HOLD_for_prevailing_wage.docx
DOCX document 13 KB Posted
- Attached to
- B027-20 Streetlight Maintenance
- Solicitation number
- B027-20
- Issued by
- New Haven County, Connecticut
About this file
Summary
This is a prevailing wage hold document related to a streetlight maintenance contract opportunity for the City of Meriden, Connecticut. The document indicates that prevailing wage requirements are pending determination or have been placed on hold pending final clarification. The contract (B027-20) involves inspection, inventory, maintenance, and repair services for the City's street light network, which consists of approximately 4,200 LED cobra head streetlights installed in 2016, 300 LED decorative streetlights, 100 LED post top streetlights mounted on fiberglass poles, 50 non-LED flood lights, and 750 poles with mostly underground electric service. The streetlight maintenance services represent a significant municipal infrastructure management initiative for the Connecticut municipality.
The prevailing wage hold status suggests that wage requirements applicable to this contract remain under review or await final documentation before bid submission and contract award. Contractors bidding on this opportunity should anticipate that prevailing wage determinations will be established and made applicable to the work performed. The hold notation indicates that complete contract details, including final prevailing wage rates, labor classifications, and associated compensation requirements, may be pending release to prospective bidders. Interested contractors should monitor for updates regarding the finalization of prevailing wage schedules before preparing their bid submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEST
File details come from the government source that posted it. Updated .