Attachment_5_-_Evaluation_Tables.docx

DOCX document 26 KB Posted

Attached to
Advanced Wireless Services-3 (AWS-3) Early Entry Portal (EEP) Development, Operations and Maintenance Support Federal contract opportunity
Solicitation number
HC104718R4004
Issued by
Defense Information Systems Agency

About this file

Attachment 5 - Evaluation Tables

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Wireless Services-3 (AWS-3) Early Entry Portal (EEP) Development, Operations and Maintenance Support, newest first.
File Type Posted
additional_questions.docx DOCX document
non_disclosure_agreement.docx DOCX document
9_Engineering_SMO_DSRMT_EEP Training_Slides 29 June 2017.pdf PDF
6_T3747-1 AWS-3 EEP RTM - T3747-1-PD-17-478.pdf PDF
3_T3747-1-PD-17-467 T3747-1 AWS-3 EEP Software Design Document - v2.3 29 June 2017.pdf PDF
14_DSO-HDBK-15-098-EEP Analysis Capability SOP 11-30-2016 DRAFT_.pdf PDF
HC104718R4004_Request_for_Proposal_AMD02.docx DOCX document
7_ T3747-1 AWS-3 EEP v2.3 Architecture 29 June 2017.pdf PDF
9_Army Tactical Radio Relay PDF
9_Licensee_EEP Training_Slides 29 June 2017.pdf PDF
9_AWS-3 EEP Licensee_EEP Training_Slides 10 NOV 2016.pdf PDF
9_Federal_EEP Training_Slides 29 June 2017.pdf PDF
Attachment_7_-_Provisions_and_Clauses.docx DOCX document
Attachment_5_-_Evaluation_Tables.docx DOCX document
AWS-3 EEP User's Guide 29 June 2017.pdf PDF
Attachment_4_-_SCRM_Plan.docx DOCX document
Attachment_2_-_QASP.docx DOCX document
9_AWS-3 EEP User's Guide 29 June 2017.pdf PDF
(N4110) EEP VDD Summaries.pdf PDF
12_AWS-3 EEP Regression Tests.zip ZIP file
9_AWS-3 EEP Engineering_SMO_DSRMT_EEP Training_Slides 10 NOV 2016.pdf PDF
9_AWS-3 EEP Federal_EEP Training_Slides 10 NOV 2016.pdf PDF
10_T3747-1-OTH-17-479 T3747-1 AWS-3 EEP v2.3 Installation Guide.pdf PDF
9_AWS-3_EEP_Federal_EEP_Training_Slides_10_NOV_2016.pdf PDF
6_T3747-1_AWS-3_EEP_RTM_-_T3747-1-PD-17-478.pdf PDF
9_AWS-3_EEP_Licensee_EEP_Training_Slides_10_NOV_2016.pdf PDF
14_DSO-HDBK-15-098-EEP_Analysis_Capability_SOP_11-30-2016_DRAFT_.pdf PDF
9_AWS-3_EEP_Engineering_SMO_DSRMT_EEP_Training_Slides_10_NOV_2016.pdf PDF
Attachment_6_-_Questions_Template.docx DOCX document
3_T3747-1-PD-17-467_T3747-1_AWS-3_EEP_Software_Design_Document_-_v2.3_29_June_2017.pdf PDF
Attachment_1_-_PWS.docx DOCX document
Attachment_3_-_CLIN_Pricing_Worksheet.xlsx XLSX spreadsheet
AWS-3_EEP_v2.3_DSO_Form_19_-_Software_System_Certification.pdf PDF
9_Federal_EEP_Training_Slides_29_June_2017.pdf PDF
Attachment_4_-SCRM_Plan.docx DOCX document
Attachment_7_-_Provisions_and_Clauses.docx DOCX document
9_AWS-3_EEP_User's_Guide_29_June_2017.pdf PDF
9_Army_Tactical_Radio_Relay_(TRR)_Coordination_Training_Slides_29_June_2017.pdf PDF
15_Coordination_Business_Process_V1_1.pdf PDF
HC104718R4004_Request_for_Proposal.DOCX DOCX document
10_T3747-1-OTH-17-479_T3747-1_AWS-3_EEP_v2.3_Installation_Guide.pdf PDF
12_AWS-3_EEP_Regression_Tests.zip ZIP file
8_EEP_Source_Code.zip ZIP file
Attachment_2_-_QASP.docx DOCX document
9_Licensee_EEP_Training_Slides_29_June_2017.pdf PDF
Attachment_3_-_CLIN_Pricing_Worksheet.xlsx XLSX spreadsheet
Attachment_7_-_Provisions_and_Clauses.docx DOCX document
Attachment_1_-_PWS.docx DOCX document
Attachment_6_-_Questions_Template.docx DOCX document
Attachment_4_-SCRM_Plan.docx DOCX document
Show all 50

Advanced Wireless Services-3 (AWS-3) Early Entry Portal (EEP) Development, Operations and Maintenance Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION PLAN

N4110 -- Early Entry Portal (EEP) Development, Operations, and Maintenance (Defense Spectrum Organization)

Basis of evaluation: Lowest-Price Technically Acceptable (LPTA).

