Harness_Release_Ctg_QALI.pdf

PDF 889 KB Posted

Attached to
FA821321R3008 Cartridge Devices Federal contract opportunity
Solicitation number
FA821321R3008
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This solicitation is for harness release cartridge devices to support the F-16 and F-15 weapon systems. It requires qualified vendors to submit proposals for three contract line item numbers totaling 1,659 units. The competing national stock numbers, part numbers, and cage codes are identified for each CLIN. Acceptable vendors are Universal Propulsion Company and Chemring Energetic Devices. The solicitation includes the official request for proposals document and supplemental attachments. The Department of the Air Force Materiel Command Lifecycle Management Center is the contracting agency. Final offers are due by the specified closing date. Qualified incumbents will manufacture the cartridge devices along with the required first article, first article test, and first article test report documentation.

View the file

Other files for this federal contract opportunity

Other files attached to FA821321R3008 Cartridge Devices, newest first.
File Type Posted
F010528206.pdf PDF
Drogue_Gun_Cart_QALI.pdf PDF
CDRLS.pdf PDF
1377-01-052-8208ES_EDL.pdf PDF
21-50072_50073_AIR_SPEC.pdf PDF
HRC_IHC_Log_No_20-110.pdf PDF
CADPAD_Item_Marking_Instruction.pdf PDF
807_Combined.pdf PDF
Collins_DGC.pdf PDF
Gyro_QALI.pdf PDF
2801ES_FA_FORM_260.pdf PDF
1377-01-053-0537ES_EDL.pdf PDF
TransInstruction4.pdf PDF
REPSHIP_11_Mar_14.pdf PDF
Collins_Gyro.pdf PDF
FA821321R3008.pdf PDF
F013193847.pdf PDF
Collins_HRC.pdf PDF
ADC_SOW.pdf PDF
0537ES_FA_FORM_260.pdf PDF
1377-01-652-2801ES_EDL.pdf PDF
1377-01-319-3847ES_EDL.pdf PDF
SOW_SPI.pdf PDF
SEP_19_IHC_2801ES.pdf PDF
IHC_Gyro_CED.pdf PDF
F010528208.pdf PDF
3847ES_FA_FORM_260.pdf PDF
8206ES_EDL.pdf PDF
5552ES_EDL.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 4JUN2020
2020-06-04T17:27:23-0600
JOHNSON.AVERY.STEVEN.1457505112
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 1002-41, 6284200
DODIC: MD87
Text20: 17610, 93455
Text19: UTAS, CED
Part Number Line 2:
Contract No: 21-50072, 21-50073
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: ACESII Harness Release Ctg

File details come from the government source that posted it. Updated .