Attachment_01_-_Performance_Work_Statement.doc
DOC document 88 KB Posted
- Attached to
- Vessel Repair
- Solicitation number
- H9224020T0002
- Issued by
-
United States Special Operations Command
About this file
Attachment 01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_01_-_Performance_Work_Statement.doc | DOC document | |
| H92240-20-T-0002-0002.pdf | ||
| H92240-20-T-0002-0001.pdf | ||
| Attachment_02_-_SCA_Wage_Determination.pdf | ||
| H92240-20-T-0002.pdf | ||
| Attachment_03_-_Quote_Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Naval Special Warfare Command Group FOUR “M/V Tiburon” 60NS8701 Overhaul Performance Work Statement
1.0 BACKGROUND: Naval Special Warfare Group Four (NSWG4) has received a 60’ trawler, M/V TIBURON. This vessel requires a basic refurbishment prior to use as a training platform. This PWS supports this refurbishment.
2.0 OBJECTIVES: NSWG4 intends to award a firm fixed price contract to accomplish repairs of 60NS8701 TIBURON. These repairs include, but are not limited to: surface preparation, painting, various electrical repairs, various structural and fiberglass repairs, various mechanical repairs and various hardware replacements as defined in this PWS.
3.0 SCOPE: The contractor shall provide personnel, management, materials, equipment, and facilities necessary to execute the requirements in this PWS. All repairs and work performed shall comply with American Boat and Yacht Council (ABYC) standards. All replaced or installed fasteners and hose clamps shall be 316 stainless steel.
4.0 TASKS: The contractor shall conduct the following repairs, modifications, and refurbishments, as well as dispose of all removed materials and equipment unless otherwise specified by the government.
4.1 Engine Room
a) Provide materials and services to prep and paint the engine room deck, bulkhead and overhead. Bulkhead and overhead paint shall be gloss white. Deck paint shall be gloss gray with non-skid additive in areas subject to foot traffic. Overhead shall be painted following installation of lagging. All paint shall meet requirements for intended marine purpose, and capable of withstanding the engine room environment.
b) Provide materials and services to remove and replace overhead lagging. Lagging and lagging adhesive shall meet requirements for intended marine purpose, and be capable of withstanding the engine room environment. Removable engine access panels shall be lagged with silver lagging capable of withstanding elevated temperatures found above the engines. These silver engine access panels shall not be lagged. Lagging shall be installed in such a manner that engine access panels may be removed and reinstalled without damage to lagging.
4.1.2 Engines:
a) Provide materials and services to remove and replace seawater inlet strainers for port and stbd engines.
b) Provide all new valves, piping, hoses, hose clamps (All seawater and fuel system connections shall be secured with double hose clamps).
c) Provide and install electronic local gauges for main engines that indicate engine RPM, oil pressure, jacket water temperature, and marine gear oil temperature. Note that these gauges will be mirrored in the pilot house and fly bridge.
4.1.3 Fuel System:
a) Provide materials and services to remove and replace Fuel RACOR filter assemblies in their entirety.
b) Provide materials and services to remove, procure new and install fuel hoses and fittings from the fuel tank to the engines. If hose clamp connections are used, double clamps are required.
c) Conduct a complete and thorough polish of fuel tanks.
d) Provide services and materials to identify and label all fuel suction and return valves.
e) Provide materials and services to label all fuel piping with direction of flow.
4.1.4 Bilge Pump:
a) Provide Materials and services to remove and replace engine room bilge pump, float switch, discharge hose, hose claps, thru hull fitting and overboard discharge valve. Pump shall be equal or higher capacity and quality.
b) Procure and install new bilge pump waterproof junction box and terminal board.
4.1.5 Engine Room Hatch:
a) Provide material and service to repair cracks in fiberglass on bottom side of engine hatch at strongback.
b) Provide materials and service to repair and reinforce fiberglass engine room hatch frame at forward stbd side. (Frame has excessive flex when opening hatch.)
4.1.6 Engine Battery Bank:
a) Provide material and service to replace port and stbd engine start batteries with new batteries. Batteries shall be equal or higher capacity and quality and shall be adequately secured with clamps, brackets, or by other means.
b) Provide materials and service to remove, procure new and install new battery cables and connectors.
4.1.7 House Battery Bank:
a) Provide material and service to replace three house batteries with new batteries. Batteries shall be equal or higher capacity and quality and shall be adequately secured with clamps, brackets, or by other means.
b) Provide materials and service to remove, procure new and install battery cables and connectors.
