asia Center for Strategic Studies to enhance stability in the Near East and in South Asia by providing an academic environment where strategic issues can be addressed, understanding deepened, partnerships fostered, defense-related decision-making improved, and cooperation strengthened among military and civilian leaders from the region and the United States.
Background: The Near East South Asia Center for Strategic Studies (NESA), an element of the Defense Security Cooperation Agency, is responsible for developing civilian and military specialists from the region of the Near East and in South Asia by providing professional seminars designed to meet the needs of mid-to-upper level military and civilian officials in the national security policy and strategy planning divisions of regional governments, to include but not limited to the Ministry of Interior; General Headquarters; Ministry of Defense; Ministry of Foreign Affairs and Foreign Police Force.
Executive Seminar: To assist NESA in fulfilling its responsibilities, contractors will provide interpretation/translation services & equipment to support a 10 day professional seminar to be hosted in the metropolitan Washington, DC and Virginia areas.
2. Scope: The contract requires expert language interpretation, interpretation equipment, on-site support and translation service into and from the following languages: Arabic, French, and Russian. The contractor will also provide an experienced project manager based on paragraph 5.
3. Approach:
Contractor shall provide interpretation and on-site support in accordance with PWS at the National Defense University (NDU). The contractor shall provide support according to the below setup configurations.
An on-site technician will be required from 30 April 2018 – 11 May 2018 to operate, trouble-shoot, set-up, and repair any problems with the equipment.
Equipment:
Plenary and Discussion group rooms with full size interpreter booths must be compatible with the Williams Sound IC-2 system. Set up by 1400 on 30 April 2018.
Portable interpretation equipment will be required for 60 participants and 6 interpreters 30 April – 11 May 2018. Provide to NESA Center by 1200 on 27 April 2018.
Plenary Room:
Two full-sized Booths required in Plenary Room LH 3210/3212 will require set-up on Monday, 30 April 2018 to be completed no later than 1400. Plenary will consist of 60 classroom style seating and 10 observer seats. These full size interpretation booths will be required to conduct French, English, Arabic, and Russian language interpretation (one permanent interpretation booth in place currently for a total of three booths).
The contractor shall provide interpreters, translation, equipment and a project manager for the following assignments: faculty lectures; speaker and panelist presentations; computer training;
seminar group sessions; simulation exercise and briefings; and possibly off-site visits and field trips with portable equipment. Interpretation services may be required for official dinners, evening events, and weekend tours. Participants will actively participate in plenary and working group discussion designed to analyze current and future requirements and develop practical proposals for near-term actions by governments to meet shared security challenges. A strict policy of non-attribution will be observed. This seminar will be conducted in English, Arabic, French, and Russian.
This is a firm fixed price service contract for interpretation services. Contractor shall provide all costs inclusive of labor, direct and indirect costs (including salaries; fringe benefits; overhead; and general and administrative expenses); equipment, non-personal services and profit necessary to perform interpretation services.
Discussion Rooms:
Three (3) discussion group rooms will require (2 each) booth for a total of (6 booths) setup on 30 April 2018 to be completed no later than 1600. Discussion group rooms will consist of 17 chairs around a square-shaped table. Minimum 8 microphones and 22 receivers per discussion group will be needed to complete this task order. Discussion group rooms LH 3115, LH 3107, and LH 3103 need to be set-up by 1600 on 30 April 2018.
A complete system will be setup in each discussion group room. Installation will include one microphone per two chairs, plus all receivers and transmitters that are necessary. Two full size interpretation booths are required per room for a total of 6 booths.
4. Task:
Task 1: Simultaneous Interpreters
The Contracting Officer or the representative (COR) will define changes or adjustments in the “Language Agenda” to be provided to the contracted project manager at least 5-working days in advance of the seminar. The contractor will assign a team of three interpreters. Exact number of interpreters will be noted on the “Language Agenda.”
Seminars and sessions require continuous effort. Sessions requiring interpreters usually begin at 0900 and last until 1630 depending on daily schedule. Two 30 minute breaks will be given for rest.
The COR reserves the right to make changes or adjustments to the actual start time of the workday.
Contractor is to ensure that interpreters are to dress in “business attire,” Business attire includes a collared shirt with tie along with dress pants/trousers. Jeans, athletic gear, and or tennis shoes are not permitted to be worn during hours of work.
CT Senior Executive Seminar = 10 working days x 2 Arabic interpreters; 10 working days x 2 French interpreters; 10 working days x 2 Russian interpreters; = 60 days.
4 Half Days (1400-1600) x2 Arabic interpreters; x2 French interpreters; x2 Russian interpreters to support breakout groups. 2, 3, 8, 9 May 2018 Six (6) interpreters (2 per language) needed for Registration and DC Tour on Monday, 30 April 2018;
Six (6) interpreters (2 per language) needed for Welcome Luncheon (1200-1330) Tuesday, 1 May 2018.
Six (6) interpreters (2 per language) needed for Director’s Dinner on Thursday, 10 May (1900- 2100). See Schedule for additional requirements, items 25-26.
