hialeah g 639207425069630000.pdf
PDF 324 KB Posted
- Solicitation number
- R.F.Q. 2026-04
- Issued by
- Miami-Dade County, Florida
About this file
This Request for Qualifications (RFQ) is issued by the City of Hialeah Gardens Water and Sewer Department to establish a pre-qualified pool of professional engineering firms for continuing services on an as-needed basis. The City seeks qualified firms to provide comprehensive engineering services including water distribution design and analysis, wastewater collection system design and rehabilitation, utility planning and master planning, engineering design and permitting, regulatory compliance assistance, construction phase services, funding assistance for state and federal programs, and specialized services such as SCADA design, electrical engineering, structural engineering, and emergency response. Services will be assigned through individual Work Orders or Task Authorizations with no guaranteed minimum volume. The solicitation follows the Consultants' Competitive Negotiation Act under Florida Statutes Section 287.055. Statements of Qualifications must be received by Monday, August 10, 2026, at 4:00 PM, addressed to Maria L. Joffee, City Clerk, in Hialeah Gardens, Florida. The initial agreement term is three years with two optional one-year renewals, subject to City Council approval.
Firms must be registered to practice engineering in Florida with a current Certificate of Authorization from the Florida Board of Professional Engineers and demonstrate experience with municipal water and wastewater utilities, Florida Department of Environmental Protection requirements, and Miami-Dade County agencies. Submittals require one original and five copies including cover letter, firm profile, qualifications, at least five similar projects completed within the last ten years, project team resumes, technical capabilities description, current workload capacity, three municipal references, and all required forms. The evaluation criteria totaling 100 points assess firm qualifications (25 points), relevant municipal experience (25 points), project team qualifications (20 points), past performance and references (15 points), capacity and availability (10 points), and local knowledge and regulatory experience (5 points). Prior to contract execution, selected firms must provide certificates of insurance for Commercial General Liability, Professional Liability, Workers' Compensation, and Automobile Liability, and must comply with Florida E-Verify requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
[1]
REQUEST FOR QUALIFICATIONS
CITY OF HIALEAH GARDENS
WATER AND SEWER DEPARTMENT
RFQ No. 2026-04
CONTINUING PROFESSIONAL ENGINEERING SERVICES
[2]
Table of Contents
1. INTRODUCTION
2. PURPOSE
3. SCOPE OF WORK
3.1. WATER DISTRIBUTION
3.2. WASTEWATER COLLECTION
3.3. UTILITY PLANNING
3.4. ENGINEERING DESIGN
3.5. REGULATORY COMPLIANCE
3.6. CONSTRUCTION PHASE SERVICES
3.7. FUNDING ASSISTANCE
3.8. FUNDING ASSISTANCE .............................................Error! Bookmark not defined.
4. MINIMUM QUALIFICATIONS
5. TERM OF AGREEMENT
6. METHOD OF ASSIGNMENT
7. SUBMITTAL REQUIREMENTS
7.1. COVER LETTER
7.2. FIRM PROFILE
7.3. QUALIFICATIONS
7.4. PROJECT EXPERIENCE
7.5. PROJECT TEAM
7.6. TECHNICAL CAPABILITIES
7.7. CURRENT WORKLOAD
7.8. REFERENCES
7.9. REQUIRED FORMS
8. EVALUATION CRITERIA
9. SHORTLISTING
10. NEGOTIATIONS
11. INSURANCE REQUIREMENTS
[3]
12. E-VERIFY
13. PUBLIC RECORDS
14. CONFLICT OF INTEREST
15. RESERVATION OF RIGHTS
16. QUESTIONS
17. SUBMITTAL DEADLINE
18. ANTICIPATED SERVICES
[4]
1. INTRODUCTION
The City of Hialeah Gardens ("City") is requesting Statements of Qualifications (SOQs) from qualified engineering firms to establish a pool of pre-qualified firms capable of providing continuing professional engineering services on an as-needed basis for the City's
Water and Sewer Department.
