HC102821R0063 Solicitation RFP.pdf

PDF 911 KB Posted

Attached to
Cable Tray Support Replacement Federal contract opportunity
Solicitation number
HC102821R0063
Issued by
Defense Information Systems Agency

About this file

This is a request for proposal for a cable tray support replacement project. The Defense Information Systems Agency is seeking to replace existing floor-mounted cable tray support stanchions with an overhead suspension system in Computer Room 1 at the Data Center San Antonio facility. Offerors are requested to submit technical and price proposals by August 27, 2021 responding to the performance work statement and initial quality assurance surveillance plan. The project involves accessing the ceiling, installing overhead suspension supports no more than 8 feet apart, connecting to existing cable trays, and removing floor-mounted stanchions. The period of performance is six months from award. Proposals will be evaluated using a lowest price technically acceptable process, and award will be made to the offeror with the lowest price deemed technically acceptable based on the criteria in the RFP.

View the file

Other files for this federal contract opportunity

Other files attached to Cable Tray Support Replacement, newest first.
File Type Posted
Appendix B - As-Built Sections Drawing_Sheet A-6.pdf PDF
Appendix C - Cable Trays Specification.pdf PDF
CLIN Amount Spreadsheet.xlsx XLSX spreadsheet
Appendix A - SAT CR1 Cable Tray Plan.pdf PDF
Pre-Proposal Site Visit Request Instructions Cable Tray.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

HC102821R0063 28-Jul-2021

b. TELEPHONE NUMBER

618-418-6864

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 27 Aug 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

HC10289. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

RONALD E. WITT

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

DISA/DITCO-SCOTT-PL83

2300 EAST DRIVE, BUILDING 3600

SCOTT AFB IL 62225-5406

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

332312

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF41

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

HC102821R0063

Section SF 1449 - CONTINUATION SHEET

PWS

Performance Work Statement (PWS) Cable Tray Support System Replacement

Defense Information Systems Agency (DISA) Data Center San Antonio As of May 28, 2021

Contract Number:

Task Order Number:

Tracking Number:

Contractor Name:

Follow-on to Previous Contract and Task Order Number:

1. Contracting Officer’s Representative (COR) and Site Contacts.

a. COR.

Name:

Organization:

DODAAC

Address:

Phone Number:

Fax Number:

E-Mail Address:

b. Technical POC.

Name:

Organization:

DODAAC

Address:

Phone Number:

Fax Number:

c. Site Points of Contact

Organization:

Address:

Phone Number:

Organization:

Address:

Phone Number:

2. Contract or Task Order Title. Cable Tray Support System Replacement

3. Background.

Defense Information Systems Agency (DISA) Computing Centers provide routine and mission-critical computer processing resources and support to numerous Government agencies, 24 hours per day, and seven days a week.

DISA’s operational goal is to provide high availability and redundancy to all supported programs and workloads at a Tier III redundant datacenter. The San Antonio Data Center requires an overhead suspension of the Information Technology (IT) Cable Tray in Computer Room 1 (CR1). The existing cable tray is currently supported by stanchions bolted to the raised access floor panels blocking space for IT server racks and does not meet the Department of Defense (DoD) standards of having overhead suspended cable tray.

4. Objectives.

This project will replace the existing floor mounted support stanchions with braced overheard suspension system to suspend the IT Cable Tray in Computer Room 1 (CR1) from the interior roof structure above the IT racks to meet the requirement of DoD Core Data Center (CDC) reference architecture and engineering standards.

5. Scope. Replace the existing floor mounted support stanchions with the installation of a braced overheard suspension support system connected from the interior roof truss structure down through the drywall ceiling and suspended ceiling panels to support the existing cable tray in CR1 (Building 200, Room 141). The existing cable tray location is shown on the floor plan layout drawing at Appendix A. The project will require temporary removal of suspended ceiling panels, opening access holes in the ceiling drywall board, installation of overheard suspension system from the roof truss structure to support the existing cable trays, repair ceiling board and re-installing the suspended ceiling panels. The existing cable tray shall be kept in-place to maintain data center operations. Work shall include all equipment, supplies, connections, quality control and warranty.

5.1. Task 1: Project Management. Develop detailed project schedule, investigate existing conditions, conduct weekly project status meetings, prepare and submit shop drawings and product data for approval by the Government. Prepare and submit phased installation plan for placing braced overheard suspension system and connecting the existing cable tray. Schedule project meetings and record meeting minutes, maintain a clean work area, provide notification of hazardous conditions, and follow applicable Standards and Guidelines as listed within this PWS.

5.2. Task 2: Suspension System Installation. Install the braced overheard suspension system in CR1 from the interior roof truss structure to connect to the existing cable tray. Repair ceiling board and re-installing the suspended ceiling panels. Clean the area and floor during installation work.