Please review the Schedule of Service (attached). Holidays most likely will not be during seminar session days, but Government reserves the right to use the interpreters on a holiday as an emergency seminar day such as make up for inclement weather. Interpreters must be available to go to any training location in the Metro area if NESA must relocate training.
Interpreters will switch out of the simultaneous booths every 20-30 minutes in plenary sessions in accordance with established industry standards.
Performance Objective No. 1: Contractor to provide simultaneous certified interpreters.
Performance Measurement No. 1: Simultaneous interpretation services.
Performance Standard No. 1: English/Arabic; English/French; English/Russian
The contractor is required to provide interpretation services for an official evening events for this seminar. The assignments is for two (2) hours.
Most site events require face to face or whisper microphone usage.
COR will notify the contractor at least three (3) days in advance for interpretation services for non-scheduled seminars and other important events. In each case, the number of interpreters will be determined by the specific requirements for each event, and the contractor will assign interpreters based on the specific requirements. In the event that additional services are required for events/excursions not covered in the current line item structure, the contractor will be asked to submit a new proposal for the additional services.
Minimum Acceptability Standards
The contractor will ensure that all interpreters possess a Bachelor Degree and have copies of proficiency certification.
Certification shall be as a court interpreter, through the Department of State
Interpreters Examination or accreditation as an interpreter from a school of languages and linguistics.
Advanced Certification is preferred. Simultaneous Interpreters must have a minimum of 3 years of professional/formal simultaneous interpreting experience in international conferences and seminars.
Interpreters must have experience with defense-related terms/ DOD
Terminology and must be able to interpret “all dialogue.” When attending these seminars, participants will be introduced and will need to know exactly who they are sharing dialogue with throughout the course of the seminar, their titles, backgrounds and government affiliations.
NOTE:
At the discretion of the Program Office, simultaneous interpretation testing may be required on all interpreters prior to any interpreter performing interpretation services before or after award either on the phone or at the NESA location. NESA staff interpreters can determine if an interpreter cannot perform their duties due to lack of proficiency, experience or incompetent.
Substitutions: In the event an interpreter must be replaced after award of the contract, the contractor must abide by the same requirements as those listed under the Technical Capability of the solicitation and Performance Work Statement. Credentials and resume must accompany the interpreter on the first work day when last minute substitutions are made and must be approved by the Program Office.
To maintain the integrity of NESA’s branding efforts, all interpreters must present themselves in a professional manner at all times, display the highest standards of personal deportment and judgment; demonstrate organizational abilities and excellent communication skills; possess the ability to interact with senior foreign representatives and preclude from providing any personal opinions. Additionally, interpreters are only allowed to ask questions of speakers within confines of clarification interpretation clarification purposes as professionally necessary.
The Contracting Officer reserves the right to require that the contractor remove and replace, within one working day, an interpreter who, in his judgment, is not qualified or who does not maintain the highest standards of professional conduct.
Should the performance of work include entry to The Pentagon, Capitol Hill or Department of State, interpreters who are not US citizens must be able to provide their passport along with a state ID or driver’s license for identification purposes at time of location visit.
4.2 Task 2 Manpower Reporting Requirement:
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for DSCA via secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported anytime during FY, all data shall be reported no later than October 31 of each calendar year. Contractor may direct question to the help desk at http://www.ecmra.mil/
5. Task - Project Manager: The contractor shall assign a project manager on site who has had substantive experience in personnel management, logistics planning and administration in a seminar environment. The project manager shall display the highest standards of personal deportment and judgment; possess demonstrated organizational abilities and excellent communication skills. It is essential that the project manager have a working knowledge of the Washington, D.C. diplomatic and military organizations and the ability to interact with senior foreign representatives. The project manager acts as the single point of contact for all activities pertaining to interpreters, and interpretation equipment for the NESA COR.
The COR will provide the contractor with the materials and information necessary for the proper performance of work, to include schedules, agendas, and guidelines.
The project manager and COR may be required to meet at least 2 days prior to finalize the service schedule.
The project manager will immediately inform the COR of any issues, problems, or concerns that pertain to participants, guests, or scheduled activities.
6. Location of Performance: Work performed under this task order will be performed at US Government-owned facilities or US Government-leased facilities. NESA is located at the National Defense University, 300 5th Ave SW Building 64, Lincoln Hall, Washington, D.C 20319. Contracted interpreters must be immediately accessible, in person; in the greater Washington metropolitan area for the duration of the seminar. The contractor will perform services at the NESA offices and other sites as designated on the agenda schedule. For excursions that are out of town and/or on weekends, the interpreters will accompany participants on the bus. The contractor shall be able to perform services at any location within the Washington metropolitan area that the Government deems a need emergency training site.
7. Period of Performance: The period of performance is from 30 April 2018 – 11 May 2018.
8. Local Travel: Parking is provided for contractors privately owned vehicles on Fort McNair.
Travel may be required in the performance of designated tasks and duties, to include supporting seminar sessions, conducting training sessions, and supporting off-site events.
