shower trailers Det Stennis.docx

DOCX document 14 KB Posted

Attached to
8 unit Shower Trailer
Solicitation number
H92242-12-T-6002
Issued by

About this file

Statement of Work for 8 unit Shower Trailer

View the file

Other files

File Type Posted
Exterior Dimensions.pdf PDF
Basic Shower Spec.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

1.0. Project Overview:

Purchase, delivery and installation of a replacement Mobile Shower facility for NSWG4/STT.

1.1 Deliver and perform initial setup of one 32 foot, self contained, mobile shower unit of in-kind type and configuration as the existing unit.

Detailed Description of the task requirements

2.1 Task Description:

2.1.1 NSWG4, Detachment Stennis has a requirement to replace one 32 foot, JAG mobile shower that has already been connected to water, sewer and electrical service at building 2108. ,.

2.1.2 The existing unit is 32 feet long, eight feet wide, with tandem axles, slide out stair assemblies, and is fitted with four 40 gallon LP gas cylinders.

2.1.3 Interior of the existing unit is subdivided in two equal sized areas; one for male, one for female; includes four showers and two sinks in each area.

2.1.4 Appliances include roof top vents, ceiling/rooftop heating and air conditioning, smoke alarm devices, all plumbing, lighting and miscellaneous hardware to operate one side independently of the other.

2.2 Place of Performance:

Delivery and setup shall be performed for Navbal Special Warfare Group Four/Detachment Stennis, located at 2108 H Road, Bldg 2108, Stennis Space Center, MS.39529.

2.3 Contractor Furnished Material:

Contractor shall provide all required equipment and labor to deliver and perform initial setup of the replacement unit.

Contractor shall provide all required tools, materials and shall follow all directives of the NASA (host) and Navy (customer activity) safety, security and personnel access requirements.

2.4 Government Furnished Equipment (GFB) Material

The government will provide a prescribed laydown area for the unit and all compatible final connections to the replacement unit that are necessary to energize utilities.

3.0 Hazardous Material Use, Handling, or Disposal:

The Contractor shall comply with all Federal, State, and local (where the work is performed) laws regarding the transportation, use, handling, or disposal of hazardous materials {petroleum/' products, paints, coatings, etc.) required under this order.

3.1 Classified/unclassified Data:

NP/A

4.0 Period of Performance:

Performance shall begin at contract award and shall be completed by l June 2012.