CMT16PCM0012_-_QASP.docx

DOCX document 24 KB Posted

Attached to
Vault beam design, assembly, and installation at DISA PAC Federal contract opportunity
Solicitation number
HC1028-16-T-0237
Issued by
Defense Information Systems Agency

About this file

Quality Assurance Surveillance Plan (QASP)

View the file

Other files for this federal contract opportunity

Other files attached to Vault beam design, assembly, and installation at DISA PAC, newest first.
File Type Posted
HC1028-16-T-0096-0002.pdf PDF
CLIN_worksheet.xlsx XLSX spreadsheet
RFQ_CMT16PCM0012.docx DOCX document
CMT16PCM0012_PWS_Revised_20160411.doc DOC document
HC1028-16-T-0237-0001.pdf PDF
HC1028-16-T-0237.pdf PDF
CMT16PCM0012_EPL.xls XLS spreadsheet
Updated_CMT16PCM0012_PWS.doc DOC document
CMT16PCM0012_encl10a_evalplan_rating_lpta.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title: GW Facility Prep COMSEC Spt Reinforce Floor

2. Work Requirements:

· Task 1 - Contractor will design, fabricate and install beam assembly to augment existing under floor beam to increase floor load capacity to support 45,000 pounds

· Task 2 – Contractor will provide floor reinforcement AutoCAD As-Built drawings, Framing Plan, Elevation and Sections Drawing, Structural Notes and Floor Plan, Pounds per sq. ft. rating upon completion of work.

3. Primary Method of Surveillance

· Periodic Inspection: Will be used for Task 1

· 100% Inspection: Will be used for Task 2

4. Scope of Performance:

Contractor will design, fabricate and install beam assembly to augment existing under floor beam to increase floor load capacity to support 45,000 pounds.

Contractor will provide one hard copy and one soft copy of AutoCAD As-built drawings for vault and floor reinforcement. Contractor will provide the following documentation for the project: a) vault documentation, b) Framing Plan, Elevation and Sections Drawing, c) Structural Notes and Floor Plan, d) Pounds per sq. ft. rating upon completion of work.

5. Performance Standards:

Design, fabricate and install beam assembly to augment existing under floor beam to increase floor load capacity to support 45,000 pounds – Delivery and installation must be completed on time 100% of the time. Installation must be completed according to specification.

Provide documentation and drawings - Drawings must be accurate and complete 100% of the time. All other documentation must be complete and delivered on time 100% of the time

6. Mandatory or regulatory compliance items:

The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.

7. Acceptable Quality Level (AQL):

The AQL for this project is 100% due to the necessity for the safety factors related to the installation and use of the vault.

8. Evaluation Method:

· Routine inspection of deliverable products and services.

9. Incentives (Positive and/or Negative):

N/A Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2