*** THE PURPOSE OF HC101318QA942-0005 IS AS FOLLOWS: *** 1. EXTEND THE QUOTE DUE DATE TO 05 JULY 19 TO ALLOW FOR ENHANCED COMPETITION AND QUOTE SUBMISSION. 2. ADJUST THE SERVICE DATE TO 04 OCTOBER 19. 3. UPDATE DIVERSITY REQUIREMENTS - RELAX DIVERSITY DISTANCE FROM 50 METERS TO 20 METERS OF SEPARATION. *** ALL ELSE REMAINS THE SAME ***

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 6/4/2019

SUBJECT: HC101318QA942-0005 Amend: 0005

A. TYPE ACTION: ADMIN AMEND

1. PURPOSE: *** THE PURPOSE OF HC101318QA942-0005 IS AS FOLLOWS: ***

1. EXTEND THE QUOTE DUE DATE TO 05 JULY 19 TO ALLOW FOR ENHANCED COMPETITION

AND QUOTE SUBMISSION.

2. ADJUST THE SERVICE DATE TO 04 OCTOBER 19.

3. UPDATE DIVERSITY REQUIREMENTS - RELAX DIVERSITY DISTANCE FROM 50 METERS TO

20 METERS OF SEPARATION.

****ALL ELSE REMAINS THE SAME ****

PROVIDE, INSTALL AND MAINTAIN A 10GBE (GIGABIT ETHERNET) IP BACKBONE CIRCUIT

BETWEEN BLDG 102; ROOM: FRAME; 1ST FL; 264 STEEN BLVD, GRAND FORKS AFB, ND,

58205 AND BLDG 501; ROOM: U-127; 901 SAC BLVD, OFFUTT AFB, NE, 68113.

2. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB CIRCUIT AND

SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS PER 350 MILES MEASURED AS THE

GREAT CIRCLE DISTANCE BETWEEN THE "A" AND "Z" LOCATIONS.

3. ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION

UNIT (MTU) OF 9100 OCTETS (BYTES) WITH JUMBO FRAMES.

4. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL

TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING

WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL

REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.

FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE

QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND

AWARD.

5. THE SERVICE DATE TO BE MET IS: 04 OCTOBER 19 (SIP). THE GOVERNMENT ASSUMES

THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE

DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION

IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR

COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.

6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION

HC101318QA941/TSR RU21FEB185787.AND MUST BE ENGINEERED AND PROVISIONED

HC101318QA942-0005

TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS

(SDP) FROM SOLICITATION HC101318QA941/TSR RU21FEB185787; MEANING THE PHYSICAL

PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE

LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 20 METERS

PHYSICAL SEPARATION FROM SOLICITATION HC101318QA941/TSR RU21FEB185787.

7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE

ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/

OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS

ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES

AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD

PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE

INCLUDED THE ATTACHMENTS.

8. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES SHALL

INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY

REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER, THEY MUST

PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR INTENDS

TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR

CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED.

RESPONSES TO CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST

CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS

SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING

THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE

POSTED TO FEDBIZOPPS.

9. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL

POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM,

CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF

THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.

10. ESTABLISH TSP: TSP0HA5GH-01

M. ADDITIONAL INFORMATION:

3. TSR NUMBER: RU21FEB185790

4. CCSD: XXXXBB9K

Z. DITCO CONTACT:

Andrew Fernandez

618-229-9194 andrew.r.fernandez.civ@mail.mil

Dale L. Rupright

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph E.SERVICE DATE change from:

Aug 26, 2019

To:

Oct 4, 2019

Paragraph M.3.TSR NUMBER change from:

RU21FEB185790A

RU21FEB185790

Paragraph V.QUOTE DUE DATE AND TIME change from:

Apr 26, 2019 3:00:00 PM CDT

Jul 5, 2019 3:00:00 PM CDT