4.1.8 Installed Firefighting System:
a) Provide material and service to perform inspection and certification of installed firefighting system.
4.2 Generator Room
4.2.1 Generator Seawater inlet system:
a) Provide materials and services to remove and replace with new the generator (port and stbd) seawater suction / hull valves, strainers and hoses.
b) Provide materials and services to remove and replace with new the bilge pump overboard valve, fitting, and hose.
4.2.2 Hynautic Steering System:
a) Provide materials and services to remove the Hynautic steering system in its entirety and replace with new to include but not limited to; steering cylinders, piping, hoses, and rudder angle indicator. All mounting hardware shall be 316 SS.
b) Provide materials and services to install an electric backup pump for the Hynautic steering system.
4.2.3 Generator Battery Bank:
a) Provide material and service to replace generator start batteries with new batteries. Batteries shall be equal or higher quality and capacity and shall be adequately secured with clamps, brackets, or by other means.
b) Provide materials and service to remove, procure new and install new battery cables and connectors.
4.2.4 Overhead Vent:
a) Provide material and service to install vent screen over 3 foot hole in overhead centerline aft end of space.
4.2.5 Paint.
a) Provide materials and services to prep and paint the generator room deck, bulkhead and overhead. Bulkhead and overhead paint shall be gloss white. Deck paint shall be gloss gray with non-skid additive in areas subject to foot traffic. All paint shall meet requirements for intended marine purpose, and capable of withstanding the engine room environment.
4.3 Aft Working Deck:
a) Provide materials and services to remove false flooring, seal exposed fiberglass and install new flooring.
b) Remove false flooring and provide materials and services to crop out and replace approximately 14 sq ft of soft decking port side aft forward of dive door and other aft working deck locations.
c) Remove all handrails and reinstall with new 316 SS hardware after painting.
d) Remove generator access hatch and frame. Replace all gaskets/sealant and reinstall with new 316SS hardware.
e) Provide materials and services to prep and paint ladder to bridge wing and replace non-skid on ladder treads.
f) Manufacture and install new dive deck to transom using 316 SS hardware and marine materials, using the old dive deck as a sample.
4.4 Bridge Wings and Aft Deck:
a) Provide materials and services to remove port and stbd bridge wing handrails and reinstall with new 316SS hardware after painting.
b) Provide materials and services to remove and replace with new all marine grade plywood from the bridge wing decks.
c) After removal of plywood, provide material and services to inspect bridge wing deck surface and provide a report of repairs needs. For bidding purposes provide labor and materials for 25 sq ft of fiberglass repairs.
d) Provide materials and services to repair/replace damaged fiberglass and wood for the aft deck overhang.
e) Provide materials and services to remove existing shore power cable and install 50 amp shore power outlet with breaker and weather tight box. Procure and provide two 50 amp shore power cables, one 20 ft and one 50 ft.
4.5 Galley and Main Cabin:
a) Provide materials and services to remove galley/main cabin overhead paneling.
b) After removal of overhead paneling, provide material and services to inspect overhead identifying areas in need of repair. For bidding purposes provide labor and materials for 10 sq. ft. of repairs.
c) Provide materials and services to remove, inspect, reinstall, and seal all galley, main cabin, head and stateroom windows using new seals, gaskets and stainless steel mounting hardware.
d) Perform a water hose test on the all window seals. No leakage allowed.
e) Reupholster cabin table benches and cushions with heavy duty brown, leather like, naugahyde.
4.6 Aux Machinery Space:
a) Provide materials and services to remove and replace with new, the Aux Space Breaker Panel and breakers. Ensure all breakers are properly sized and labeled. Label, relug, and reuse existing wiring.
b) Provide materials and services to remove and replace with new the forward Cruzair HVAC system.
c) Provide materials and services to prep and paint the aux space deck, bulkhead and overhead. All paint shall meet requirements for intended marine purpose, and be capable of withstanding the aux machinery space environment. Bulkheads and overhead shall be painted gloss white. Deck shall be painted gloss gray with non-skid additive in areas subject to foot traffic.
d) Provide materials and services to remove and replace with new the overboard valves / fittings for the port and stbd bilge pumps, grey water overboard, AC unit S/W inlet and S/W overboard.
e) Provide materials and services to install a seawater desalination reverse osmosis unit, including all required hoses, pumps, and valves. Unit must have the capacity to produce a least 100 gallons of drinking water per day.
