PWS_attachment_1.pdf
PDF 64 KB Posted
- Attached to
- HC102818R0152- AZ UPS Maintenance Federal contract opportunity
- Solicitation number
- HC102818R0152
- Issued by
- Defense Information Systems Agency
About this file
PWS attachment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC102818R0152_amd_01.pdf | ||
| HC102818R0152_QA_.pdf | ||
| Price_Evaluation_Spreadsheet.xlsx | XLSX spreadsheet | |
| QASP.docx | DOCX document | |
| HC102818R0152_RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPS LIST
Unit Number
Bldg.
Rating (KVA or
KW)
Input/Output Voltage
Make (MFR) Model # Serial # Year Installed
Capacitor Replace-ment Due
Date
Number of
Battery Banks
Number of
Batterie s Per Bank
Quantity /Type Batteries
Date Batteries Replaced
1 57305 225 kVA
480/480 VAC MGE Galaxy Galaxy PW 50XH37004 2008 11/19
Bank 1 40 80/ Deka Unigy
31HR5000 6/2016
Bank 2 40 80/ Deka Unigy
31HR5000
6/2016
2 57305 225 kVA 480/480 VAC MGE Galaxy Galaxy PW 50XH37003 2008 11/19
Bank 1 40 80/ Deka Unigy
31HR5000 6/2016
Bank 2 40 80/ Deka Unigy
31HR5000 6/2016
3 57305 300 kVA
480/480 VAC
TOSHIBA G9000 10-7E4168900042 2011 11/21
Bank 1 40 80/Data Safe 12HX505-
FR 2/2016
Bank 2 40 80/Data Safe 12HX505-
FR 2/2016
4 57428C 100 kVA
208/120/208
VAC
MGE Comet 72-160402-42 B03-11619 2003 11/19
Bank 1 36 72/ C&D UPS 12-
300MR 5/2015
Bank 2 36 72/ C&D UPS 12-
300MR 5/2015
5 57428E 100 kVA
208/120/208
VAC
LIEBERT NPOWER 37-2408 2003 11/19
Bank 1 40 80/ C&D UPS12-
540MR
5/2015
Bank 2 40 80/ C&D UPS12-540MR 5/2015
6 57435 48kW, 208V 3-ph EATON
ZP22415000X
X000 BK072P0002 2016 11/19 Bank 1 160 5Ah /VRLA-AGM 2/2016
7 57439 40 kW
208/120/208
VAC
APC
Symmetra
SYCF40KF PD0553341098 2018 11/24 1 16 16/VRLA-SYBTU1-PLP 5/2018
UPS LIST (Continued)
Number Bldg.
Rating (KVA or
KW)
Input/Output Voltage
Make (MFR) Model # Serial # Year Installed Cap Date
Number of
Battery Banks
Number of
Batteries Per Bank
Quantity /Type Batteries Date
Batteries Replaced
57428F 30kVA
208/120/208 VAC (2 Units)
APC
Symmetra
SYMSTRF_P
D
ED013S001120,
ED013S001122 2005 11/19
Bank 1 16 36/ C&D UPS12-300MR 5/2015
Bank 2 16 36/C&D UPS12-300MR 5/2015
Bank 3 16 36/C&D UPS12-300MR 5/2015
Bank 4 16 36/C&D UPS12-300MR 5/2015
10 57439A 100 kVA
208/120/208
VAC
MGE Comet 72-160402-42 B07-10013 2007 11/19 1 36 36/ C&D UPS12-400MR 9/2016
11 57439B 150 kVA
208/120/208
VAC
MGE Comet 72-160402-02 B07-12557 2005 11/19 Bank 1 36 36/ C&D UPS12-300MR 5/2016
Bank 2 36 36/ C&D UPS12-300MR 5/2016
12 57439B
80kW
Maintenance does not start until 14
October 2018 when unit goes out of warranty
Schneider Electric SYCF100KF QD1734140464 2018 11/24
Bank 1
Bank 2
32/VRLA SYBTU2-PLP
36/VRLA SYBTU2-PLP
2/2018
NEW
13 57428
40kW
208/120 VAC
Maintenance does not start until 01
August 2019 when the unit goes of warranty
APC
Symmetra SYCF40KF QD1816340504 2018 11/24 1 32 32/VRLA SYBTU1-PLP 7/2018
DC POWER PLANT LIST
Number Bldg.
Rating (KVA or KW) Input/Output
Voltage Make (MFR) Model # Serial #
Number of Battery Banks
Number of Batteries Per
Bank
Quantity /Type Batteries
Date Batteries Replaced
1 57305 0 KVA Power one PB980362 48519-21 1 Bank 24
24/VRLA
C&D Technologies msEndur II AT-27 1495Ah @ 8hr to
1.75VPC
Due Base Year
(Optional
CLIN)
2 57305 0 KVA Lorain 1231A2 16674 1 Bank 24
24/ VLRA
C&D Technologies msEndur II AT-25P 1380Ah @ 8hr to
1.75VPC
8/2018
3 57305 0 KVA Astec NT6C25BB ADPL01002 ZYL 1 Bank 24
24/VRLA
C&D Technologies msEndur II AT-25P 1380Ah @ 8hr to
1.75VPC
8/2018
4 57305 0 KVA Sageon SP48 1PS034068 3 Banks 24
72/VRLA
23 Liberty HD1500 1495Ah @ 8hr to
1.75VPC
1 C&D Technologies msEndur II AT-27P 1560Ah @ 8hr to
1.75VPC
48 Liberty HD2000 2000Ah @ 8hr to
1.75VPC
Due Base Year
(Optional
CLIN)
DC POWER PLANT LIST (Continued)
Number Bldg.
Rating (KVA or KW) Input/Output
Voltage Make (MFR) Model # Serial #
Number of Battery Banks
Number of Batteries Per
Bank
Quantity /Type Batteries
Date Batteries Replaced
5 57305 0 KVA Sageon SP48 JPS0829758 3 Banks 24
72/VRLA
72 C&D Technologies msEndur II AT-39P
2180Ah @8hr to
1.75VPC
Due Base Year
(Optional
CLIN)
6 57439B 48KVA Sageon SP48 HPS051155 6 1 Bank 24
24/VRLA
24 C&D Technologies msEndur II AT-35P 2040Ah @ 8hr to
1.75VPC
8/2018