5.3. Task 3: Cable Tray Stanchion Removal. Remove existing cable tray support stanchions.

5.4. Task 4: Close-Out Documents. Project Close-out documentation shall be provided for Government review and acceptance to include inventory sheet, as-built drawings, and warranty letter.

6. Performance Requirements.

6.1 Task 1: Project Management. The contractor shall provide project management to execute the requirements per this PWS based on site investigation of existing conditions and prepared project schedule, shop drawings, and product data sheets provided to the Government for approval. Prepare and submit a phased installation Plan for suspension of the cable trays to accomplish the project requirements as identified in this PWS and Appendices.

6.1.1 Subtask 1.1 - Project Schedule. The contractor shall provide a project schedule developed using Microsoft (MS) Project or similar program. Schedule shall use ‘critical path’ method and identify all milestones; the schedule shall include start date, submittal dates, key milestone dates, and completion dates as a minimum. The project schedule shall incorporate phasing of the project execution. The project schedule shall be reviewed at weekly progress meetings.

6.1.2 Subtask 1.2 - Existing conditions. The contractor shall perform site visits after contract award and review the as-built drawings to gather information on existing conditions and have a complete understanding of existing conditions and required work. The contractor shall investigate and verify all existing conditions, including working conditions, access, and other items/systems on the raised floor environment. DISA’s existing record drawings are available to the contractor, but these record drawings should not be viewed as complete and accurate. The contractor shall field verify all existing conditions prior to commencing with any work.

6.1.3 Subtask 1.3 - Shop Drawings and Product Data Submittals. The contractor shall prepare and submit detailed shop drawings and product data from Original Equipment Manufacturer (OEM) and Manufacturer’s Safety Data Sheer (MSDS) of fire stope sealant for Government review and approval. Allow 14 calendar days for Government reviews.

6.1.4 Subtask 1.4 - Project Status Meetings. The contractor shall conduct recurring weekly project status meetings, provide schedule updates and record meeting minutes for distribution.

6.1.5 Subtask 1.5 - Suspended Cable Tray Install Plan. The contractor shall prepare and submit a Suspended Cable Tray Install Plan with a detailed description of the Method of Procedures (MOPs) to be performed to hang the cable tray from the new overheard suspension system in phases with mitigation steps to avoid disruption of site operation and an installation phasing sequence that meets the proposed project schedule. The plan shall identify the process for accessing the ceiling to the truss structure, installing braced overheard suspension system, and connecting the existing cable tray over the operational IT racks. The contractor’s plan shall include, but not limited to: method for suspending the overhead cable tray supports, sequencing, Quality Control Plan, protection of existing IT systems in-place, building access, location of dumpsters and contractors’ work trailer. Reflected ceiling plan and cable tray layout are provided at Appendix A.

6.1.6 Subtask 1.6 – General Requirements.

6.1.6.1 Dust-Free Work Environment. Clean work areas at least once a day and remove debris from inside the building daily. No dust can be allowed into the IT equipment racks. Use HEPA filter vacuums and use tack-pads (at room entrances) in rooms with IT equipment. Do not carry out any machine cutting operations of materials inside the building that creates dust or shavings.

6.1.6.2 The contractor shall maintain or return all existing finishes to pre-work condition and repair all damage due to installation activities.

6.1.6.3 Applicable Standards and Guidelines. When there are conflicts between codes and standards that are not specifically addressed in this PWS, the more stringent shall apply. The codes, standards and publications most current at the date of contract acceptance shall be those referenced for the design. All work shall be done in accordance with the latest version(s) and/or edition(s) of the following codes and standards:

American Society for Testing and Materials (ASTM) Standards E814 and E1966 National Fire Protection Association (NFPA) 3 Recommended Practice for Commissioning and Integrated

Testing of Fire Protection and Life Safety Systems NFPA 70 National Electrical Code NFPA 70E Standard for Electrical Safety in the Workplace NFPA 72 National Fire Alarm and Signaling Code NFPA 101 Life Safety Code Handbook International Building Code (IBC) Uniformed Facilities Criteria (UFC) 4-010-01 Underwriters Laboratories (UL) Standards 1479 and 2079 United States Army Corp of Engineers (USACE) Engineer Research and Development Center (A/E/C)

Computer Aided Design (CAD) Standard

Deliverables for Task 1:

PWS

Task#

Deliverable Title Format Due Date Distribution/ Copies

Frequency and Remarks

6.1.1 Project Schedule MS Project or

similar in ‘critical path’

30 calendar days after award

Standard Distribution*

Reviewed and updated at Weekly Progress Meetings

6.1.3 Shop Drawings and

Product Data submittals pdf and dwg (see 6.4.3)

Prior to ordering materials

Standard Distribution*

According to approved schedule

6.1.4 Project Status

Meetings

Per this PWS Weekly after project kick-off meeting

Standard Distribution*

Reviewed and updated at Project Meetings

6.1.5 Suspended Cable

Tray Install Plan pdf and dwg Prior to on-site work beginning

Standard Distribution*

According to approved schedule

*Standard Distribution: 1 electronic copy of the transmittal letter without the deliverable to the Contracting Officer Representative (COR); 1 copy of the transmittal letter with the deliverable to the Technical POC and Site POC.

