Updated_CMT16PCM0012_PWS.doc

DOC document 105 KB Posted

Attached to
Vault beam design, assembly, and installation at DISA PAC Federal contract opportunity
Solicitation number
HC1028-16-T-0237
Issued by
Defense Information Systems Agency

About this file

Performance Work Statement (PWS)

View the file

Other files for this federal contract opportunity

Other files attached to Vault beam design, assembly, and installation at DISA PAC, newest first.
File Type Posted
HC1028-16-T-0096-0002.pdf PDF
CLIN_worksheet.xlsx XLSX spreadsheet
RFQ_CMT16PCM0012.docx DOCX document
CMT16PCM0012_PWS_Revised_20160411.doc DOC document
HC1028-16-T-0237-0001.pdf PDF
CMT16PCM0012_EPL.xls XLS spreadsheet
HC1028-16-T-0237.pdf PDF
CMT16PCM0012_-_QASP.docx DOCX document
CMT16PCM0012_encl10a_evalplan_rating_lpta.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

As of 30 Mar 2016

Contract Number:
TBA
Tracking Number:
HC1028-16-T-0237
Follow-on to Previous Contract and Task Order Number:
N/A

1. Contracting Officer Representative (COR).

a. Primary COR.

Name:
Sandra M. Barker
Organization:
EMSS Gateway Facility

Department of Defense Activity Address Code (DODAAC):

HC1003

Address:
Building 108, Saipan Drive, JBPHH Wahiawa Annex, Wahiawa, HI 96786
Phone Number:
(808) 653-0952
Fax Number:
(808) 653-4049
E-Mail Address:
sandra.m.barker.civ@mail.mil

b. Alternate COR.

Name:
Jennifer L. Aoki
Organization:
EMSS Gateway Facility
DODAAC:
HC1003
Address:
Building 108, Saipan Drive, JBPHH Wahiawa Annex, Wahiawa, HI 96786
Phone Number:
(808) 653-0951
Fax Number:
(808) 653-0253
E-Mail Address:
jennifer.l.aoki.civ@mail.mil

2. Contract or Task Order Title. GW Facility Preparation for COMSEC Support Reinforce Floor

3. Background. A COMSEC Room is urgently needed in the EMSS Gateway for use as COMSEC operations and storage room. Currently the EMSS Security Office is being used for COMSEC operations which at times render the Security Office unusable for daily security operations. This causes a conflict when there is a security incident that requires immediate action or privacy. There are also times when COMSEC operations require the use of the room and it is being used for urgent security requirements and cannot be vacated. Both programs have their own unique security requirements and a separate secure COMSEC Room will insure the adequate security and privacy needed by both programs especially with an anticipated growth in the COMSEC program.

During the installation of the vault it was discovered there was a problem with the floor under the vault sagging. A work request was submitted to NAVFAC to check out the floor. NAVFAC recommended the floor be reinforced and the vault structure moved across the room to the reinforced floor.

4. Objectives: To reinforce the floor in Room 108, Building 108, Saipan Drive, JBPHH Wahiawa Annex, Wahiawa, HI. Floor must be reinforced to support 45,000 pounds.

5. Scope: Contractor will design, fabricate and install beam assembly to augment existing under floor beam to increase floor load capacity to support 45,000 pounds. The floor must support a vault that is approximately 13 feet wide by 19 feet long by 9 feet high and weighing 37,000 lbs. Additional 8,000 pounds will be safes, furniture, shelving and people.

Contractor will provide one hard copy and one soft copy of AutoCAD As-Built drawings for vault and floor reinforcement. Contractor will provide the following documentation for the project: a) Vault documentation, b) Framing Plan Elevation and Sections Drawing, c) Structural Notes and Floor Plan, and d) Pounds per sq. ft. rating upon completion of work.

6. Performance Requirements.

6.1 Task 1 - Contractor will design, fabricate and install beam assembly to augment existing under floor beam to increase floor load capacity to support 45,000 pounds

Deliverables – Beam assembly

6.2 Task 2 – Contractor will provide floor reinforcement AutoCAD As-Built drawings, Framing Plan, Elevation and Sections Drawing, Structural Notes and Floor Plan, Pounds per sq. ft. rating 15 days after completion of installation of beam assembly.

Deliverables - Project documentation and drawings.

