Attachment - REQUEST FOR INFORMATION (RFI)

View the file

Other files

File Type Posted
N5_Conference_Room_Wall_SOW_28JUL15-solic.doc DOC document
Pricing_Spreadsheet.xlsx XLSX spreadsheet
Solicitation_-15-Q-1057.doc DOC document
WARCOM_N6_B624_Attachment_1.pptx PPTX presentation
N5_Conference_Room_Wall_Layout.pptx PPTX presentation
DBA_Wage_Determination.pdf PDF
N3X_B401_Furniture_PWS_REV_24JUL15-solic.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION # H92240-15-Q-1057 Furniture Requirements

REQUEST FOR INFORMATION (RFI):

Building 624:

1.4.0
a.Disposal
b.Q: Will US NAVY be providing a trash receptacle for the old furniture? –
A: No, but a space can be made available in the parking lot if the contractor would like
to stage one there.

c. Q: Is old furniture to be taken to DRMO ? –

A: The old furniture needs to be removed fromthe building. Disposal/reuse/recycling
is at the contractor’s discretion.

d. Q: Is furniture to be disposed of at local waste facility? A: See above answer.

2. 4.1.1.1.1

a.Q: Can we use a blended product solution? Or since the product is specified in the PWSshould all products used be from the same product line?
Examples:

i. Hon work surfaces with Allsteel Stride workstations?

ii. Steelcase Kick with Steelcase Answer?

A: A blended solution is permissible, but all products must be in new and in undamaged condition. Additionally, work stations must match. Half should not be all Allsteel and the other half a blended solution.

a. Q: How high do you prefer the panels to be for each application?

A: Approximately 80” high for those with double overheads and approximately
65” high for others.
b.Q: Are all monolithic panels or tiled panels using fabric, acoustical type of materials?
See example AllSteel spec.

i. Are any of the outer tiles another type of material, i.e. laminate, metal?

See example AllSteel spec.

ii. What are the finishes to be used? See example AllSteel spec.

Q: 1. Grade of fabric? See example AllSteel spec.

Q: 2. Types of paint? No wall painting part of contract scope.

3. 4.1.1.1.2

a. Q: Need to specify the height of the panels holding the double overheads.

A: These panels should be approximately 80” high.

4. 4.1.1.1.3

b. Q: Should this space be Vinyl Flooring in lieu of Carpet?

A: Yes, expect size to be approximately 8’ X 10’

5. 4.1.1.2.1

c. Q: Laminated Panels? Fabric? Marker Boards? Glass?

A: White boards and a door length narrow window next to the door, with blinds.

d. Q: Is there a need for any equipment to be incorporated within the wall?

A: Not other than already specified.

d. Q: Will TV’s or any other Equipment to be mounted on the walls?

A: There will be a TV mounted in each office.

f. Q: Is there a need for Clear Story Glass at the top of walls for Security Alarms? No.

g. Q: Will any door require Naval XO9’s? No special combination locks required.

6. 4.1.2

h. Q: Carpet squares or broadloom?

iii. Q: Do you have the design specs for the carpet?

A: Not beyond that in the SOW.

iv. Q: Manufactures Brand and color?

A: Manufacturer cannot be specified. Color to be coordinated after award.

7. 4.2.3

i. Q: Are the Doors to match buildings or demountable walls currently being used?

A: Doors should match demountable walls.

8. 4.4.1

j. Q: No new data wires except for those workstations or desk where there are currently no cables available?

A: That is correct. From looking at the layouts there are 9 new workstations that will require SIPR/NIPR cables to be run from the LAN room.

a. Q: If new will you provide the specs for type of wire US NAVY is required to use.

i. Mfg. Brand Name, Size, and type of wire.

A: SIPRNET: RED UTP CAT-6 / Wired TIA/EIA T568B with RJ45 connectors.

NIPRNET: GREEN UTP CAT-6 / Wired TIA/EIA T568B with RJ45 connectors.

k. Q: What type of connector is required at the termination points?

A: Contractor should terminate all connections in network rooms and coordinate with local network teams for patch panel locations. NSW is then responsible for making the actual network connection from the patch panel to the switch.

Building 401:

1. Q: Are there design Elevations for materials used for the Wall.

A: To be provided by contractor after award.

a. Q: Laminated Panels? Fabric? Marker Boards? Glass?

A: Marker boards are required in each office.

b.Q: Is there a need for any equipment to be incorporated within the wall? No.
c.Q: Will TV’s or any other Equipment to be mounted on the walls? No.
d.Q: Is there a need for Clear Story Glass at the top of walls for Security Alarms? No.
e.Q: Will any door require Naval XO9’s ? No.

2. ADA Clearances are not followed for Doorways.

a. Q: Disregard? You’ll have to be more specific in your question.

A: ADA should be followed where able. Construction to fix ADA noncompliances is not a part of this project.

Building 603M

1.4.1.1.2.1
a.Q: I failed to get the location of the two 96x96x82”H workstations.

A: They are in the same location they are in now.

Building 401

1. 4.1.1.1.1-.2

a. Q: Are the panels to be monolithic or tiled?

A: To be determined after award during coordination.

Q: If Tiled, what are the configurations of the tiles?

A: To be determined after award during coordination.

b. Q: Are all monolithic panels or tiled panels using fabric, acoustical type of materials?

A: Review example specs.

Q: Are any of the outer tiles another type of material, i.e. laminate, metal?

A: Review example specs.