6.2 Task 2: Suspension System Installation.

6.2.1 Subtask 2.1 - Ceiling Access. Contractor shall access the ceiling in Computer Room 1 to install braced overheard suspension system on the roof truss structure for supporting the IT cable tray suspended from above over the IT equipment racks. Reflected ceiling plan and cable tray layout are provided at Appendix A.

6.2.1.1 The gypsum board ceiling shall be accessed with minimal disruption to attach the supporting braced overheard suspension system to the roof trusses and necessary cross-bracing. Reference the As-built Sections Drawing, Sheet A-6 provided at Appendix B.

6.2.1.2 Computer Room 1 has overhead cable tray that are currently supported by vertical support stanchions bolted onto the existing raised floor structure that shall remain in-place until the overhead supports are installed and connected to the cable tray.

6.2.1.3 The contactor shall take precautions to ensure no computing equipment will be taken offline (power, chilled water, or IT communication loss) during the installation of the suspension support system and components.

IT Racks are connected with power cables under the raised access floor and IT data cabling via the overhead cable tray.

6.2.2 Subtask 2.2 - Overheard Suspension System Install. Contractor shall attach the braced overheard suspension system using unistrut metal channels or equivalent connected to the interior roof truss structure through the ceiling board and suspended ceiling system to support the existing cable tray. Reference the Cable Tray Specification provided at Appendix C, Section 2.4.3 for overhead cable tray supports.

6.2.2.1 Install overhead suspension supports no more than 8’ apart per the Appendix C to support up to 350 pounds static load each.

6.2.2.2 The contractor shall have a Structural Engineer analyze the existing structure, develop the method for attachment of the cable tray suspension system, and stamp shop drawings for Government review.

6.2.2.3 Bracing requirements shall be determined to ensure all equipment mountings resist forces of 0.5 times the equipment weight in any horizontal direction and 1.5 times the equipment weight in the downward direction.

This requirement is per the UFC 4-010-01, Section B-4.4, Standard 19, does not preclude the need to size equipment mountings for forces required by other criteria such as seismic standards.

6.2.2.4 The contractor shall repair the gypsum board ceiling around the overhead suspension supports and apply fire stop sealant to meet American Society for Testing and Materials (ASTM) E814 / Underwriters Laboratories (UL) 1479 and ASTM E1966 / UL 2079, with elastomeric qualities.

6.2.2.5 The contractor shall replace any damaged suspended 2’x4’ acoustical ceiling panels with matching ceiling panels.

6.2.2.6 Contractor shall protect the existing fire suppression system, fire detection systems, grounding grid, cable tray and any other systems encountered above the suspended ceiling to ensure these systems remain operational.

6.2.2.7 All cutting of materials shall be done outside the computer room with HEPA vacuum to limit dust and with protection in place for personnel and equipment.

6.2.2.8 No stockpiling of materials shall be allowed in the data center computer room.

6.2.3 Subtask 2.3 - Cable Tray Connections. Contractor shall make connections to the suspended braced overheard suspension system to the existing cable trays. The existing cable tray shall be kept in-place to maintain data center operations. Reflected ceiling plan and cable tray layout are provided at Appendix A.

6.2.3.1 The contractor shall refer to the Cable Tray Specification at Appendix C, Section 2.4.3 for cable tray supports. All connections shall be mechanical. No welding is allowed inside the building.

6.2.4 Subtask 2.4 – Dust Control and Cleaning. Contractor shall maintain a clean area during install of the braced overheard suspension system and connections to the existing cable trays.

6.2.4.1 Dust control shall be required during all overhead activities above the IT equipment racks. Plastic dust barriers shall be used to the extent needed for dust and debris control.

6.2.4.2 Vacuum the cable trays and access floor using vacuums equipped with HEPA filtration systems, removing all dust and dirt from the sub floor area. Vacuums shall be capable of capturing particles as minute as .3 microns at a 99.97% efficiency rating.

6.2.4.3 All vacuums shall be fitted with GFCI protectors and will never be plugged in under the raised access floor or to power strips inside the IT racks. Only designated power outlets will be utilized when performing decontamination functions.

6.2.4.4 Filters shall be cleaned or replaced at the end of each working day. Vacuums shall be inspected/started outside the building each morning, before use, to ensure the integrity and cleanliness of the filtration system.

6.2.4.5 Mop and wipe down the access floor area with damp mop and/or cloths. Rinse mop and cloths frequently. Do not use excesses water, mop/cloth shall not be dripping water.