Selected firms will provide professional engineering, consulting, planning, design, permitting, construction administration, inspection, grant assistance, and related services for various utility infrastructure projects.
Selection under this RFQ does not guarantee any minimum amount of work. Services will be assigned on an as-needed basis through individual Work Orders or Task Authorizations.
This solicitation is being conducted in accordance with the Consultants' Competitive
Negotiation Act (CCNA), Section 287.055, Florida Statutes.
2. PURPOSE
The purpose of this RFQ is to create a pool of qualified engineering firms to provide professional engineering services for the planning, design, permitting, construction administration, and implementation of water and wastewater utility projects.
The City anticipates selecting multiple firms to provide services over the term of the agreement.
3. SCOPE OF WORK
Selected firms may be requested to perform services including, but not limited to:
3.1. WATER DISTRIBUTION
• Water main design
• Water main replacement
• Water system modeling
• Hydraulic analysis
• Pressure evaluations
• Fire flow analysis
• Water quality studies
[5]
• Water treatment improvements
• Pump station improvements
• Water storage facilities
3.2. WASTEWATER COLLECTION
• Gravity sewer design
• Force main design
• Lift station rehabilitation and replacement
• Sewer rehabilitation
• Manhole rehabilitation
• Inflow and infiltration (I&I) studies
• Capacity assessments
• Flow monitoring
• Sewer modeling
3.3. UTILITY PLANNING
• Master planning
• Capital Improvement Plans (CIP)
• Utility system assessments
• Asset management
• GIS integration
• Rate studies
• Utility operational evaluations
3.4. ENGINEERING DESIGN
• Preliminary Engineering Reports (PER)
• Basis of Design Reports
• Construction drawings
• Technical specifications
• Engineer's Opinion of Probable Cost
• Bid document preparation
[6]
• Value engineering
3.5. REGULATORY COMPLIANCE
• FDEP permitting
• Miami-Dade County DERM permitting
• Miami-Dade Water & Sewer Department coordination
• Environmental permitting
• Utility coordination
• Regulatory compliance assistance
3.6. CONSTRUCTION PHASE SERVICES
• Construction administration
• Shop drawing review
• RFI responses
• Site inspections
• Progress meetings
• Pay application review
• Change order evaluation
• Final inspections
• Record drawings
3.7. FUNDING ASSISTANCE
• State Revolving Fund (SRF)
• FEMA
• Resilient Florida
• Community Development Block Grants
• Federal grants
• Grant administration support
3.8. SPECIALIZED SERVICES
• SCADA design
• Instrumentation and controls
[7]
• Electrical engineering
• Structural engineering
• Geotechnical engineering
• Surveying coordination
• Utility locating coordination
• Condition assessments
• Leak detection support
• Asset management
• Emergency engineering services
4. MINIMUM QUALIFICATIONS
Interested firms shall demonstrate:
• Registration to practice engineering in the State of Florida.
• Current Certificate of Authorization issued by the Florida Board of Professional
Engineers.
• Experience providing engineering services for municipal water and wastewater utilities.
• Experience with Florida Department of Environmental Protection requirements.
• Experience working with Miami-Dade County agencies is preferred.
• Ability to provide services within established schedules.
• Sufficient staff and resources to perform assigned work.
5. TERM OF AGREEMENT
The initial agreement shall be for three (3) years with the option of two (2) one-year renewals, subject to City Council approval.
6. METHOD OF ASSIGNMENT
Projects shall be assigned on an as-needed basis.
Depending upon the size, complexity, and specialization required, the City may:
• Select the most qualified firm for a specific project;
[8]
• Request proposals from one or more firms within the pool;
• Negotiate scope and fee pursuant to the CCNA process.
The City reserves the right to utilize any qualified firm in the pool based upon project requirements.
7. SUBMITTAL REQUIREMENTS
Interested firms shall submit one (1) original, five (5) copies, containing the following:
7.1. COVER LETTER
Signed by an authorized representative.
