Questions_and_Answers_for_Wallpaper_Project.doc

DOC document 24 KB Posted

Attached to
Wallpaper and Paint at Wright Patterson AFB
Solicitation number
HQ0013-14-T-0015
Issued by

About this file

Questions and Answers to wall paper project

View the file

Other files

File Type Posted
wall_paper_pictures.pdf PDF
Wall_paper_Site_Visit.txt TXT text file
hq0013-14-T-0015.pdf PDF
Floor_PLan_for_Wallpaper_Project.pdf PDF
Site_Visit_Information_-_Wright_Patterson_Attachment_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. What are the required work hours? Normal business hours or after hours (2nd or 3rd shift)?

First floor and 2nd floor can be done during normal duty hours. 3rd floor must be coordinated with project manager Margaret Williams so as not to disrupt classes.

2. When the existing wallpaper was installed, was the existing wall primed?

Don't know. Wallpaper was put up in 2002.

3. How are we to obtain access to the existing wallpaper that is located above the curved metal lay-in ceiling?

1. What are the required work hours? Normal business hours or after hours (2nd or 3rd shift)?

First floor and 2nd floor can be done during normal duty hours. 3rd floor must be coordinated with project manager Margaret Williams so as not to disrupt classes.

2. When the existing wallpaper was installed, was the existing wall primed?

Don't know. Wallpaper was put up in 2002.

3. How are we to obtain access to the existing wallpaper that is located above the curved metal lay-in ceiling?

Contractors are to give us an idea for wallpapering without taking down metal ceiling.

4. What items need to be removed from the walls? Signage, TV's, etc.?

Who is to remove it if it is required?

During the site visit it was noticed that the following items were not included in the Statement of Work and will need to be removed, reinstalled and/or relocated to perform the wallpaper removal and installation: Vending Machines, Room Signs, Framed Artwork/Photos, Bulletin/Notice Boards, Television, Decorative Lettering and other misc. items. Will these items be removed, reinstalled and/or relocated by others or should we include this work currently not in the statement of work in our estimated price?

DISAM will take down: signage, TVs, pictures, lettering and move vending machines etc. (We will need some led time for this)

4. What items need to be removed from the walls? Signage, TV's, etc.?

Who is to remove it if it is required?

During the site visit it was noticed that the following items were not included in the Statement of Work and will need to be removed, reinstalled and/or relocated to perform the wallpaper removal and installation: Vending Machines, Room Signs, Framed Artwork/Photos, Bulletin/Notice Boards, Television, Decorative Lettering and other misc. items. Will these items be removed, reinstalled and/or relocated by others or should we include this work currently not in the statement of work in our estimated price?

DISAM will take down: signage, TVs, pictures, lettering and move vending machines etc. (We will need some led time for this)