6.3 Task 3: Cable Tray Stanchion Removal.

6.3.1 Subtask 3.1 - Cable Tray Support Stanchions Removal. The contractor shall remove the existing floor mounted Cable Tray Support Stanchions. The stanchions shall be detached from the raised access flooring and carefully removed in a phased approach after ensuring over-head suspension system is fully in-place and connected to the existing cable tray. Dispose of floor mounted support stanchions off site in an environmentally safe manner.

6.3.1.1 The contractor shall ensure the grounding wires remain attached to the existing cable tray.

6.3.2 Subtask 3.2 – Replace Damaged Floor Panels. The contractor shall replace raised access floor panels that have holes from the floor mounted support stanchions with new floor panels provided on site by the Government after the support stanchions are removed.

6.4 Task 4: Close-Out Documents. The contractor shall provide project close-out documents for Government review and acceptance to include as-built drawings and warranty letters.

6.4.1 Subtask 4.1 - As-Built Drawings. The contractor shall provide As-Built Shop Drawings depicting the installed configuration of suspension system and supporting connections using AutoCAD 2021® compatible DWG and PDF formats on ANSI D size DISA supplied templates for approval.

6.4.1.1 The contractor shall update supplied AutoCAD planning drawings to show the new suspended cable tray.

No IT equipment (racks, cabinets, telephone switches) shall be shown on any drawings.

6.4.1.2 A complete set of As-Built drawings shall be provided in electronic and hard-copy format as part of this project in AutoCAD 2021 compatible and PDF formats prior to project substantial completion. Hardcopy drawing set in ANSI D size is required for all formal transmittals. Transmittals shall be made simultaneously to the project Technical POC and the DISA Facility Manager at the site for review and comment prior to final submissions.

6.4.2 Subtask 4.2 - Warranty Letter. The contractor shall provide a project warranty to include a minimum one-year parts and labor warranty on all installed equipment in writing, against defects in material and workmanship for 12 months after substantial project completion at no additional cost to the Government.

6.4.2.1 All equipment shall be installed per the manufacturer’s recommendations.

Deliverables for Task 4:

PWS

Task#

Deliverable Title Format Due Date Distribution/Co pies

Frequency and Remarks

6.4.1 As-built Drawings

of installation

Hardcopy and electronic in AutoCAD and pdf

Prior to Project Completion

Hardcopy and electronic to the Technical POC and Site POC

Draft hardcopies for review and final upon completion of installation work.

6.4.2 Warranty Letter PDF Prior to Project

Completion

Standard Distribution*

Once, at substantial project completion.

*Standard Distribution: 1 electronic copy of the transmittal letter without the deliverable to the Contracting Officer Representative (COR); 1 copy of the transmittal letter with the deliverable to the Technical POC and Site POC.

7. Performance Standards.

Performance Standard Acceptable Quality Level (AQL) Method of Surveillance

6.1 – Project Management – Project schedule, investigate existing conditions, conduct weekly project status meetings, and prepare and submit shop drawings and product data

100% schedule with complete phasing plan showing no planned data center operational interruptions.

100% review of schedule, meeting minutes and submittals

6.2.2 – Suspension System Installation

Installed materials meet technical requirements 100% of the time. Deficient work is corrected in a timely manner prior to contract completion.

100% Inspection

6.2.4 - Cleaning Cleaned area free of debris and dust through use of HEPA vacuum.

100% Inspection

6.3.1 - Cable Tray Support Stanchions Removal

Compliance with this PWS for stanchion removal.

100% Inspection

6.4.1 As-Built Drawings of

Installation

As-Built Drawings require only minor modifications to comply with technical requirements. Revisions are minor and resolved to meet contract requirement.

100% completion inspection prior to acceptance for technical compliance review.

8. Incentives. None.

9. Place of Performance. Travel in and around the primary place of performance may be required throughout the period of performance. All travel will be in accordance with FAR Part 31.205-46.

Data Center San Antonio 3326 General Hudnell (Bldg. 200) San Antonio, TX 78226

10. Period of Performance. Period of Performance is six (6) months after award.

11. Security Requirements. All work is UNCLASSIFIED. The contractor shall coordinate site visits with site POCs at least 72 hours prior to requiring any site access. Contractor personnel without security clearances performing any task under this PWS must be escorted by Government personnel who are cleared. Personal electronic devices, including cell phones, are not allowed in most areas of the building. All personnel must attend a security briefing on site prior to being accessing the facility. The primary point of contact for security and facility access issues is the Data Center San Antonio POC. All documents, both hardcopy and electronic media, shall be clearly marked, “UNCLASSIFIED – FOR OFFICIAL USE ONLY”. All information relating to the project must be protected against release to the general public. Hardcopies of documents, including CD’s, shall be shredded before disposal. The contractor shall comply with Security Requirements. Contractors will be required to apply for temporary access to the base to gain entrance through the gate and be able to drive to the work site. More information for base access will be provided during the site survey.

