Att_2-Contractor_Requirements_Submission_Matrix.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Marine Diesel Engine Maintenance/Overhaul
- Solicitation number
- H92240-19-T-0027
- Issued by
-
United States Special Operations Command
About this file
Contractor Requirements Submission Matrix
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H92240-19-T-0027-Amend_02.pdf | ||
| H92240-19-T-0027-Amend_01.pdf | ||
| Att_5-QASP.pdf | ||
| Att_1-Performance_Work_Statement_(PWS).pdf | ||
| Att_3-IDIQ_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| Att_3a-Material_Services_Worksheet.xlsx | XLSX spreadsheet | |
| H92240-19-T-0027.pdf | ||
| Att_4-Wage_Determination_15-5635_(Rev._-10).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 2 - Contactor Requirements Submission Matrix | ||
| PWS Ref. | PWS Requirement | INSTRUCTIONS: Quoters shall provide the certifications or other information as part of its Technical Volume to demonstrate how its proposed approach meets the below requirements. In each line below, provide a brief statement of how the proposed approach meets the requirements and identify where the supporting information is contained in your Technical Volume. |
| 4.6.2 | Capacity Requirement - Ability to complete the required quantity of Work Packages in the required time limit (PWS 4.6.2: Contractor shall be able to complete up to eight (8) individual or combined Work Packages in a five (5) week period...). | |
| Exhibit 1, 4.7 | Task Accomplishment - Ability to complete the pre-defined individual Work Packages identified under PWS Exhibit 1 in the required time frames allotted (PWS 4.7: Open and Inspect (Work Package 0001) - 1 week, Overhaul (Work Package 0002) – 4 weeks, Dynamometer (Work Package 0003) - 1 week, 24 M Maintenance (Work Package 0004) - 2 weeks, 24 M-1 Maintenance (Work Package 0005) – 2 weeks). | |
| 4.8.1 | Personnel Qualifications - Caterpillar Original Equipment Manufacturer (OEM) marine engine certified Maintenance Technicians with current certifications (PWS 4.8.1). | |
| 4.6.1 | Location - Contractor facilities, where all maintenance and repair work shall be performed, shall be within a thirty (30) mile radius of the Government site, Naval Amphibious Base (NAB) Coronado, California (PWS 4.6.1). | |
| 4.6.1 | Facilities - Facilities must be adequate to complete quality repairs, maintenance, and preservation, as specified in the PWS. Caterpillar authorized dealer/service center with current authorization documentation. | |
| 4.6.3 | Equipment - Equipment of sufficient quality to complete all required testing (such as dyno testing, measurements, etc.), repairs, maintenance, and preservation (media blasters, paint booths & application equipment) to produce a high quality (mechanically and aesthetically) end product. |
File details come from the government source that posted it.