4.7 Pilot House:
a) Provide materials and services to remove, inspect, and reinstall all pilot house and chart room windows using new seals, gaskets and stainless steel mounting hardware.
b) Perform a water hose test on the all window seals. No leakage allowed.
c) Provide materials and services to remove existing Raymarine Radar and navigation equipment and replace with new Simrad Marine Electronics NSO evo3 system. This system shall include all ancillary equipment to provide live stream video in main and auxiliary spaces (generator room, engine room, aux machinery room) and weather decks (one bow, one fly bridge looking down); radar; autopilot / rudder indicator; depth sounder; GPS navigation; and ability to load electronic navigation charts. Furthermore, fly bridge console components shall include the ability to navigate, set a course via the autopilot, and observe rudder position via rudder indicator.
d) Provide materials and services to remove existing and procure and install new electronic engine and generator monitoring systems. Engine system shall display for both engines, RPM, oil pressure, jacket water temperature, and marine gear oil temperature. Generator monitoring system shall display for both generators, jacket water temperature, oil pressure, and indication regarding engine run condition (operating or secured). This system will replace existing engine and generator gauges.
e) Procure and install an electric window wiper system for the three forward pilot house windows sufficient to clear the majority of the window surface area.
f) Provide and install a forced air defogging system for the three forward pilot house windows.
4.8 Fly Bridge:
a) Provide materials and services to remove topside Mitsubishi HVAC unit external sheet metal housings, remove rust, prepare, prime and preserve using corrosion preventive paint. Reinstall housings with 316SS hardware.
b) Provide materials and services to replace all lagging materials on topside Mitsubishi HVAC unit refrigerant piping.
c) Manufacture and install new Bimini top using blue heavy-duty marine canvas.
d) Manufacture and install new fly bridge console cover.
e) Install engine and generator monitoring systems that mirror information displayed at pilot house.
4.9 Paint and Hull:
a) Repair hull damage, two locations, on forward starboard bow area, reinstall starboard port-window blanking patch and glass over. Repair up to four square feet of other hull fiberglass issues.
b) Replace missing rub rail, starboard and port.
c) Repair port mid-ships ventilator.
d) Perform surface preparation of all exterior topside surfaces to be painted in accordance with paint manufacturer’s instructions. Surface preparation includes sanding and minor surface repairs to areas being painted.
e) Decks and cabin exterior: apply primer and a two part polyurethane enamel paint system, in accordance with paint manufacturer's instructions. Topside to be gloss white, deck to be gloss gray with non-skid additive in areas subject to foot traffic. Paint finish to be free of runs, sags, drips, orange peel, and overspray
f) Underwater hull: Prep existing surfaces in accordance with paint manufacturer’s instructions, and apply Pettit Vivid anti-fouling paint, color blue, including surface prep and barrier coat in accordance with paint manufacturer’s instructions. Apply two coats of anti-fouling, not including barrier coat. Paint finish to be free of runs, sags, drips, orange peel and overspray. This item includes the repair of up to two square feet of hull blisters.
4.10 External Natural Finished Wood and grating:
a) Rebuild grating on Fly bridge helm.
b) Prepare and refinish fly bridge grating, internal and external surfaces of galley door and pilot house door using marine grade polyurethane.
4.11 Propeller, Shafting and Running Gear:
a) Provide materials and services to clean running gear, and renew shaft packing seal.
b) Provide material and service to verify runout of propeller shafting, and report to TPOC.
c) Provide materials and services to replace all zincs
d) Provide materials and services to renew main shaft packing seal with new packing and subsequent adjustment.
e) Provide materials and service to remove, inspect, recondition, polish and reinstall shaft propellers.
f) Provide materials and service to remove, inspect, recondition, polish and reinstall spare set of shaft propellers.
4.12 Waterborne trials:
a) Schedule a PWS completion walk thru with TPOC prior to accomplishing Customer Trials. Boat will have all work and discrepancy list complete, all electrical/electronic, and steering, propulsion equipment and safety systems tested satisfactory prior to waterborne Customer Trials.
b) Contactor will conduct customer acceptance trials to verify all work has been accomplished successfully and all systems/components are operating properly. Contractor to provide materials and services to correct any contractor responsible items required in this PWS. TPOC shall be notified 24 hours prior to contractor trials in order to attend trials. Contractor may coordinate with TPOC to conduct independent trials prior to customer trials.