References:

a. DISA Form 786, DISA Statement of Information System Use and Acknowledgement of User Responsibilities

b. DISA Policy Letter, Unauthorized Connections to Network Devices, 11 September 2013

c. DISA Instruction 240-110-8, Information Security

d. DISA Instruction 240-110-36, Personnel Security

e. DISA Instruction 240-110-38, Industrial Security

f. DISA Instruction 240-110-43, Insider Threat Program

g. DISA Instruction 630-230-19, Cybersecurity

h. DoDM 5200.01, Vol 1-4 Information Security Program, 24 February 2012

i. DOD 5200.02, Procedures for the DoD Personnel Security Program, 3 April 2017

j. DoD Instruction 5200.48, Controlled Unclassified Information (CUI), 6 March 2020

k. DOD 5220.22-M, National Industrial Security Program Operating Manual, February 2006

Incorporating Change 02 May 2016

11.1 Facility Security Clearance. The work to be performed under this contract/order is Unclassified. Therefore, the company does NOT require a Secret Facility Clearance from the Defense Security Service Facility Clearance Branch.

11.2 Security Clearance. All personnel performing on or supporting a DISA contract/order in any way shall be U.S. citizens.

11.3 Investigation Requirements. Not Applicable.

11.4 Visit Authorization Letters (VAL). Visit requests shall be processed and verified through the Defense Information System for Security (DISS). DISS visits for contracts/orders are identified as “Other” or “TAD/TDY” and will include the Contract/Order Number and ADP/IT-Access level of the contract/order in the Additional Information section. Contractors that do not have access to DISS may submit visit authorizations by e-mail in a password protected .pdf to the Contracting Officer Representative (COR) specified in Section 1.0.

If DISS is not available, the VAL must contain the following information on company letterhead

Company’s name, address, telephone number, assigned CAGE Code, facility security clearance CAGE Code Contract/Order Number Name, SSN, date and place of birth, and citizenship of the employee intending to visit Certification of personnel security clearance and any special access authorizations required for the visit

(type of investigation & date, adjudication date & agency, and IT access level).

Name of COR/Alt COR Dates or period the VAL is to be valid.

11.5 Security Contacts. DISA Security Personnel can be contacted for Industrial or Personnel Security related issues at (301) 225-1235 or via mail at:

Defense Information Systems Agency Defense Information Systems Agency ATTN: MP61, Industrial Security ATTN: MP62, Personnel Security Command Building Command Building 6910 Cooper Ave. 6910 Cooper Ave.

Fort Meade, MD 20755-7088 Fort Meade, MD 20755-7088

For Data Center San Antonio specific security related matters, contact the Site Security Manager:

DISA Data Center San Antonio Security Management Name: Dewain Freeman Phone Number: (210) 672-3102 E-mail: disa.jbsa.opa.mbx.security-mgmt-office@mail.mil

11.6 Information Security and other miscellaneous requirements.

11.6.1 Contractor personnel shall comply with all local security requirements including entry and exit control for personnel and property at the Government facility.

11.6.2 Contractor employees shall be required to comply with all Government security regulations and requirements.

Initial and periodic safety and security training and briefings will be provided by Government security personnel.

Failure to comply with Government security regulations and requirements shall require the company to provide the Government with a written remediation/corrective action plan; furthermore, failure to comply with such requirements can be cause for removal and the contractor will not be able to provide service on this contract/order.

11.6.3 Contractor employees with an incident report in JPAS who have had their access to classified suspended will not be permitted to fill positions requiring access to classified information on a DISA contract/order.

11.6.4 The Contractor shall not divulge any information, classified or unclassified, about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.

11.6.5 DISA retains the right to request removal of contractor personnel regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the Government.

11.6.6 Contractor personnel will generate or handle documents that contain For Official Use Only information at the Government facility. Contractor shall have access to, generate, and handle classified material only at the location(s) listed in the place of performance section of this document. All contractor deliverables shall be marked in accordance with DoDM 5200.1, Vol. 3, Vol. 4, Information Security, DOD 5400.7-R, Freedom of Information Act Program, unless otherwise directed by the Government. The contractor shall comply with the provisions of the DoD Industrial Security Manual for handling classified material and producing deliverables. The contractor shall comply with DISA Instruction 630-230-19, Cybersecurity.

12. Government Furnished Property (GFP)/Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). Not Applicable.

13. Other Pertinent Information or Special Considerations. Not Applicable.

a. Identification of Possible Follow-on Work. Not Applicable.

b. Identification of Potential Conflicts of Interest (COI). Not Applicable.

c. Identification of Non-Disclosure Requirements. Not Applicable.

d. Packaging, Packing and Shipping Instructions. As provided by manufacturer. Outer packages shall not have any special markings, other than standard information used in common business practice. The delivery information in Paragraph 1 above is for US Postal Mail. Contact the COR for FedEx or other courier deliveries.

