Hertz Converter SOW (Amended).pdf
PDF 226 KB Posted
- Attached to
- Facility Hertz Converter Federal contract opportunity
- Solicitation number
- FA481923QS013
About this file
This statement of work outlines requirements for two three-phase hertz converters to be installed at Tyndall Air Force Base facilities. The converters are needed to provide 115 VAC, 400 Hertz, three-phase power from incoming 110 volt, 50/60 Hz single-phase utility power. Each converter must be capable of delivering 15 amps per phase and include input surge protection and adjustable phase voltages. Installation is required at Building 7042, the Conventional Maintenance shop, and Building 7026, the Precision Guided Munitions shop, within 180 days. A minimum two-year product warranty is also specified. The related federal contract opportunity is a solicitation from the Air Force Air Combat Command seeking bids for the facility hertz converters with an anticipated installation at Tyndall Air Force Base as detailed in the statement of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - Hertz Converter (Amended) v2.pdf | ||
| Compilation of Questions and Answers (Amended).pdf | ||
| Combo - Hertz Converter (Amended).pdf | ||
| Combo - Hertz Converter (Amended).pdf | ||
| Compilation of Questions and Answers.pdf | ||
| Combo - Hertz converter.pdf | ||
| Hertz Converter SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
325 Munitions Squadron
3 Phase Hertz Converter
12 Sep 2023
PERFORMANCE WORK STATEMENT: 325 MUNITIONS 3 PHASE HERTZ CONVERTER
1. Scope:
This statement of work is for the purchase total of two hertz converters each installed in two separate facilities to provide reliable solid state power systems. The power source that feeds to the facility needs will be installed to the hertz converter. The hertz converter will then convert power output to provide 115 VAC, 400 Hertz, 3 phase power, 15 amps per phase to the whole facility.
2. Delivery Location:
Installation required at: Building 7042, also known as on Conventional Maintenance shop & Building 7026 Precision Guided Munitions shop.
Installation should be completed within 180 days of purchase.
Assets to be delivered to each facility:
ATTN; TSgt David Parra 105 Ammo Loop Rd Tyndall AFB, FL 32403.
3. Equipment Requirements:
This equipment needs to convert 110 volts (+/- 20%), 50/60 Hz, single phase input power to 3 phase, 400Hz, 115 Vac, 15 amps per phase output power. Equipment must have Input High Voltage Transient protection and protection from electrical surges. Voltage output for each phase power should be adjustable. This piece of equipment will require an electrician to install.
4. Warranty:
Minimum product warranty of two years.