HDEC04-18-R-0035-0001.pdf
PDF 176 KB Posted
- Attached to
- Refrigerators and Freezers
- Solicitation number
- HDEC04-18-R-0035
- Issued by
-
Defense Commissary Agency
About this file
Modification to add Puerto Rico and Far East Commissaries to Solicitation HDEC04-18-R-0035. In addition, solicitation has been extended and will be due by 1600 hours, February 4th, 2019.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| solicitation_-_HDEC04-18-R-0035_-_Refrigerators_and_Freezers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
POC: Lafayette Jefferson, Email: Lafayette.Jefferson@deca.mil, (804) 734-8000 x48732 Amending solicitation to add Puerto Rico and the Far East commissaries. In addition, solicitation date has been extended and w ill be due by 1600 hours, February 4th, 2019.
1. CONTRACT ID CODE PAGE OF PAGES
1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HDEC0418R0035
X 9B. DATED (SEE ITEM 11)
13-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jan-2019
CODE
DEFENSE COMMISSARY AGENCY
SUPPLY & EQUIPMENT DIVISION
BUILDING P 11200
1300 E AVENUE
FORT LEE VA 23801-1800
HDEC04 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HDEC0418R0035
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from CONUS/OCONUS to CONUS.
SUBCLIN 0001AA
The pricing detail quantity has decreased by 2.00 from 7.00 to 5.00.
SUBCLIN 0001AB
The pricing detail quantity has decreased by 2.00 from 11.00 to 9.00.
SUBCLIN 0001AC
The pricing detail quantity has decreased by 2.00 from 12.00 to 10.00.
SUBCLIN 0001AD
The pricing detail quantity has decreased by 2.00 from 4.00 to 2.00.
CLIN 1001
The CLIN description has changed from CONUS /OCONUS to CONUS.
SUBCLIN 1001AA
The pricing detail quantity has decreased by 2.00 from 6.00 to 4.00.
SUBCLIN 1001AB
The pricing detail quantity has decreased by 2.00 from 3.00 to 1.00.
SUBCLIN 1001AC
The pricing detail quantity has decreased by 2.00 from 4.00 to 2.00.
SUBCLIN 1001AD
The pricing detail quantity has decreased by 2.00 from 5.00 to 3.00.
CLIN 2001
SUBCLIN 2001AA
SUBCLIN 2001AB
SUBCLIN 2001AC
SUBCLIN 2001AD
CLIN 3001
SUBCLIN 3001AA
CLIN 4001
SUBCLIN 4001AA
SUBCLIN 4001AB
SUBCLIN 4001AC
SUBCLIN 4001AD
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Puerto Rico
FFP
Reach-In Freezer and Refrigerator CEDs 1B10-2, 1B10-3, 1D04-2, and 1D04-3 Base Year: March 1, 2019 - February 29, 2020
NET AMT
SUBCLIN 0003AA is added as follows:
0003AA 1
CED 1B10-2: Reach-in Freezer
FFP
2 Doors, Self-contained FOB: Destination
SUBCLIN 0003AB is added as follows:
0003AB 1
CED 1B10-3: Reach-in Freezer
FFP
3 Doors, Self-contained
SUBCLIN 0003AC is added as follows:
0003AC 1
CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 0003AD is added as follows:
0003AD 1
CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 0004 is added as follows:
Far East
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 0004AA is added as follows:
0004AA 1
CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 0004AB is added as follows:
0004AB 1
CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 0004AC is added as follows:
0004AC 1
CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 0004AD is added as follows:
0004AD 1
CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 1003 is added as follows:
OPTION Puerto Rico
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 1003AA is added as follows:
1003AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 1003AB is added as follows:
1003AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 1003AC is added as follows:
1003AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 1003AD is added as follows:
1003AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 1004 is added as follows:
OPTION Far East
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 1004AA is added as follows:
1004AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 1004AB is added as follows:
1004AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 1004AC is added as follows:
1004AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 1004AD is added as follows:
1004AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 2003 is added as follows:
OPTION Puerto Rico
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 2003AA is added as follows:
2003AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 2003AB is added as follows:
2003AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 2003AC is added as follows:
2003AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 2003AD is added as follows:
2003AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 2004 is added as follows:
OPTION Far East
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 2004AA is added as follows:
2004AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 2004AB is added as follows:
2004AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 2004AC is added as follows:
2004AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 2004AD is added as follows:
2004AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 3003 is added as follows:
OPTION Puerto Rico
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 3003AA is added as follows:
3003AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 3003AB is added as follows:
3003AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 3003AC is added as follows:
3003AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 3003AD is added as follows:
3003AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 3004 is added as follows:
OPTION Far East
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 3004AA is added as follows:
3004AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 3004AB is added as follows:
3004AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 3004AC is added as follows:
3004AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 3004AD is added as follows:
3004AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 4003 is added as follows:
OPTION Puerto Rico
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 4003AA is added as follows:
4003AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 4003AB is added as follows:
4003AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 4003AC is added as follows:
4003AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 4003AD is added as follows:
4003AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
CLIN 4004 is added as follows:
OPTION Far East
FFP
Reach-In Freezer and Refrigerator
SUBCLIN 4004AA is added as follows:
4004AA 1
OPTION CED 1B10-2: Reach-in Freezer
FFP
SUBCLIN 4004AB is added as follows:
4004AB 1
OPTION CED 1B10-3: Reach-in Freezer
FFP
SUBCLIN 4004AC is added as follows:
4004AC 1
OPTION CED 1D04-2: Reach-in Refrigerator
FFP
SUBCLIN 4004AD is added as follows:
4004AD 1
OPTION CED 1D04-3: Reach-in Refrigerator
FFP
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AA:
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AD:
The following Acceptance/Inspection Schedule was added for CLIN 0004:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AD:
The following Acceptance/Inspection Schedule was added for CLIN 1003:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AD:
The following Acceptance/Inspection Schedule was added for CLIN 1004:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AD:
The following Acceptance/Inspection Schedule was added for CLIN 2003:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AD:
The following Acceptance/Inspection Schedule was added for CLIN 2004:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AD:
The following Acceptance/Inspection Schedule was added for CLIN 3003:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3003AD:
The following Acceptance/Inspection Schedule was added for CLIN 3004:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 3004AD:
The following Acceptance/Inspection Schedule was added for CLIN 4003:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4003AD:
The following Acceptance/Inspection Schedule was added for CLIN 4004:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 4004AD:
(End of Summary of Changes)
File details come from the government source that posted it.