Outer packages shall not have any special marking other than standard information used in common business practice. For electronic submissions, documents shall be submitted in searchable (not scanned) Adobe Acrobat version 10 or later. Shop drawings shall be in AutoCAD (.dwg) 2021 format in addition to, not in lieu of, Adobe Acrobat (.pdf). All electronic files shall be scanned for viruses prior to submission. Email transmittal of electronic documents is acceptable, providing each document does not exceed 5Mb attached file size. Multiple files to meet this requirement are acceptable.

e. Inspection and Acceptance Criteria. Inspection shall be performed by visual observation by Government representatives prior to Government acceptance.

f. Property Accountability. Not Applicable.

g. Transitioning. Not Applicable.

h. Supply Chain Risk Management (SCRM). Not Applicable.

i. Training. Not Applicable.

14. Section 508 Accessibility Standards. The following Section 508 Accessibility Standard(s) (Technical Standards and Functional Performance Criteria) are applicable (if box is checked) to this acquisition.

Technical Standards

1194.21 - Software Applications and Operating Systems

1194.22 - Web Based Intranet and Internet Information and Applications

1194.23 - Telecommunications Products

1194.24 - Video and Multimedia Products

1194.25 - Self-Contained, Closed Products

1194.26 - Desktop and Portable Computers

1194.41 - Information, Documentation and Support

The Technical Standards above facilitate the assurance that the maximum technical standards are provided to the Offerors. Functional Performance Criteria is the minimally acceptable standards to ensure Section 508 compliance.

This block is checked to ensure that the minimally acceptable electronic and information technology (E&IT) products are proposed.

Functional Performance Criteria

1194.31 - Functional Performance Criteria

15. Appendices:

Appendix A – Computer Room 1 Cable Tray Drawing Appendix B – As-Built Sections Drawing, Sheet A-6 Appendix C – Cable Tray Specification

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Lot Materials and Labor

FFP

This project will replace the existing floor mounted support stanchions with braced overheard suspension system to suspend the IT Cable Tray in Computer Room 1 (CR1) from the interior roof structure above the IT racks to meet the requirement of DoD Core Data Center (CDC) reference architecture and engineering standards.

All work shall be completed in accordance to all Solicitation attachments and PWS dated 28 May 2021.

FOB: Destination

PSC CD: J054

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Lot Travel

COST

Travel shall be authorized, in writing, by the Contracting Officer Representative, prior to travel taking place. Travel shall be paid IAW JTR schedule and FAR Subpart 31.205-46. The contractor shall bill in accordance with the JTR.

PSC CD: J054

ESTIMATED COST

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-SEP-2021 TO

28-FEB-2022

N/A N/A

0002 POP 01-SEP-2021 TO

28-FEB-2022

N/A N/A

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUN 2020 52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

JUN 2020

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

JUN 2020

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

JUN 2020

52.204-19 Incorporation by Reference of Representations and Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.204-26 Covered Telecommunications Equipment or Services--

Representation.

OCT 2020

52.207-4 Economic Purchase Quantity-Supplies AUG 1987 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.212-5 (Dev) Contract Terms and Conditions Required to Implement

Statutes or Executive Orders--Commercial Items (Deviation 2018-O0021)

JAN 2021

52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards AUG 2018 52.222-50 Combating Trafficking in Persons OCT 2020 52.222-51 Exemption from Application of the Service Contract Labor

Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements

MAY 2014

52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

JUN 2020

52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.229-11 Tax on Certain Foreign Procurements--Notice and Representation

JUN 2020

52.232-18 Availability Of Funds APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.244-6 Subcontracts for Commercial Items NOV 2020 52.246-23 Limitation Of Liability FEB 1997 52.246-25 Limitation Of Liability--Services FEB 1997 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations

SEP 2019

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

JAN 2018

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7013 Duty-Free Entry--Basic APR 2020 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7048 Export-Controlled Items JUN 2013 252.225-7050 Disclosure of Ownership or Control by the Government of a

Country that is a State Sponsor of Terrorism

DEC 2018

252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.

OCT 2020

252.226-7001 Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns

APR 2019

252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014 252.227-7015 Technical Data--Commercial Items FEB 2014 252.227-7037 Validation of Restrictive Markings on Technical Data SEP 2016 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.244-7000 Subcontracts for Commercial Items JAN 2021 252.247-7022 Representation of Extent of Transportation by Sea. JUN 2019 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

July 28, 2021

Offerors,

1. This request for proposal (RFP) is to support the OC Services Directorate Computing

Ecosystem’s requirement for Columbus In Row Cooling Aisle. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, in conjunction with FAR 13, as applicable, and as supplemented with additional information included in this notice. This solicitation document and incorporated provisions and clauses are those in effect through FAR Circular 2021-05 and the Defense Federal Acquisition Supplement.