7.2. FIRM PROFILE
Include:
• Firm history
• Office locations
• Years in business
• Ownership information
• Number of employees
7.3. QUALIFICATIONS
Describe experience providing municipal engineering services including:
• Water systems
• Wastewater systems
• Utility infrastructure
• Municipal projects
7.4. PROJECT EXPERIENCE
Provide at least five (5) similar projects completed within the last ten (10) years.
Include:
• Client
• Project description
• Construction cost
[9]
• Services provided
• Completion date
• Client contact
7.5. PROJECT TEAM
• Provide resumes of key personnel, including
• Project Manager
• Professional Engineers
• Discipline Leads
• Support Staff
7.6. TECHNICAL CAPABILITIES
• Describe capabilities related to:
• Utility modeling
• GIS
• SCADA
• Survey coordination
• Construction administration
• Permitting
• Grant assistance
7.7. CURRENT WORKLOAD
Describe the firm's ability to perform additional work.
7.8. REFERENCES
Provide at least three municipal references.
7.9. REQUIRED FORMS
Include all forms contained within this RFQ.
[10]
8. EVALUATION CRITERIA
Criteria Points
Firm Qualifications 25
Relevant Municipal Experience 25
Project Team Qualifications 20
Past Performance & References 15
Capacity & Availability 10
Local Knowledge & Regulatory Experience 5
Total 100
9. SHORTLISTING
The Evaluation Committee may:
• Rank firms based solely upon submitted qualifications;
• Conduct interviews;
• Request additional information.
The City reserves the right to waive interviews if deemed unnecessary.
10. NEGOTIATIONS
The City shall negotiate with the highest-ranked firm(s) in accordance with Section 287.055, Florida Statutes.
If negotiations fail, negotiations may be terminated and commenced with the next highest-ranked firm.
11. INSURANCE REQUIREMENTS
Prior to execution of any agreement, selected firms shall provide certificates of insurance meeting City requirements, including:
• Commercial General Liability
• Professional Liability (Errors & Omissions)
• Workers' Compensation
[11]
• Automobile Liability
Coverage limits shall comply with City requirements.
12. E-VERIFY
The successful firms shall comply with Section 448.095, Florida Statutes, regarding
E-Verify.
13. PUBLIC RECORDS
All documents submitted become public records pursuant to Chapter 119, Florida Statutes.
14. CONFLICT OF INTEREST
Firms shall disclose any actual or potential conflicts of interest.
15. RESERVATION OF RIGHTS
The City reserves the right to:
• Reject any or all submittals.
• Waive informalities.
• Request clarification.
• Cancel this solicitation.
• Select any number of firms.
• Re-advertise the solicitation.
• Negotiate with one or more qualified firms.
16. QUESTIONS
Questions regarding this RFQ shall be submitted in writing to:
• Kristopher Perez
Director, Water and Sewer Department
City of Hialeah Gardens
13601 NW 107th Avenue Hialeah Gardens, FL 33018
Email: KPerez@cityofhialeahgardens.com
[12]
17. SUBMITTAL DEADLINE
Statements of Qualifications must be received no later than:
Date: Monday, August 10, 2026
Time: 4:00 PM
Attn: Maria L. Joffee, City Clerk 10001 N.W. 87 Avenue Hialeah Gardens, Florida 33016
18. ANTICIPATED SERVICES
Projects may include, but are not limited to:
• Water main replacements
• Sewer rehabilitation
• Lift station improvements
• Water quality improvements
• Utility relocation
• Pump station design
• Water and wastewater master plans
• SRF-funded projects
• FEMA-funded projects
• Emergency utility repairs
• Utility modeling
• Asset management
• SCADA improvements
• Condition assessments
• New utility infrastructure
• Utility permitting and regulatory compliance
• Construction administration and inspection support
File details come from the government source that posted it. Updated .