About this file

ATTACHMENT 1 FOR SOLICITATION HC101318QA942

View the file

Other files for this federal contract opportunity

Other files attached to AWARD NOTICE FOR A 10GBE (GIGABIT ETHERNET) IP BACKBONE CIRCUIT BETWEEN BLDG 102; ROOM: FRAME; 1ST FL; 264 STEEN BLVD, GRAND FORKS AFB, ND, 58205 AND BLDG 501; ROOM: U-127; 901 SAC BLVD, OFFUTT AFB, NE, 68113., newest first.
File Type Posted
HC101318QA942-0006.pdf PDF
HC101318QA942-0005.pdf PDF
Amendment_HC101318QA942-0004.v0.pdf PDF
AMENDMENT_HC101318QA942-0003.pdf PDF
AMENDMENT_FOR_SOLICITATION_HC101318QA941-0002.pdf PDF
Amendment_HC101318QA942-0002.v0.pdf PDF
Amendment_HC101318QA942-0002.v0.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 FOR SOLICITATION HC101318QA942

CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL

HANDOFF-10GB ETHERNET-LAN-PHY-SINGLE MODE FIBER), 802.3AE,

1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY.

NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX

WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30

DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB.

(C) 10GB ETHERNET - LAN-PHY INTERFACE REQUIRED AT COMMERCIAL

DEMARC AT THE "A" AND "Z "LOCATIONS.

(D) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM

M. REMARKS CONTINUED: TRANSMISSION UNIT (MTU) OF 9100 OCTETS (BYTES)

JUMBO FRAMES.

(E) NO NETWORK INTERFACE UNIT, DEDICATED PATH.

(F) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE

ENGINEERED INTO CIRCUIT.

(G) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS

IAW ITU-T.Y.1564 (02/2016) ETHERNET SERVICE ACTIVATION

- SIMPLE CIR VALIDATION TEST WITH EMIX PATTERN ADDFH. NOTE:

ETHERNET FRAME SIZE DESIGNATOR 'H' (PHYSICAL MTU) IS EQUAL TO

9100 BYTES.

(H) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24

HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%

AVAILABILITY OR BETTER.

(I) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF

TROUBLE.

(J) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY

CIRCUIT OUTAGES.

(K) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(L) TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND

ADMINISTRATION MONITORING OF ETHERNET CIRCUIT IAW

ITU-T-Y.1731. (M) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON

BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING

AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-220-8627 (D)

770-8627.

(N) VENDOR MUST PROVIDE:

1. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND

MAINTENANCE OF 10GBE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.

2. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION

FACTORS.

3. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN

ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER

LOCATIONS.

4. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE

TO THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C) 618-220-9950,

(D)770-9950 TOLL FREE: 855-868-9950

5. DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO

350-135-1 BY RNSOC, SCOTT AFB, IL. GUIDANCE ON

SUBMISSION IS AVAILABLE AT

<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP> CLICK ON

"DISA-DITCO CIRCULAR, 350-135-1, DEFENSE COMMERCIAL

N. REMARKS CONTINUED: COMMUNICATIONS ACQUISITION PROCEDURES."

M. MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM

LINE CODE: OPTIC

ETHERNET FRAME: 9100 OCTETS (BYTES) PHYSICAL MTU

1. TEST AND ACCEPTANCE: 10GB ETHERNET (LAN PHY) CIRCUITS SHALL

PASS A FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY DISA

GOC AT SCOTT AFB, IL. PRIMARY: . (C) 618-220-8627 (D) 770-8627.

2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING

PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE

TESTING. ERROR PERFORMANCE SHALL BE MEASURED AND RECORDED OVER

THE DURATION OF A CONTIGUOUS 24 HOUR TESTING INTERVAL AND SHALL

BE MEASURED AND RECORDED PER DEFINITION IN ITU-T-Y.1564.

3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE

FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:

AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS

SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT

HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS.

4. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE

GREATER THAN 24 HOURS.

5. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB

CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10

MILLISECONDS PER 350 MILES MEASURED AS THE GREAT CIRCLE DISTANCE

BETWEEN THE "A" AND "Z" LOCATIONS.

6. ROUND TRIP DELAY VARIANCE (JITTER) SHALL BE NO MORE THAN 3MS.