Amended Attachment 5 - Technical Capability Matrix.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
West Coast FAA COI
Solicitation number
H9224022T0018
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RequirementPWS ParagraphQuoter Currently MeetsQuoter Currently Does Not Meet
COI that incorporates all training requirements in PWS and administers the FAA Private Pilot/Airplane (PAR) Knowledge Test for all students2.1
Current 14 CFR Part 141 Certificate3.1
Ten (10) day FAA Part 141 classroom-based COIs for up to 8 personnel per COI that encompasses all the requirements to prepare students to take and pass the FAA Private Pilot-Airplane (PAR) Knowledge Test4.1
After the test the contractor shall provide all students with an official FAA Airman Knowledge Test Report reflecting their scores4.1
Applicable Federal Aviation Regulations pertaining to Private Pilot privileges, limitations, and flight operations; accident reporting requirements of the National Transportation Safety Board (NTSB).4.2.1.1
Use of Federal Aviation Administration / Aeronautical Information Manual (FAR/AIM) and FAA advisory circulars4.2.1.2
Use of aeronautical charts for Visual Flight Rules (VFR) navigation using pilotage, dead reckoning, and electronic navigation systems.4.2.1.3
Radio communications procedures, recognition of critical weather phenomena, from the ground and in flight, wind shear avoidance, and the procurement and use of aeronautical weather reports and forecasts.4.2.1.4
Safe and efficient operation of aircraft, including collision avoidance, and recognition and avoidance of wake turbulence.4.2.1.5
Effects of density altitude on aircraft performance.4.2.1.6
Weight and balance computations.4.2.1.7
Principles of aerodynamics, power plants, and aircraft systems.4.2.1.8
Stall awareness, spin entry, spins, and spin recovery techniques.4.2.1.9
Aeronautical decision making and judgment.4.2.1.10
Meet Preflight requirements 4.2.1.11.1 through 4.2.1.11.44.2.1.11
How to plan for alternatives if the planned flight cannot be completed or delays are encountered.4.2.1.12
Contractor shall provide a Course Schedule/Training Plan NLT 3 days after Task Order award.4.2.3.1
All academic materials required for each classroom instruction.4.2.3.2
Facility with internet access, air conditioning, and a student lounge4.2.4.1
Contractor's facility located within 300 mile radius of Naval Base Coronado14.1.2
Meets/Does Not Meet to be completed by the Quoter.

Attachment 5 - Technical Capability Matrix

File details come from the government source that posted it. Updated .