The specifics are as follows:

Tracking Number 832118548 / HC102821R0061 Task/Delivery Order Title Cable Tray

Small Business Set Aside Yes Contract Type Firm Fixed Price (FFP) Other Direct Charges (ODCs) / Travel

FFP, COST/Travel

Period of Performance 01 September 2021 – 28 February 2022 (six months) Section 508 Applicable No Method of Evaluation Lowest Price Technically Acceptable (LPTA) Performance Based Yes DD254 Required No Proposal/No Bid Due Date

August 27, 2021 NLT 2:00PM Central Time

2. Offerors are requested to submit a written technical and price proposal in response to the attached Performance Work Statement) (Attachment 1). The initial Quality Assurance Surveillance Plan (QASP) (Attachment 2) is also attached for contractor reference. Proposals should be prepared in accordance with (IAW) the RFP. Further information on submission of technical and price proposals is provided throughout this document.

a. Each offeror shall specifically identify in its proposal, whether or not any potential or actual Organizational and Consultant Conflicts of Interest (OCCI) as described in FAR Subpart 9.5 exists for this procurement. The OCCI language is contained along with the FAR/DFARS provisions/clauses as H1, Organizational and Consultant Conflicts of Interest (OCCI). If the offeror believes that no OCCI exists, the OCCI response shall set forth sufficient details to support such a position. If an offeror believes that an actual or perceived OCCI does exist on this procurement, the offeror shall submit an OCCI plan with the proposal, explaining in detail how the OCCI will be mitigated and/or avoided.

b. Proposals should be submitted to the contract specialist at DITCO via the following email address: ronald.e.witt4.civ@mail.mil and cody.t.badgett.civ@mail.mil.

c. Government Furnished Property will not be utilized.

d. Section 508 Accessibility Standards do not apply to this requirement.

e. The following administrative requirements apply to the offerors’ proposals in response to the RFP. The technical portion of the proposal shall include information regarding the offeror’s ability to conform to all required terms and conditions in the solicitation. A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches. Page limitations are identified below. If exceeded, excess pages will not be read or considered in evaluation of the proposal. The following items will not be considered when calculating page limits: cover page, table of contents, glossary, executive summary, generic resumes, OCCI mitigation plans, SCRM plans, GFP Attachment, Fixed Price Payment Plans, FAR/DFARS Provisions/Clauses attachment, and Section 508 compliance. In the event any evaluation notices are issued, page limitations may also be placed on those. The technical portion of the proposal shall be submitted in Microsoft (MS) Word 2007 or newer file. The page format shall have a 1 inch margin using no smaller than an 11 point Arial, Times New Roman, or Courier New font for all text to include any text contained in a table. The price proposal spreadsheet shall be a separate document from the technical proposal and shall be submitted in MSExcel 2007 format. All formulas shall remain present in the spreadsheet for verification. The total size of each email (including all attachments) shall not exceed 20MB. It is the sole responsibility of the offeror to ensure that the electronic files submitted are virus free and can be opened and read by the Government.

Proposal submissions shall not be locked, encrypted, or otherwise contain barriers to opening.

The Government is under no obligation to seek clarification regarding electronic proposal submissions if submissions cannot be opened or accessed. Page limitations shall not be circumvented by including text boxes/pop-ups or internet links to additional information; such inclusions are not acceptable and will not be considered part of a proposal. The Government reserves the right not to consider for award any proposal that does not adhere to the administrative requirements of this RFP.

3. Evaluation Factors and Basis for Award Determination:

a. Award will be made to the offeror whose proposal is determined to represent the overall best value to the Government using an LPTA evaluation process The evaluation factors and subfactors identified in paragraph 3c(1) and paragraph 3c(2) below will be used in the determination of technical acceptability. The total proposal shall not exceed 10 pages.

b. After receipt of proposals, the Government will first evaluate the lowest price proposal. If the lowest price proposal is determined to be technically acceptable and otherwise properly awardable, award will be made to that offeror. The Government reserves the right to evaluate only the lowest price proposal or to conduct further evaluations of additional proposals.

c. The standards for determining technical acceptability are below, as well as information concerning price proposals.

1. Subfactor 1: PWS Paragraph 6.1.1. In order for this subfactor to be rated Acceptable, the contractor shall submit a draft executable schedule with stated tasks for system planning and installation that identifies all milestones to include start dates (draft schedule shall use October 1, 2021 as Day 1), submittal dates, estimated start dates, and completion dates necessary to complete the planning, purchase, installation and operational testing of equipment to include as a minimum: Task 1 – Develop Detailed Plan to include site investigation of existing conditions, preparing installation schematics and shop drawings, and submitting product data sheets; Task 2 – Installation of the Cable Tray Support system to include accessing ceiling void, installing tie rods and connecting existing cable tray; and Task 3 – Removing existing cable tray support stanchions. The draft schedule shall be prepared using Microsoft Project or similar program to demonstrate the project can be reasonably accomplished within the stated Period of Performance of six months.