Before completing the Evaluation Plan please review the FAR Part 8/16 Ordering Procedures located at: https://www.ditco.disa.mil/DitcoContractingTemplates/doku.php?id=fa r_part_8-16_procedures_and_attachments

Non-Cost/Price Factors During the evaluation, the attached ratings will be used to determine if the following technical/management factors are Acceptable/Unacceptable (see Table 1).

A. Technical/Management Approach:

The Technical/Management Approach portion of the proposal must be limited to 25 pages. A draft Software Development Plan (SDP) and Task Order Management Plan (TOMP) framework must be submitted alongside the Technical/Management Approach. There is no page limit for the draft SDP or TOMP framework.

In order for a contractor’s proposal/quotation to be rated Technically Acceptable overall, each of the following subfactors must be rated Acceptable.

(a) Subfactor 1: Software Development, Operations, and Maintenance: In order for this subfactor to be rated Acceptable, the offeror must demonstrate an approach that includes adequate processes, tools, infrastructure, resources, risk management, and dependencies associated with fully meeting the requirements for EEP Development, Operations, and Maintenance described within Performance Work Statement Tasks 6.3 and 6.4. The approach shall be supported by a draft Software Development Plan, in accordance with the requirements of PWS Task 6.3.1. An acceptable approach shall include:

· Description of agile methodologies used throughout the lifecycle

· The software development process, from requirements analysis through deployment, demonstrating that new capabilities can be incorporated into EEP, meeting the requirements of PWS Task 6.3.

· The operations and maintenance process – ensuring that EEP is never down for more than two (2) consecutive business days and ensuring the system is available 98% of the time, on an annual basis – meeting the requirements of PWS Task 6.4.

· Approach for operating a help desk, including maintaining appropriate documentation and logs.

· Approach for testing that ensures a high-quality product is delivered/maintained.

· Approach for adding Universal Browser Compatibility, 508 Compliance, and Satellite Coordination Agreement Documents capabilities, including technical details, risks, levels of effort, and changes to EEPAC supporting documentation.

(b) Subfactor 2: Transition and Deployment: In order for this subfactor to be rated Acceptable, the offeror must demonstrate an approach that specifically addresses the processes, tools, infrastructure, resources, risks, and dependencies associated with meeting the requirements for EEP Transition-In and Transition-Out, in accordance with the requirements of PWS Task 6.2. An acceptable approach shall include:

· EEP Transition-in approach that meets the required timelines and requirements in accordance with PWS Task 6.2.1.

a. The offeror’s proposed privately hosted environment(s) and infrastructure, to include the approach to security boundaries.

b. Transition-in timeline (including downtime), dependencies, and risks

c. Testing and verification.

d. Deployment.

· EEP Transition-out.

(c) Subfactor 3: Task Management: In order for this subfactor to be rated Acceptable, the offeror must demonstrate an approach that specifically addresses the management of a software development program and the management of product deliveries in accordance with PWS Tasks 6.1 and 6.6. This subfactor shall be supported by the delivery of a framework for the EEP Task Order Management Plan, in accordance with the requirements of PWS Task 6.1.1.

(d) Subfactor 4: Disaster Mitigation Support: In order for this subfactor to be rated Acceptable, the offeror must demonstrate an approach that specifically addresses the approach for meeting the requirements for EEP Disaster Mitigation described within Performance Work Statement Task 6.5.

B. Past Performance:

The past performance evaluation factor will be rated as acceptable or unacceptable based on the definitions contained in Table 2. There are no subfactors assigned to past performance.

Cost/Price Factor Since this requirement is based on LPTA, award will be made to the contractor that presents the lowest priced technically acceptable approach. The contractor’s price proposal will be evaluated to determine if it is reasonable and complete. Normally, price reasonableness is established through price analysis. The Government will determine completeness of the offeror's proposal by verifying that all solicitation requirements have been priced, figures are correctly calculated, and costs are presented in a clear and useful format. The Government reserves the right to conduct a realism analysis of the proposed price.

In addition, indicate whether or not you want the estimated total dollars available for this requirement to be disclosed to the vendors.

Yes |_| Disclose available funds $ ___________ No |X| Do not disclose available funds.

Although available funds will not be disclosed, offeror’s will be presented with the Full-Time Equivalent (FTE) labor metrics for the predecessor effort. On average, the predecessor effort included labor for 13 FTEs on an annual basis.

Table 1. Technical/Management Ratings

Rating
Description
Acceptable
Proposal/quotation clearly meets the minimum requirements of the solicitation.
Unacceptable
Proposal/quotation does not clearly meet the minimum requirements of the solicitation.

Table 2. Past Performance Ratings

Rating
Description
Acceptable
Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable
Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

Enclosure 8a, EvalPlan/Ratings for LPTA 3Oct2016/v1

File details come from the government source that posted it.