TEC.pdf

PDF 19 KB Posted

Attached to
Automated and Unbiased Stereological and Quantitative Neuron Matrix Analysis System
Solicitation number
HHS-NIH-NIDA-SSSA-CSS-2017-476
Issued by

About this file

Technical Evaluation Criteria

View the file

Other files

File Type Posted
PD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION ATTACHMENT

Brand name or Equal Automated and Unbiased Stereological and Quantitative Neuron Matrix Analysis System for the Synaptic Function Section

ATTACHMENT 1: Technical Evaluation Criteria

The Government will award a contract resulting from this requirement on the basis of best value, technical factors and price considered. All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.

Factor 1: Automated and Unbiased Stereological and Quantitative Neuron Matrix Analysis System Capability

The contractor shall detail in its technical proposal how it shall meet each of the project requirements. This shall include detailed specifications and capabilities of the offered Neurolucida and Stereo Investigator System or equal system, compatibility and integration capabilities with an existing Nikon Ti-E microscope and options for software updates and technical support. Technical approach shall be evaluated for the ways in which the proposed Neurolucida and Stereo Investigator System or equal system meets or exceeds the requirement. Exceeding requirements shall be considered favorably.

Factor 2 Delivery, Installation and Training

The contractor shall detail in its technical proposal how it shall meet the delivery, installation (including synchronization) and training requirements. The Government shall evaluate for ability to meet or exceed these requirements. Proposals must include a delivery lead-time as well as system installation, synchronization and training by an original equipment manufacturer (OEM) service technician.

Factor 3: Warranty

The contractor shall detail in its technical proposal the terms and conditions for its proposed 1-year warranty. The proposed approach shall be evaluated for the ways in which it meets or exceeds the purchase description warranty specifications.

Factor 4: Past Performance

The Contractor shall provide a list of two (2) contracts or purchase orders completed during the past five (5) years, similar in size and scope to the equipment requirements outlined in this purchase description. Experience must be specific to provision Neurolucida and Stereo Investigator System or equal system and shall include the following information for each contract or purchase order listed:

a. Name of Contracting Organization

b. Total Contract Value

c. Description of Requirement

d. Contract Period of Performance

Past Performance shall be evaluated for relevance to the current requirement.

Technical proposals will be evaluated using a summary adjectival rating in accordance with the following scale:

Excellent The proposal has exceptional merit and reflects an excellent approach which will clearly result in the superior attainment of all requirements and objectives. This clearly achievable approach includes several advantageous characteristics of substance, and very few disadvantages, which can be expected to result in outstanding performance. The risk of unsuccessful performance is very low as the proposal provides solutions which are unquestionably feasible and practical.

These solutions are further considered very low risk in that they are exceptionally clear and precise, fully supported, and demonstrate a clear understanding of the requirements. Risk Level: Very Low

Good The proposal demonstrates a sound approach which is expected to meet all requirements and objectives. This sound approach includes advantageous characteristics of substance, and few relatively minor disadvantages, which collectively can be expected to result in satisfactory performance. The risk of unsuccessful performance is low as the proposal contains solutions which are considered feasible and practical. These solutions are further considered to reflect low risk in that they are clear and precise, supported, and demonstrate an understanding of the requirements. Risk Level: Low

Acceptable The proposal demonstrates an approach which is capable of meeting all requirements and objectives. The approach includes both advantageous and disadvantageous characteristics of substance, where the advantages are not outweighed by the disadvantages. Collectively, the advantages and disadvantages are likely to result in acceptable performance. The risk of unsuccessful performance is moderate, as the proposal solutions are generally feasible and practical. These solutions may also be considered to reflect moderate risk in that they may be somewhat clear and precise, partially supported, and/or demonstrate a general understanding of the requirements. Risk Level: Neutral

Marginal The proposal demonstrates an approach which may not be capable of meeting all requirements and objectives. The approach has disadvantages of substance and advantages, which if they exist, are outweighed by the disadvantages. Collectively, the advantages and disadvantages present a low or questionable likelihood of resulting in satisfactory performance. The risk of unsuccessful performance is high as the proposal contains solutions which may not be feasible and practical. These solutions may also be considered to reflect high risk in that they lack clarity and precision, are generally unsupported, and/or do not demonstrate a complete understanding of the requirements. Risk Level: High

Unacceptable The proposal demonstrates an approach which, based on a very high risk, will very likely not be capable of meeting all requirements and objectives. This approach has several disadvantages of substance, and advantages which, if they exist, are outweighed by disadvantages.

Collectively, the advantages and disadvantages are unlikely to result in satisfactory performance. The risk of unsuccessful performance is very high as the proposal contains solutions which are not feasible and practical. The solutions may also be considered to reflect very high risk in that they lack any clarity or precision. Risk Level: Very High

File details come from the government source that posted it. Updated .