Atch_2_PP_Questionnaire.docx
DOCX document 24 KB Posted
- Attached to
- Enterprise Services Attack Analysis
- Solicitation number
- HC1028-13-R-0036
- Issued by
-
Defense Information Systems Agency
About this file
Attachment 2 - Past Performance Questionnaire
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC1028-13-R-0036_0011.pdf | ||
| HC1028-13-R-0036_0010.pdf | ||
| Q_ _As_30_May_13.docx | DOCX document | |
| HC1028-13-R-0036_0003.pdf | ||
| HC1028-13-R-0036_0002.pdf | ||
| HC1028-13-R-0036_0001.pdf | ||
| Q_and_As_as_of_3_May.docx | DOCX document | |
| Atch_4_DD_254.docx | DOCX document | |
| HC1028-13-R-0036.doc | DOC document | |
| Atch_1_-_Past_Performance_References.doc | DOC document | |
| Atch_3_Payment_Plan.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4
PAST PERFORMANCE QUESTIONNAIRE
(This questionnaire is intended as a sample. Tailor the questionnaire to your technical/management factor/subfactors/cost/price factor to solicit the information your Past Performance Evaluation Team will need to make their Performance Confidence Assessment. It must match your evaluation criteria. This questionnaire should be accompanied by a transmittal letter explaining its purpose.)
WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 3.104
SECTION 1: CONTRACT IDENTIFICATION
A. Contractor: ______________________________________________________________________________
B. Cage Code of contractor contract was awarded to: _________________________________
C. Contract number: _______________________________________
D. Contract type: ______________________________
E. Was this a competitive contract? Yes _____ No _____
F. Period of performance: _________________________________________________________
G. Initial contract cost: $____________________________
H. Current/final contract cost: $_______________________________
I. Reasons for differences between initial contract cost and final contract costs: _________________________
J. Description of service provided:______________________________________________________________
SECTION 2. CUSTOMER OR AGENCY IDENTIFICATION
A. Customer or agency name: _________________________________________________________________
B. Customer or agency description (if applicable): _______________________________________________________________
C. Geographic description of services under this contract, i.e., local, nationwide, worldwide, other Commands:
SECTION 3. EVALUATOR IDENTIFICATION
A. Evaluator's name: _________________________________________________________________________________ B. Evaluator's title: ___________________________________________________________________________ C. Evaluator's phone/fax number: ___________________________________________________________________ D. Number of years evaluator worked on subject contract: _____________________
SECTION 4: EVALUATION
Please indicate your satisfaction with the contractor’s performance during the contract period by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:
PERFORMANCE LEVEL
EXCEPTIONAL (E) (Blue) - During the contract period, contractor performance meets or met contractual requirements and exceeds or exceeded many to the Government's benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD (VG) (Purple) - During the contract period, contractor performance meets or met contractual requirements and exceeds or exceeded some to the Government's benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective
SATISFACTORY(S) (Green) –During the contract period, contractor performance meets or met contractual requirements. The contractual performance of the element or sub-element being assessed contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
MARGINAL (M) (Yellow) – During the contract period, contractor performance does not or did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
UNSATISFACTORY (U) (Red) – During the contract period, contractor performance does not or did not meet most contractual requirements and recovery in a timely manner is not likely. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
NOT APPLICABLE (NA) (White) - Unable to provide a rating. Contract did not include performance for this aspect. Do not know.
E
VG
S
M
U
NA
Technical Performance T1 Quality & repeatability of operations & maintenance.
T2. Quality of technical system testing and certification efforts
T3 Quality/integrity of technical data/report preparation efforts
T4 Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements
T5 Ability to implement current standard practices for computer hardware design, operation, maintenance, upgrades and configuration control
T6 Ability to implement current standard practices for computer software design, operation, maintenance, upgrades and configuration control
T7 Ability to provide system engineering in support of collection, storage and analysis of information assurance data.
T8 Ability to provide use cases for likely threat scenarios and produce signatures for detecting those attack scenarios
T9 Ability to provide analysis on audit log data in order to determine the type and verboseness of data required for detecting and diagnosing attacks and misconfigurations
T10 Ability to design, develope, prototype, test, and support for a high assurance information sharing system.
T11 Ability to provide support for the adoption of rapid development tools created throughout the contract by the contractor
T12 develop and provide training material in support of rapid development tools
T13 Adequacy/effectiveness of environmental safety procedures
Program Management P1. Effectiveness of overall contract management (including ability to effectively lead, manage and control the program)
P2. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes)
P3. Timeliness/effectiveness of contract problem resolution without extensive customer guidance
P4. Understand/complied with customer objectives and technical requirements
P5. Successfully responded to emergency and/or surge situations
P6. Quality/effectiveness of sub-contracted efforts
P7. Effectiveness of material management (including Government Furnished Property or Material)
P8. Effectiveness of acquisition management
P9. Contractor proposed alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the customer
P10. Contractor implemented responsive/flexible processes to improve quality and timeliness of support.
E
VG
S
M
U
NA
Transition/phase-in T/PI1. Contractor ability to smoothly transition resources and personnel.
T/PI2. Contractor effectiveness on maintaining continuity of mission support while transitioning/phasing in resources and personnel to support other efforts.
Employee Retention/Attraction E1. Ability to hire/apply a qualified workforce to this effort.
E2. Ability to retain a qualified workforce on this effort.
E3. Effectiveness of employee compensation towards quality of work.
Small and Small Disadvantaged Business Participation S1. Ability to meet or exceed small business and small disadvantaged business goals set forth in the approved subcontracting plan
S2. Ability to effectively manage small business participation to meet technical performance.
Cost Performance C1 Accuracy in forecasting contract costs
C2 Ability to meet forecasted costs and perform within contract costs
C3 Ability to alert Government of unforeseen costs before they occur
C4 Sufficiency and timeliness of cost reporting
2. Please discuss each and every response for which you indicated E (Exceptional), VG (Very Good), M (Marginal) or U (Unsatisfactory) in response to the questions above (use additional sheets, if necessary).
3. Government Contracts Only: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?
| Yes___ | Default___ | Convenience___ | Pending Terminations___ |
| No ___ |
If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc).
SECTION 5: NARRATIVE SUMMARY
What were the contractor’s most positive aspects in the performance of the contract?
What were the contractor’s most negative aspect in the performance of the contract? ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?
Please provide any additional comments concerning this contractor’s performance, as desired.
Evaluator’s Signature Date
Thank you for your prompt response and assistance!
Please return this completed questionnaire to:
Mailing/Emailing Address: (indicate how questionnaires are to be returned)
Or FAX to:
File details come from the government source that posted it. Updated .