Hertz Converter SOW.pdf
PDF 260 KB Posted
- Attached to
- Facility Hertz Converter Federal contract opportunity
- Solicitation number
- FA481923QS013
About this file
This statement of work outlines requirements for two three-phase hertz converters to be installed at two facilities on Tyndall Air Force Base. The converters are needed to provide 115 VAC, 400 Hertz, three-phase power from incoming 115-220 volt, 50/60 Hz single-phase input power. One converter each is required at Building 7042 known as the Conventional Maintenance shop and Building 7026 which houses the Precision Guided Munitions shop. Delivery of equipment is required within 180 days and installation must be completed by an electrician. A minimum two-year product warranty is specified. The related federal contract opportunity is solicitation number FA481923QS013 issued by the Department of the Air Force Air Combat Command to procure facility hertz converters.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - Hertz Converter (Amended) v2.pdf | ||
| Compilation of Questions and Answers (Amended).pdf | ||
| Hertz Converter SOW (Amended).pdf | ||
| Combo - Hertz Converter (Amended).pdf | ||
| Combo - Hertz Converter (Amended).pdf | ||
| Compilation of Questions and Answers.pdf | ||
| Combo - Hertz converter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
325 Munitions Squadron
3 Phase Hertz Converter
25 August 2023
STATEMENT OF WORK: 325 MUNITIONS 3 PHASE HERTZ CONVERTER
1. Scope:
This statement of work is for the purchase of two hertz converters. Each installed in two separate facilities to provide reliable solid state power systems. The power source that feeds to the facility will be installed to the hertz converter. The hertz converter will then convert power output to provide 115 VAC, 400 Hertz, 3 phase power, 15 amps per phase to the whole facility.
2. Delivery Location:
Installation required at:
1. Building 7042, also known as on Conventional Maintenance shop
2. Building 7026 Precision Guided Munitions shop.
Installation should be completed within 180 days ARO Assets to be delivered to each facility:
ATTN; TSgt David Parra 105 Ammo Loop Rd Tyndall AFB, FL 32403.
3. Equipment Requirements:
This equipment needs to convert 115-220 volts, 50/60 Hz, single phase input power to 3 phase, 400Hz, 115 Vac, 15 amps per phase output power. Equipment must have Input High Voltage Transient protection and protection from electrical surges. Voltage output for each phase power should be adjustable. This piece of equipment will require an electrician to install.
4. Warranty:
Minimum product warranty of two years.
File details come from the government source that posted it. Updated .