4.13 Misc:
a) Contractor is responsible for hauling in / out, storage, and all movements during the period of performance while accomplishing the work detailed in this PWS.
b) Boat is to be cleaned by contractor, top to bottom, including all spaces and bilges, prior to final acceptance. Clean and degrease the bilge after completion of all work. Thoroughly wash-down the boat and bilge with soap and fresh water, rinse the seawater from all components after each water trial, has been performed. No water is to be left in the bilges. Cleaning is to be accomplished after all independent trials and prior to final acceptance.
c) If fuel is required in the fuel tanks to support fuel tank polishing, it will be provided by the contractor. On final delivery the fuel tanks will contain at least 200 gallons of clean usable fuel.
d) Remove, recertify, and reinstall life raft.
5.0 DELIVERY AND FOB DESTINATION:
5.1 The government will deliver the TIBURON to the boat yard for commencement of work, and pick up the TIBURON on completion of work.
6.0 SPECIAL REQUIREMENTS:
6.1 Contractor shall provide point of contact information for all employees or constituents who will be required access to NAB Little Creek Va. and update contact information if/when any change occurs.
6.2 The contractor shall be responsible for all square foot, lineal foot measurements for the accurate measuring of the projects and the ordering of all materials for the completion of this project. All measurements shall be verified by the contractor during post award conference and prior to placing orders.
7.0 SAFETY:
7.1 Contractor shall abide by all applicable federal and state OSHA requirements.
7.2 Contractor shall provide appropriate safety equipment for scope of contract.
7.3 Contractor shall ensure all employees utilize proper safety equipment for scope of contract.
8.0 SECURITY:
8.1 Contractor employees shall be identified as Contractor and without proper credentials shall be escorted while on NAB Little Creek.
9.0 PLACE OF PERFORMANCE:
9.1 All work will be accomplished at the contractor’s facility with exception of initial boat inspections and preparatory work, as well as any warranty work that may occur. The contractor’s facility will be within 15 miles of NSWG-4. The address for NSWG-4 at Joint Expeditionary Base Little Creek is:
2220 Schofield Road
Virginia Beach, VA 23459
9.1 Recognized Holidays: Contractor will determine need to work on these holidays, but will not have access to the craft while at JEB Little Creek on these holidays:
| New Year’s Day |
| Labor Day |
| Martin Luther King Jr’s Birthday |
| Columbus Day |
| President’s day |
| Veteran’s Day |
| Memorial Day |
| Thanksgiving Day |
| Independence Day |
| Christmas Day |
9.2 Hours of Operation
9.2.1 For work accomplished at JEB Little Creek, the contractor is responsible for conducting business, between the hours of 0730 AM and 1700 PM Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
9.2.2 Exceptions to the hours of operation will only be made on a case by case basis via properly communicated requests made well in advance of the schedule change.
10.0 PERIOD OF PERFORMANCE:
Contractor performance shall commence upon contract award and conclude no later than 31 January 2020 independent of weekends, holidays, and weather delays.
11.0 REFERENCES:
11.1 Contractor shall prepare the design and perform the work in accordance with all applicable federal, state, and local codes, standards, regulations and ordinances, including, but not limited to, the latest edition of applicable codes published by the following organizations:
11.1.1 American Society of Testing and Materials (ASTM)
11.1.2 International Building Code (IBC)
11.1.3 National Fire Protection Association (NFPA)
11.1.4 Occupational Safety and Health Administration (OSHA), https://www.osha.gov
11.1.5 American National Standards Institute (ANSI).
11.1.6 American Society of Testing and Materials (ASTM).
11.1.7 California Building Code (CBC).
11.1.8 Life Safety Code (NFPA 101)
11.1.9 National Electric Code (NEC).
11.1.10 National Electrical Manufactures Association (NEMA).
11.1.11 Underwriter’s Laboratories (UL).
11.1.12 United Facilities Criteria (UFC)
11.1.13 United Facilities Guide Specifications (UFGS)
11.1.14 North American Insulation Manufacturers Association (NAIMA)
11.1.15 Sheet Metal and Air Conditioning Contractors’ National Association
11.1.16 American Society of Heating, Refrigerating and Air-Conditioning Engineers
File details come from the government source that posted it.