Attach_1_QASP.docx
DOCX document 36 KB Posted
- Attached to
- DISA Armed Guards Federal contract opportunity
- Solicitation number
- HC102818R0102
- Issued by
- Defense Information Systems Agency
About this file
Attachment 1 - Quality Assurance Surveillance Plan (QASP)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_QA_HC102818R0102_Armed_Guards_4.pdf | ||
| RFP_QA_HC102818R0102_Armed_Guards_3.pdf | ||
| RFP_QA_HC102818R0102_Armed_Guards_2.pdf | ||
| RFP_QA_HC102818R0102_Armed_Guards.pdf | ||
| Attach_6_NDA.docx | DOCX document | |
| Attach_2_Solicitation_DD254.pdf | ||
| Attach_3_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| Attach_5_Past_Performance_References.doc | DOC document | |
| RFP_HC102818R0102.docx | DOCX document | |
| Attach_4_Eval_Table.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title (Add contract/task order number at award): Access control and physical security support for Defense Information Systems Agency (DISA) Computing Data Center locations managed by the Data Center Line of Business (LOB) as part of the DISA EcoSystem.
2. Purpose:
This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
3. Roles and Responsibilities:
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Other Key Government Personnel- This may include performance monitors, inspectors, technical experts, workforce service division and center directorate level security personnel, requirements office, or others (i.e. users) who provide information that helps the COR monitor contractor performance.
4. Primary Method of Surveillance
· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
· Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.
5. Performance Standards:
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Calculation |
| Task 6.1- Security Specialist support |
| Provide Security Specialist support 0600-2200 hours local time per day, five days per week excluding Federal Government Holidays, ensuring adequate coverage to receive visitors and deliveries/packages without leaving the security control desk unattended for periods greater than 10 minutes during core hours of 0730 to 1600 local time. AQL must be met 100% of the time with no more than 2 complaints filed by customers within a month. |
| 100% Inspection, Customer input |
| Subtask 6.1.12 & 6.2.12- SAR request |
| Contractor shall provide DD2875 SAR security support. All SAR requests must be processed within 2 hours and be error free 99% of time. No more than 2 complaints filed by customers within a month. |
100% inspection, Customer input
| Task 6.2- Armed Guard support |
| Provide Security Access control support 24 hours a day, 7 days a week, 365 days per year, ensuring adequate coverage to receive visitors and deliveries/packages without leaving the security control desk unattended for periods greater than 10 minutes. AQL must be met 100% of the time with no more than 2 complaints filed by customers within a month. |
| 100% Inspection, Customer input |
| Task 6.3.4- Resource Management |
| Contract shall be fully staffed with qualified personnel. Vacancies shall be filled within 30 calendar days with fully functional FTEs ready to perform duties. Staffing shall be maintained at acceptable levels to assure prompt and courteous service at least 98% of the time. |
| 100% Inspection |
| Task 6.3- Deliverables on time and accurate |
| All deliverables shall be delivered on time and without material errors at least 95% of the time. Minor errors that do occur are resolved within 2 business days and resubmitted. |
| 100% inspection |
Incentives/Disincentives:
The Government shall review the Contractor's performance based on the quality assurance surveillance plan objectives. The Government will make determinations for option period awards based on contract performance, as measured by this surveillance plan and other inputs, as well as other considerations. The Contractor is incentivized to earn favorable Government reviews to support continuation of similar work, and to support contract awards with other Government agencies seeking DISA's input on Contractor's past performance.
The Contractor will be subject to a disincentive where staffing levels are not maintained as specified in Section 6, and Deliverables specified in Section 10.
Vacancies must be back filled with fully functional FTEs ready to perform duties within 30 calendar days. If the contractor fails to meet the AQL in filling positions within 30 calendar days, the decrement to the invoice will compound as follows:
Personnel Staffing Measurement Metrics:
Good= >98% Positions filled
Fair= 97% - 90% Positions filled
Poor= 89% - 80% Positions filled
Unacceptable= <79% Positions filled
Personnel staffing disincentives are applied for ratings of "Fair", "Poor" and "Unacceptable" as follows:
Fair= -10% disincentive monthly
Poor= -20% disincentive monthly
Unacceptable= -30% disincentive monthly.
As an additional disincentive, there will be a 1% reduction in the monthly invoice amount for any late deliverables, unless the contracting officer finds that any such late deliverables were caused by the government.
These specific disincentives do not limit the Government’s other remedies, including terminating the contract for default and reporting negative performance in PPIRS/CPARS.
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 1). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 2) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the KO.
When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 3).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.
7. Mandatory or regulatory compliance items The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
8. Acceptable Quality Level (AQL):
The AQL for this project is 95-100% due to the critical support provided by mainframe operations.
9. Evaluation Method:
The COR will document the time of verbal notification to the contractor. The COR will document the official time and date of notification on the Maintenance Call Record. The COR will review self-diagnostic systems logs, conduct a comparison with actual maintenance performance and otherwise verify and validate contractor performance. The contractor shall enter in the record the official time the system is restored to full operational status. The COR will confirm the date and time of problem resolution in the record.
10. Performance Rating
In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).
Performance Rating Criteria
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 1 – Performance Assessment Report
Appendix 2 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 3 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2
Encl 4, QASP 23Jun2017/v3
File details come from the government source that posted it.