7. Performance Standards.

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance

6.1 Design, fabricate and install beam assembly to augment existing under floor beam to increase floor load capacity to support 45,000 pounds

Materials are delivered on time at least 100% of the time. Installation completed as required by specification 100% of the time.
Routine inspection of deliverable products and services.
6.2 Provide documentation and drawings
Drawings must be accurate and complete 100% of the time. Other documentation must be complete and delivered on time 100% of the time
Routine inspection of deliverable products and services

8. Incentives: N/A

9. Place of Performance. EMSS Gateway Facility, Building 108, Saipan Drive, JBPHH, Wahiawa, HI 96786.

Alternate Place of Performance - Contingency Only. As determined by the Contracting Officer’s Representative (COR), contractor employees may be required to work at an alternate place of performance (e.g., home, the contractor's facility, or another approved activity within the local travel area) in cases of unforeseen conditions or contingencies (e.g., pandemic conditions, exercises, government closure due to inclement weather, etc.). Non-emergency/non-essential contractors should not report to a closed government facility. Contractor shall prepare all deliverables and other contract documentation utilizing contractor resources. To the extent possible, the contractor shall use best efforts to provide the same level of support as stated in the PWS. In the event the services are impacted, reduced, compromised, etc., the Contracting Officer or the contractor may request an equitable adjustment pursuant to the Changes clause of the contract.

10. Period of Performance. 15 May 2016 to 15 Aug 2016. As directed by the COR, the contractor shall continue performance in emergency or mission essential conditions. Additionally, the contractor may be required to account for the whereabouts of their personnel should this information be requested by the COR.

11. Delivery Schedule.

PWS Task#
Deliverable Title
Format
Due Date
Distribution/Copies
Frequency and Remarks
6.1
Beam Assembly
Contractor determined
30 days after contract award
Building 108, Saipan Drive
Once
6.2
Documentation and drawings
AutoCAD drawings and contractor determined format for documentation
15 days after completion of project
Standard Distribution*
Once

*Standard Distribution: Deliverable to the Primary COR.

12. Security. Work conducted at the EMSS site will be performed in a TOP SECRET area. All contractor personnel will be escorted while on site. Two weeks prior to the start of the project, the contractor shall submit a visit request for all personnel. No cell phones, two way pagers, memory sticks or other recordable media will be allowed in the building where work will be performed. Laptops and other tools used to conduct the installation may be allowed after a thorough security check by EMSS Security Officer.

13. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). None

14. Other Pertinent Information or Special Considerations. None

a. Identification of Possible Follow-on Work.

b. Identification of Potential Conflicts of Interest (COI).

c. Identification of Non-Disclosure Requirements.

d. Packaging, Packing and Shipping Instructions.

e. Inspection and Acceptance Criteria.

f. Property Accountability. The contractor shall submit the attached Electronic Product List (see below) in addition to complying with all requirements of DFARS 252.211-7003. See DARS 252.211-9000, Requirement to Submit an Electronic Product List for additional information.

15. Section 508 Accessibility Standards. The following Section 508 Accessibility Standard(s) (Technical Standards and Functional Performance Criteria) are applicable (if box is checked) to this acquisition.

Technical Standards

FORMCHECKBOX

1194.21 - Software Applications and Operating Systems

FORMCHECKBOX

1194.22 - Web Based Intranet and Internet Information and Applications

FORMCHECKBOX

1194.23 - Telecommunications Products

FORMCHECKBOX

1194.24 - Video and Multimedia Products

FORMCHECKBOX

1194.25 - Self-Contained, Closed Products

FORMCHECKBOX

1194.26 - Desktop and Portable Computers

FORMCHECKBOX

1194.41 - Information, Documentation and Support

The Technical Standards above facilitate the assurance that the maximum technical standards are provided to the Offerors. Functional Performance Criteria is the minimally acceptable standards to ensure Section 508 compliance. This block is checked to ensure that the minimally acceptable electronic and information technology (E&IT) products are proposed.

Functional Performance Criteria

FORMCHECKBOX

1194.31 - Functional Performance Criteria

Page 1 of 1 Pages

PAGE

Page 3 of 4 Pages

_1520937804.xls Sheet1

Manufacturer NameModel
NumberSerial
Number/Key CodeContract
NumberDelivery Order Number
(if applicable)Funding Document
NumberContract Line Item No. (CLIN)
SubCLIN (SLIN)Unique Item Identifier (see DFARS 252.211-7003c)Customer
OrganizationDelivery

Address