About this file

This document contains a quality assurance letter of instruction and federal contract opportunity solicitation. The quality assurance letter outlines inspection requirements for contractor CED's production of ACESII drogue gun cartridges under contract numbers 21-50072 and 21-50073. Inspections include witnessing leak testing, x-ray inspection, lot acceptance testing, preparation for shipment, and ensuring correct ammunition data cards and packaging, packing, preservation, and marking. The related solicitation seeks offers for cartridge devices used on F-16 and F-15 weapon systems. It involves three line items for harness release cartridges with quantities specified. The solicitation is restricted to two incumbent contractors, UPCO and CED. The solicitation includes attachments with additional details. The deadline to submit offers in response to this solicitation is not specified.

View the file

Other files for this federal contract opportunity

Other files attached to FA821321R3008 Cartridge Devices, newest first.
File Type Posted
CADPAD_Item_Marking_Instruction.pdf PDF
807_Combined.pdf PDF
Collins_DGC.pdf PDF
Gyro_QALI.pdf PDF
2801ES_FA_FORM_260.pdf PDF
1377-01-053-0537ES_EDL.pdf PDF
TransInstruction4.pdf PDF
REPSHIP_11_Mar_14.pdf PDF
Collins_Gyro.pdf PDF
Harness_Release_Ctg_QALI.pdf PDF
3847ES_FA_FORM_260.pdf PDF
8206ES_EDL.pdf PDF
5552ES_EDL.pdf PDF
F010528206.pdf PDF
CDRLS.pdf PDF
1377-01-052-8208ES_EDL.pdf PDF
21-50072_50073_AIR_SPEC.pdf PDF
HRC_IHC_Log_No_20-110.pdf PDF
FA821321R3008.pdf PDF
F013193847.pdf PDF
Collins_HRC.pdf PDF
ADC_SOW.pdf PDF
0537ES_FA_FORM_260.pdf PDF
1377-01-652-2801ES_EDL.pdf PDF
1377-01-319-3847ES_EDL.pdf PDF
SOW_SPI.pdf PDF
SEP_19_IHC_2801ES.pdf PDF
IHC_Gyro_CED.pdf PDF
F010528208.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 4JUN2020
2020-06-04T17:29:38-0600
JOHNSON.AVERY.STEVEN.1457505112
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 1003-24, 6284100
DODIC: MD89
Text20: 17610, 93455
Text19: UTAS, CED
Part Number Line 2:
Contract No: 21-50072, 21-50073
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: ACESII Drogue Gun Ctg