HDEC04-18-R-0035-0001.pdf

PDF 176 KB Posted

Attached to
Refrigerators and Freezers
Solicitation number
HDEC04-18-R-0035
Issued by

About this file

Modification to add Puerto Rico and Far East Commissaries to Solicitation HDEC04-18-R-0035. In addition, solicitation has been extended and will be due by 1600 hours, February 4th, 2019.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

POC: Lafayette Jefferson, Email: Lafayette.Jefferson@deca.mil, (804) 734-8000 x48732 Amending solicitation to add Puerto Rico and the Far East commissaries. In addition, solicitation date has been extended and w ill be due by 1600 hours, February 4th, 2019.

1. CONTRACT ID CODE PAGE OF PAGES

1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HDEC0418R0035

X 9B. DATED (SEE ITEM 11)

13-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jan-2019

CODE

DEFENSE COMMISSARY AGENCY

SUPPLY & EQUIPMENT DIVISION

BUILDING P 11200

1300 E AVENUE

FORT LEE VA 23801-1800

HDEC04 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HDEC0418R0035

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from CONUS/OCONUS to CONUS.

SUBCLIN 0001AA

The pricing detail quantity has decreased by 2.00 from 7.00 to 5.00.

SUBCLIN 0001AB

The pricing detail quantity has decreased by 2.00 from 11.00 to 9.00.

SUBCLIN 0001AC

The pricing detail quantity has decreased by 2.00 from 12.00 to 10.00.

SUBCLIN 0001AD

The pricing detail quantity has decreased by 2.00 from 4.00 to 2.00.

CLIN 1001

The CLIN description has changed from CONUS /OCONUS to CONUS.

SUBCLIN 1001AA

The pricing detail quantity has decreased by 2.00 from 6.00 to 4.00.

SUBCLIN 1001AB

The pricing detail quantity has decreased by 2.00 from 3.00 to 1.00.

SUBCLIN 1001AC

The pricing detail quantity has decreased by 2.00 from 4.00 to 2.00.

SUBCLIN 1001AD

The pricing detail quantity has decreased by 2.00 from 5.00 to 3.00.

CLIN 2001

SUBCLIN 2001AA

SUBCLIN 2001AB

SUBCLIN 2001AC

SUBCLIN 2001AD

CLIN 3001

SUBCLIN 3001AA

CLIN 4001

SUBCLIN 4001AA

SUBCLIN 4001AB

SUBCLIN 4001AC

SUBCLIN 4001AD

CLIN 0003 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Puerto Rico

FFP

Reach-In Freezer and Refrigerator CEDs 1B10-2, 1B10-3, 1D04-2, and 1D04-3 Base Year: March 1, 2019 - February 29, 2020

NET AMT

SUBCLIN 0003AA is added as follows:

0003AA 1

CED 1B10-2: Reach-in Freezer

FFP

2 Doors, Self-contained FOB: Destination

SUBCLIN 0003AB is added as follows:

0003AB 1

CED 1B10-3: Reach-in Freezer

FFP

3 Doors, Self-contained

SUBCLIN 0003AC is added as follows:

0003AC 1

CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 0003AD is added as follows:

0003AD 1

CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 0004 is added as follows:

Far East

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 0004AA is added as follows:

0004AA 1

CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 0004AB is added as follows:

0004AB 1

CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 0004AC is added as follows:

0004AC 1

CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 0004AD is added as follows:

0004AD 1

CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 1003 is added as follows:

OPTION Puerto Rico

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 1003AA is added as follows:

1003AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 1003AB is added as follows:

1003AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 1003AC is added as follows:

1003AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 1003AD is added as follows:

1003AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 1004 is added as follows:

OPTION Far East

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 1004AA is added as follows:

1004AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 1004AB is added as follows:

1004AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 1004AC is added as follows:

1004AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 1004AD is added as follows:

1004AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 2003 is added as follows:

OPTION Puerto Rico

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 2003AA is added as follows:

2003AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 2003AB is added as follows:

2003AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 2003AC is added as follows:

2003AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 2003AD is added as follows:

2003AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 2004 is added as follows:

OPTION Far East

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 2004AA is added as follows:

2004AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 2004AB is added as follows:

2004AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 2004AC is added as follows:

2004AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 2004AD is added as follows:

2004AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 3003 is added as follows:

OPTION Puerto Rico

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 3003AA is added as follows:

3003AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 3003AB is added as follows:

3003AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 3003AC is added as follows:

3003AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 3003AD is added as follows:

3003AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 3004 is added as follows:

OPTION Far East

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 3004AA is added as follows:

3004AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 3004AB is added as follows:

3004AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 3004AC is added as follows:

3004AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 3004AD is added as follows:

3004AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 4003 is added as follows:

OPTION Puerto Rico

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 4003AA is added as follows:

4003AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 4003AB is added as follows:

4003AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 4003AC is added as follows:

4003AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 4003AD is added as follows:

4003AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

CLIN 4004 is added as follows:

OPTION Far East

FFP

Reach-In Freezer and Refrigerator

SUBCLIN 4004AA is added as follows:

4004AA 1

OPTION CED 1B10-2: Reach-in Freezer

FFP

SUBCLIN 4004AB is added as follows:

4004AB 1

OPTION CED 1B10-3: Reach-in Freezer

FFP

SUBCLIN 4004AC is added as follows:

4004AC 1

OPTION CED 1D04-2: Reach-in Refrigerator

FFP

SUBCLIN 4004AD is added as follows:

4004AD 1

OPTION CED 1D04-3: Reach-in Refrigerator

FFP

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0003:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A N/A

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AA:

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AD:

The following Acceptance/Inspection Schedule was added for CLIN 0004:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AD:

The following Acceptance/Inspection Schedule was added for CLIN 1003:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AD:

The following Acceptance/Inspection Schedule was added for CLIN 1004:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AD:

The following Acceptance/Inspection Schedule was added for CLIN 2003:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AD:

The following Acceptance/Inspection Schedule was added for CLIN 2004:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AD:

The following Acceptance/Inspection Schedule was added for CLIN 3003:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AD:

The following Acceptance/Inspection Schedule was added for CLIN 3004:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AD:

The following Acceptance/Inspection Schedule was added for CLIN 4003:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AD:

The following Acceptance/Inspection Schedule was added for CLIN 4004:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AD:

(End of Summary of Changes)

File details come from the government source that posted it.