About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Wireless Services-3 (AWS-3) Early Entry Portal (EEP) Development, Operations and Maintenance Support, newest first.
File Type Posted
non_disclosure_agreement.docx DOCX document
9_Federal_EEP Training_Slides 29 June 2017.pdf PDF
Attachment_7_-_Provisions_and_Clauses.docx DOCX document
Attachment_5_-_Evaluation_Tables.docx DOCX document
AWS-3 EEP User's Guide 29 June 2017.pdf PDF
Attachment_4_-_SCRM_Plan.docx DOCX document
Attachment_2_-_QASP.docx DOCX document
9_AWS-3 EEP User's Guide 29 June 2017.pdf PDF
(N4110) EEP VDD Summaries.pdf PDF
12_AWS-3 EEP Regression Tests.zip ZIP file
9_AWS-3 EEP Engineering_SMO_DSRMT_EEP Training_Slides 10 NOV 2016.pdf PDF
9_Engineering_SMO_DSRMT_EEP Training_Slides 29 June 2017.pdf PDF
6_T3747-1 AWS-3 EEP RTM - T3747-1-PD-17-478.pdf PDF
3_T3747-1-PD-17-467 T3747-1 AWS-3 EEP Software Design Document - v2.3 29 June 2017.pdf PDF
14_DSO-HDBK-15-098-EEP Analysis Capability SOP 11-30-2016 DRAFT_.pdf PDF
HC104718R4004_Request_for_Proposal_AMD02.docx DOCX document
7_ T3747-1 AWS-3 EEP v2.3 Architecture 29 June 2017.pdf PDF
9_Army Tactical Radio Relay PDF
9_Licensee_EEP Training_Slides 29 June 2017.pdf PDF
9_AWS-3 EEP Licensee_EEP Training_Slides 10 NOV 2016.pdf PDF
9_AWS-3 EEP Federal_EEP Training_Slides 10 NOV 2016.pdf PDF
10_T3747-1-OTH-17-479 T3747-1 AWS-3 EEP v2.3 Installation Guide.pdf PDF
Attachment_6_-_Questions_Template.docx DOCX document
3_T3747-1-PD-17-467_T3747-1_AWS-3_EEP_Software_Design_Document_-_v2.3_29_June_2017.pdf PDF
Attachment_1_-_PWS.docx DOCX document
Attachment_3_-_CLIN_Pricing_Worksheet.xlsx XLSX spreadsheet
AWS-3_EEP_v2.3_DSO_Form_19_-_Software_System_Certification.pdf PDF
9_Federal_EEP_Training_Slides_29_June_2017.pdf PDF
Attachment_4_-SCRM_Plan.docx DOCX document
Attachment_7_-_Provisions_and_Clauses.docx DOCX document
9_AWS-3_EEP_User's_Guide_29_June_2017.pdf PDF
9_Army_Tactical_Radio_Relay_(TRR)_Coordination_Training_Slides_29_June_2017.pdf PDF
15_Coordination_Business_Process_V1_1.pdf PDF
HC104718R4004_Request_for_Proposal.DOCX DOCX document
10_T3747-1-OTH-17-479_T3747-1_AWS-3_EEP_v2.3_Installation_Guide.pdf PDF
12_AWS-3_EEP_Regression_Tests.zip ZIP file
8_EEP_Source_Code.zip ZIP file
Attachment_2_-_QASP.docx DOCX document
9_AWS-3_EEP_Federal_EEP_Training_Slides_10_NOV_2016.pdf PDF
6_T3747-1_AWS-3_EEP_RTM_-_T3747-1-PD-17-478.pdf PDF
9_AWS-3_EEP_Licensee_EEP_Training_Slides_10_NOV_2016.pdf PDF
14_DSO-HDBK-15-098-EEP_Analysis_Capability_SOP_11-30-2016_DRAFT_.pdf PDF
9_AWS-3_EEP_Engineering_SMO_DSRMT_EEP_Training_Slides_10_NOV_2016.pdf PDF
9_Licensee_EEP_Training_Slides_29_June_2017.pdf PDF
Attachment_7_-_Provisions_and_Clauses.docx DOCX document
Attachment_1_-_PWS.docx DOCX document
Attachment_6_-_Questions_Template.docx DOCX document
Attachment_4_-SCRM_Plan.docx DOCX document
Attachment_5_-_Evaluation_Tables.docx DOCX document
Attachment_3_-_CLIN_Pricing_Worksheet.xlsx XLSX spreadsheet
Show all 50

Advanced Wireless Services-3 (AWS-3) Early Entry Portal (EEP) Development, Operations and Maintenance Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT Questions & Answers

