Compilation of Questions and Answers.pdf
PDF 2 MB Posted
- Attached to
- Facility Hertz Converter Federal contract opportunity
- Solicitation number
- FA481923QS013
About this file
This document provides answers to questions about a facility hertz converter. It specifies that the required converter input voltage and frequency should be 1-phase, 115V or 1-phase, 220V. The required converter output voltage and frequency is listed as 115V, 400 Hertz, 3 phase power, at 15 amps per phase. The load is described as an electronic load. Two potential installation locations are identified as Building 7042 and Building 7026. The related federal contract opportunity is solicitation number FA481923QS013 for a Facility Hertz Converter through the Department of the Air Force Air Combat Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - Hertz Converter (Amended) v2.pdf | ||
| Compilation of Questions and Answers (Amended).pdf | ||
| Hertz Converter SOW (Amended).pdf | ||
| Combo - Hertz Converter (Amended).pdf | ||
| Combo - Hertz Converter (Amended).pdf | ||
| Hertz Converter SOW.pdf | ||
| Combo - Hertz converter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Compilation of Questions and Answers
1. What is required converter input voltage and frequency (supply)?
It should be 1-phase, 115V or 1-phase, 220V, 1 phase, 115V
2. What is required converter output voltage and frequency (load)?
115V, 400 Hertz, 3 phase power, 15 amps per phase
3. What is the kind of your 15A load (motor, electronics, heater...etc.)?
Electronic load
4. Installation locations:
Building 7042
Building 7026
Option 1
Option 2