2. Subfactor 2: PWS Paragraph 6.2. In order for this subfactor to be rated Acceptable, the contractor shall provide detailed information describing the specific cable tray suspension materials expected to be used and connections proposed for installation to meet the requirements in the PWS Task 2 Suspension Tie Rod Installation. The contractor shall submit the manufacturer’s material information sheets (OEM data sheets) for any proposed materials to meet PWS Paragraph 6.2.2 and 6.2.3.

d. Offerors should ensure price proposals include detailed information regarding the resources required to accomplish the task (e.g., labor categories, labor hours, number of employees for each labor category, rates, travel, incidental equipment, contract access fees, etc.).

e. All travel must show the specific detail, if known (e.g., number of days, locations, number of personnel, etc.). All ODCs shall annotate the specific detail (e.g., quantity, part number, manufacturer, etc.) to include supporting documentation to justify the costs (i.e., price quotes, price history, etc.). Travel shall be authorized by the Contracting Officer Representative (COR) in writing prior to performance and will be paid IAW FAR 31.205-46. No profit or fee will be authorized for travel or ODCs. Applicable burdens, e.g., G&A, may apply to travel and ODCs IAW the contractor’s accounting practices.

f. Due to the likely inability of any offeror to accurately estimate travel and material/equipment purchases associated with this requirement, the Government is providing plug numbers to be used by all offerors when proposing ODCs. Offerors are instructed to propose plug numbers for ODCs in the EXACT amounts provided below, however actual travel shall be authorized by the COR in writing prior to performance and will be paid IAW FAR 31.205-46. No profit or fee will be authorized for travel or ODCs. Applicable burdens, e.g., G&A, may apply to travel and ODCs IAW the contractor’s accounting practices.]

Travel ODCs Base Year: $50,000.00

4. Offerors shall propose a fixed price payment plan as a separate document commensurate with the value of the deliverables and/or significant milestones in the SOW for this requirement. A fixed price payment plan with the total dollar amount divided into 12 equal monthly payments will not be accepted unless the offeror provides justification for this plan that the Government subsequently deems adequate. If justification is provided and deemed adequate, the offeror shall ensure their monthly price (total price divided by 12), comes to no more than two decimal places.

The eventual awardee will be authorized to invoice monthly for all approved travel costs incurred and approved by the COR.

5. The Government intends to evaluate proposals and award a contract without exchanges with offerors. However, the Government reserves the right to conduct exchanges or seek clarifications if the Contracting Officer (KO) determines they are necessary. In the event issues pertaining to a proposed task cannot be resolved to the KO’s satisfaction, the Government reserves the right to withdraw and cancel the proposed task order. In such an event, offerors will be notified in writing. In the event a competitive range is established and the KO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the KO may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition.

6. The solicitation contains provisions that apply to this solicitation and clauses that will be applicable to the resulting award. Some of the provisions and additional DITCO instructions require a response from the offeror and will need to be submitted along with your proposal. The plan required by DFARS 252.237-7024, Notice of Continuation of Essential Contractor Service, will be evaluated for acceptability based on the requirements of DFARS 252.237-7024 (2)(i-v).

7. In response to this RFP, no terms, conditions, or assumptions will be entertained. If terms, conditions, or assumptions are included in a proposal, the proposal may be excluded on grounds that it failed to comply with the RFP’s instructions.

8. An offeror agrees that if its offer is accepted within 60 calendar days from the date of receipt of proposals (unless a different period is stated in the proposal), it will furnish the items and/or services identified in its proposal at the cost offered to the designated point(s) within the time specified in the contract. You also agree that if the Government awards you the contract, the award document sent by the Government to the contractor is a binding and enforceable contract.

The contractor has a legal obligation to perform in compliance with all aspects of the PWS if awarded the contract

9. Any questions should be addressed to ronald.e.witt4.civ@mail.mil and cody.t.badgett.civ@mail.mil. The phone number is (618) 418-6864. Please provide any questions, in writing, no later than August 11, 2021 at 2:00pm Central Time (CT). The Government reserves the right to not answer questions submitted after this time.

10. Proposals are due no later than August 27, 2021 at 2:00pm (CT) and should be submitted to the contract specialist at DITCO via the following email address:

ronald.e.witt4.civ@mail.mil and cody.t.badgett.civ@mail.mil.

Sincerely, CODY T. BADGETT

CONTRACTING OFFICER

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation…