Attachment 1 - Product Description_Catwalk.pdf
PDF 97 KB Posted
- Attached to
- Customized Heavy Duty Mobile Catwalks Federal contract opportunity
- Solicitation number
- H92240-21-T-0010
- Issued by
- United States Special Operations Command
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| H92240-20-T-0010_Amend 03.pdf | ||
| H92210-21-T-0010_QnA 2.pdf | ||
| Attachment 1 - Product Description_Catwalk_Amend 02.pdf | ||
| H92240-21-T-0010_Amend 02.pdf | ||
| Questions and Answers 1_Catwalk.pdf | ||
| H92240-21-T-0010_Amend 01.pdf | ||
| Pricing Sheet_Catwalks.xlsx | XLSX spreadsheet | |
| Attachment 1 - Product Description_Catwalk_Amend 01.pdf | ||
| Attachment 2 - CCA Main Catwalk Design Concept.pdf | ||
| H92240-21-T-0010_Catwalks.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Product Description Special Boat Team TWENTY
Customized Heavy Duty Catwalks for CCAs
1. BACKGROUND
1.1 Naval Special Warfare (NSW), Special Boat Team 20 (SBT-20) requires customized hot-dip galvanized heavy duty catwalks for SBT-20 Combat Craft Assault boats (CCA’s) to support CCA maintenance, unit level training, and mission support.
Specifically, the catwalks will provide the ability to conduct maintenance in a safe manner as well as onload and offload equipment without the use of a forklift.
2. OBJECTIVES
2.1 The Government intends to award a firm-fixed price contract for the procurement of custom-manufactured hot-dip galvanized heavy duty mobile catwalks in direct support of SBT-20 CCAs.
3. REQUIREMENTS
3.1 The Contractor shall provide custom-built hot-dip galvanized duty mobile catwalks.
3.2 Each catwalk shall be between 10-foot & 11-foot in total height (7-foot deck height), between 30-foot and 35-foot in length, and 38-inches in width.
3.3 Each catwalk shall have handrails, chain poles, 3-inch steel casters.
3.4 Each catwalk shall be made of stainless-steel hardware and
3.5 Each catwalk shall have a walkable stairway with a 1,000-pound load capacity.
3.6 Each catwalk shall be compliance with all OSHA safety protocols.
3.7 Each catwalk shall be assembled by the Contractor at the delivery address specified in
Section 4 below.
3.8 See Attachment 2 – CCA Main Catwalk Design Concept
4. DELIVERY INFORMATION
4.1 Delivery: NLT 120 Days after award
4.2 Point of Contact:
CWO4 Jeremy Marks
(757) 763-4955
4.2 Delivery address:
Attention: CWO4 Jeremy Marks 2220 Schofield Rd, Bldg 119 STE 200, Virginia Beach, VA, 23459
5. QUALITY ASSURANCE
5.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms to include proper delivery of quantity and type of goods. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
6. PERIOD OF PERFORMANCE
6.1 Base award will include one catwalk.
6.2 The contract will include a 24-month option period for an additional 4 catwalks. These options can be exercised in quantities at the Governments discretion.
File details come from the government source that posted it. Updated .