Question #
Security

Questions / Comments

RFP Reference
Government Response
RFP Change Required (Y/N)
Location of Change
Question #
Technical / Management

Questions / Comments

RFP Reference
Government Response
RFP Change Required (Y/N)
Location of Change
1
RFP 3(2)(d) directs offerors to bid the exact plug numbers for ODC. The answer to question 3 says that costs for hardware and infrastructure costs are not included in the plug number. Please confirm the Government intends to reimburse the contractor for equipment/infrastructure costs necessary for hosting the EEP. If so, please clarify where the offeror should identify this cost in their proposal assuming?
RFP 3(2)(d); RFP Amendment 3, Attachment 6, Questions and Answers, Question #3
The PWS 6.2.1 covers the infrastructure and hardware requirement. "The contractor shall provide all infrastructure, hardware and any other product or service required to successfully transition the EEP."

PWS 6.4.1: "The contractor shall be responsible for procuring commercial software licenses (e.g., operating systems, or database management tools), maintaining hardware, procuring spares and additional computational/storage capabilities, updating hardware that is end-of-life, and disposing of unneeded hardware in accordance with Government-approved procedures by the approved, privately hosted environment, these activities shall maximize efficiency and minimize program cost to the greatest extent possible."

Prior to purchase of ODC’s, approval should be obtained from Contracting Office/COR. The Surge CLIN is incorporated into the Contract in support of additional work that may arise in the future, allowing increase of costs for established CLINS.

N

2
The PWS states that “the contractor shall transition… to an approved privately hosted environment located at the contractor’s facility.” Does this mean that the contractor must own and operate the physical hosting facility, or is it acceptable to use a third-party dedicated hosting facility? Most small businesses do not operate their own physical hosting facilities; procuring a third-party facility would be less expensive and provide better value to the Government.
PWS 6.2.1
Yes, It is acceptable to use a third party facility.
N

The RFP states that offers must "specifically address the processes, tools, infrastructure, resources, risks, and dependencies that will be utilized to meet or exceed the requirements for EEP Development, Operations, and Maintenance described within Performance Work Statement Tasks 6.3 and 6.4." The PWS states that "The contractor shall provide all infrastructure, hardware, and any other product or service required to successfully transition the EEP."

QUESTION 1: To ensure a full and open competition, will the Government provide the necessary run-time binaries for all versions of EEP so that the EEP source code can be fully compiled for verification by non-incumbent offerors that their infrastructure and hardware have the capabilities necessary to host EEP—which is a critical aspect of providing best possible price to the Government on a LPTA basis and of properly identifying risks?

QUESTION 2: If the run-time binaries for all versions of EEP are not provided within a reasonable time frame, will the Government extend the proposal submission due date to ensure fair competition?

Government answers:

ANSWER 1:Y (Can be provided as long as requested with full nondisclosure) Clarification to Q1:

Re: Govt’s Response to Question 1 Above: Given the time factor, could the government email it directly to us for execution today? If not, will the Government please post the NDA today prior to 4 PM, along with instructions for who we should email it to for final execution?

ANSWER 2: No extension to submittal date can be granted Clarification to Q2:

QUESTION: Since the Government is not able to extend the submission deadline, could the Government explain how/if, when determining whether an Offerer’s approach is “LPTA” (especially technically acceptable), will any consideration be given to account for the variation in time afforded to Offerors to assess EEP transition and operational risks (which directly impacts price)?

Q1: binaries will be provided at time of request from the offeror, as previously stated a NDA should first be provided) NDA is also being added to AMD04.

Q2: See Question 1 regarding response time. All documents have been provided or are available upon request.

Question #
Pricing

Questions / Comments

RFP Reference
Government Response
RFP Change Required (Y/N)
Location of Change
1
CLIN pricing worksheet “CLIN Structure” tab, cell D83 says “Surge CLIN 9999 (APPLICABLE TO LABOR, TRAVEL, & MATERIALS IN BASE PERIOD, OPTION PERIOD 1, & OPTION PERIOD 2 ONLY) @ 5%”. RFP 3(2)(f) says “surge support will not exceed 5% of the offeror’s total proposed cost/price for the base and all option periods, excluding any 6-month extension of services” (Emphasis is mine.) Please confirm that Option Year 3 should be included in the surge CLIN.
Attachment 3, CLIN Pricing Worksheet; RFP 3(2)(f)
Correction: Surge language should include: “Surge CLIN 9999 (APPLICABLE TO LABOR, TRAVEL, & MATERIALS IN BASE PERIOD, OPTION PERIOD 1, 2 and 3 ONLY) @ 5%”
N

File details come from the government source that posted it.