PRODUCT DESCRIPTION

Naval Special Warfare Command

Altitude Chamber Air Unit

1. BACKGROUND

1.1. Current system air unit is in need of replacement due to extended use. Current system was procured as a complete system from Colorado Altitude Training (CAT) that included the chamber, oxygen unit, and control center.

2. OBJECTIVE

2.1. The objective is to procure a replacement air unit system that is compatible with the existing oxygen chamber.

3. DESCRIPTION OF REQUIREMENT

3.1. Product Name: Altitude Chamber Air Unit System

3.2. Description and Capabilities: Air units will produce on average a minimum of 90 liters per minute of hypoxic air containing no more than 13.6% oxygen in hypoxic applications. This requirement is for an 8 unit system capable of supplying 720 l/minute (or higher) of air while maintaining a 13.6% oxygen level or lower. The system will react to preset levels to increase air-exchange rate to mitigate excessive CO2 buildup, and to ultimately limit CO2 content to less than 1%. The system will be used with and must be compatible with a 12,000 square foot CAT Exercise

Room Enclosure, which is 10’3” x 9’ x 8’ high.

3.3. Specifications/Salient Characteristics:

3.3.1. Air Unit

3.3.1.1. Rated at minimum 90 liters per minute (l/m) of hypoxic air at no more than 13.6% oxygen per unit

3.3.1.2. Combined 8 unit capacity shall be 720 l/m

3.3.1.3. Capability of maintaining CO2 levels below 1%

3.3.1.4. Remotely Controlled

3.3.1.5. Networking capability/cables

3.3.1.6. Includes the following:

3.3.1.6.1. External air intake filters

3.3.1.6.2. Delivery hoses

3.3.1.6.3. Waste gas tubing

3.3.2. Digital Control System

3.3.2.1. Controls up to eight units

3.3.2.2. Touchscreen user interface

3.3.2.3. Dual O2, CO2 and barometric pressure sensors

3.3.3. Auxiliary Intake Filter Manifold

3.3.4. Delivery and Installation

3.4. Quantity:

DESCRIPTION Manufacturer Part Number U/I QTY

Air Unit N/A EA 8

Digital Control System N/A EA 1

Auxiliary Intake Filter Manifold N/A EA 1

Delivery and Installation N/A EA 1

4. DELIVERY INFORMATION

4.1. Required delivery date: 30 Days ADC

4.2. Delivery POC Name: TBD at time of Award

4.3. Delivery address: 3632 Guadalcanal Rd.

Bldg. 165W Attn: HPP

San Diego, CA 92155

4.4. Special instructions: N/A

5. SECURITY

5.1. N/A

6. QUALITY ASSURANCE

6.1. The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms to include proper delivery of quantity and type of goods. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.