9. Security: Interpreters must bring a Government photo ID or Driver’s License to process visitor badges.
10. US Government Furnished Facilities, Equipment, Materials, and Support Functions:
NESA will provide office supplies and materials, to include access to telephones, copying machine, fax machine, and personal computers to support these contracted periods and NESA official business only. Other support will be provided to contract employees as required performing the contract tasks. NESA will provide access to those documents and files that are relevant to the project and that are required to perform the tasks specified in the contract. NESA personnel will provide such assistance and information as is appropriate and necessary for liaison functions and for the contractor employees’ performance of the task order.
11. Invoicing Procedures:
Invoices are to be submitted electronically via the Internet through Wide Area Work Flow- Receipt and Acceptance (WAWF-RA) system at https://wawf.eb.mil. Contractors must create two documents (Invoice and Receiving Report; i.e. Combo Documents) with a single data entry session.
All communication will occur between the contractor and the contracting officer. Any requirements from NESA must be addressed to the Contract Specialist, Service Schedule:
Estimated hours per day 8:00am-4:00pm – Times subject to change Evening currently scheduled are subject to change.
CLIN: SERVICE QUANTITY UNIT UNIT
PRICE
TOTAL
0001 2 – ARABIC
Interpreter
30 April for
Registration, and
DC Tour
2 x 1 Days
*portable devices needed
2 DAY
0002 2 – FRENCH
Interpreter
30 April for
Registration, and
DC Tour
2 x 1 Days
*portable devices needed
2 DAY
0003 2-RUSSIAN
Interpreter
30 April for
Registration, and
DC Tour
2 x 1 Days
*portable devices needed
2 DAY
0004 2 – ARABIC
Interpretation
1-3 May; 7-11 May
16 DAYS
2 x 8 days
08:30-4:30 pm
0005 2 – FRENCH
Interpretation
1-3 May; 7-11 May
2 x 8 days
08:30-4:00 pm
16 DAYS
0006 2 – RUSSIAN
Interpretation
1-3 May; 7-11 May
2 x 8 days
08:30-4:30 pm
16 DAYS
0007 2- ARABIC
Interpretation
1 May for
Welcome
Luncheon
(working Lunch)
1200PM-1:30PM
2 DAYS
0008 2- FRENCH
Interpretation
1 May for
Welcome
Luncheon
(working Lunch)
1200PM-1:30PM
2 DAYS
0009 2- RUSSIAN
Interpretation
1 May for
Welcome
Luncheon
(working Lunch)
1200PM-1:30PM
2 DAYS
0010 2-ARABIC-
ADDITIONAL FOR
BREAKOUT
DISCUSSION
GROUPS
2-3; 8-9 May
1430-1600
8 DAYS
0011 2-French-
ADDITIONAL FOR
BREAKOUT
DISCUSSION
GROUPS
2-3 May; 8-9 May
1430-1600
8 DAYS
0012 2-Russian-
ADDITIONAL FOR
BREAKOUT
DISCUSSION
GROUPS
2-3 May; 8-9 May
1430-1600
8 DAYS
0013 2 – ARABIC
Interpretation
4 May
8:30am – 12:30 pm
2 x 1 day
DAYS
0014 2 – FRENCH
Interpretation
4 May
8:30am – 12:30
0015 2 – RUSSIAN
Interpretation
4 May
8:30am – 12:30
0016 2–ARABIC-
Interpretation on
10 May Director’s
Dinner from
7:00pm – 9:00pm
*portable devices needed
2 EACH
0017 2–FRENCH 2 EACH
Interpretation on
10 May Director’s
Dinner from
7:00pm – 9:00pm
*portable devices needed
0018 2 –RUSSIAN
10 May Director’s
Dinner from
7:00pm – 9:00pm
*portable devices needed
2 EACH
0019 EQUIPMENT-8
BOOTHS
(2-PLENARY) (2
FOR EACH BREAK
OUT ROOM (3))
10 DAYS
0020 EQUIPMENT-
WILLIAM SOUND
TRANSMITTERS
(8) (2-PLENARY)
(2 FOR EACH
BREAK OUT
ROOM)/CONTROL
UNIT
10 DAYS
0021 EQUIPMENT-48
RECEIVERS
(16 PER EACH
BREAKOUT
ROOM)
10 DAYS
0022 EQUIPMENT-10
MICROPHONES
(PER BREAKOUT
ROOM)
10 DAYS
0023 EQUIPMENT-
LABOR 2-
PROFESSIONAL
TECHNICIANS TO
INCLUDE SET-UP
30 April AND
DISMANTLE 11
May
10 DAYS
0024 EQUIPMENT-
POWERED
SPEAKER MIXERS
10 DAYS
0025 Equipment
Portable headsets
55 and 6 transmitters
Monday 30 April at Lodging
10 DAYS
GRAND TOTAL $
The following additional services are needed, we will notify if any changes are made.
File details come from the government source that posted it.