H92239-17-T-0010_0003.pdf

PDF 552 KB Posted

Attached to
Special Operations Forces Austere Care Course - Ft Bragg
Solicitation number
H92239-17-T-0010
Issued by

About this file

H92239-17-T-0010-0003 - SOFACC Amended PWS & Answers

View the file

Other files

File Type Posted
H92239-17-T-0010_0005.pdf PDF
H92239-17-T-0010_0004.pdf PDF
H92239-17-T-0010_0002.pdf PDF
H92239-17-T-0010_SOFACC.pdf PDF
H92239-17-T-0010_SOFACC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H92239-17-T-0010

W580XL70100006

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1. The purpose of this amendment is to:

a. Extend the solicitation response date to 28 June 2017 04:00 PM;

b. Make changes to CLINs structure (See summary of changes);

c. Rescinded Travel CLIN 0002 and subsequent option years;

d. Add CLINs 0003 and 0004 and subsequent option years;

e. Make changes to the PWS (All changes are shaded in yellow ); and

f. Provide questions and answ ers (Q&A) (See summary of changes section J).

2. The initial task order w ill be issued for the guaranteed minimum quantity w ith the f irst class utilizing available FY17 funds. The course starting after 1 Oct 17 w ill be included but is Subject to Availability of FY18 Funds.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 50

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X H92239-17-T-0010

X 9B. DATED (SEE ITEM 11)

26-Apr-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2017

CODE

HQ US ARMY SPECIAL OPERATIONS CMD, DCSC

ATTN: AOCO (CONTRACTING)

BLDG E-2929

DESERT STORM DRIVE

FORT BRAGG NC 28310

H92239 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 16-Jun-2017 04:00 PM to 28-Jun-

2017 04:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

This is a per course CLIN. The Contractor shall provide all training materials & aids, instructors, supervision and all other items and services necessary to conduct the full four week course up to six (6) times per contract year. All training shall be IAW PWS and POI.Each= Fixed-price per class with a maximum number of 18 students.

To:

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and per diem required to conduct training at the FBNC and CULEX locations. Fixed Price is also inclusive of CULEX lodging for students as described in paragraph 4.2 of the PWS.Each= Fixed-price per class with a maximum number of 18 students..

CLIN 0002

The CLIN description has changed from Travel to Travel Rescinded.

Travel shall be in accordance with FAR 31.205-46 and the Perfomance Work Statement (PWS). CLIN is used for travel expenses for the contractor to house or transport their instructors on location (see para 1.6.5). (CLIN Unit

Each = per course)

The pricing detail quantity has decreased by 6.00 from 6.00 to 0.00.

The unit of issue Each has been deleted.

The cost constraint NTE has been deleted.

The minimum quantity has decreased by 2.00 from 2.00 to 0.00.

The maximum quantity has decreased by 6.00 from 6.00 to 0.00.

The IDIQ minimum order quantity has decreased by 2.00 from 2.00 to 0.00.

The IDIQ maximum order quantity has decreased by 6.00 from 6.00 to 0.00.

CLIN 1001

This is a per course CLIN. The Contractor shall provide all training materials & aids, instructors, supervision and all other items and services necessary to conduct the full four week course up to six (6) times per contract year. All

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and per diem required to conduct training at the FBNC and CULEX locations. Fixed Price is also inclusive of CULEX lodging for students as described in paragraph 4.2 of the PWS.Each= Fixed-price per class with a maximum number of 18 students..

The pricing detail quantity has changed from UNDEFINED to 6.00.

CLIN 1002

Travel shall be in accordance with FAR 31.205-46 and the Perfomance Work Statement (PWS). CLIN is used for travel expenses for the contractor to house or transport their instructors on location (see para 1.6.5). (CLIN Unit

The unit of issue Each has been deleted.

The cost constraint NTE has been deleted.

CLIN 2001

This is a per course CLIN. The Contractor shall provide all training materials & aids, instructors, supervision and all other items and services necessary to conduct the full four week course up to six (6) times per contract year. All

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and per diem required to conduct training at the FBNC and CULEX locations. Fixed Price is also inclusive of CULEX lodging for students as described in paragraph 4.2 of the PWS.Each= Fixed-price per class with a maximum number of 18 students..

CLIN 2002

Travel shall be in accordance with FAR 31.205-46 and the Perfomance Work Statement (PWS). CLIN is used for travel expenses for the contractor to house or transport their instructors on location (see para 1.6.5). (CLIN Unit

CLIN 3001

This is a per course CLIN. The Contractor shall provide all training materials & aids, instructors, supervision and all other items and services necessary to conduct the full four week course up to six (6) times per contract year. All

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and per diem required to conduct training at the FBNC and CULEX locations. Fixed Price is also inclusive of CULEX lodging for students as described in paragraph 4.2 of the PWS.Each= Fixed-price per class with a maximum number of 18 students..

CLIN 3002

Travel shall be in accordance with FAR 31.205-46 and the Perfomance Work Statement (PWS). CLIN is used for travel expenses for the contractor to house or transport their instructors on location (see para 1.6.5). (CLIN Unit

CLIN 4001

This is a per course CLIN. The Contractor shall provide all training materials & aids, instructors, supervision and all other items and services necessary to conduct the full four week course up to six (6) times per contract year. All

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and per diem required to conduct training at the FBNC and CULEX locations. Fixed Price is also inclusive of CULEX lodging for students as described in paragraph 4.2 of the PWS.Each= Fixed-price per class with a maximum number of 18 students..

CLIN 4002

Travel shall be in accordance with FAR 31.205-46 and the Perfomance Work Statement (PWS). CLIN is used for travel expenses for the contractor to house or transport their instructors on location (see para 1.6.5). (CLIN Unit

CLIN 0003 is added as follows:

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED Each

ODC

COST

CULEX Medical Support Supplies

The Contractor shall be responsible for the distribution of funds to teams during the CULEX exercise and collect unused funds from teams at the end of exercise

(see para 5.14.).

Each= six (6) courses a year, not to exceed (NTE) $750 per team for six (6) teams per course ($750 X 6= $4500.00 (NTE) per course); Base + 4 option years

= ( $4500.00 per course X 6 per year = $27,000.00).

FOB: Destination

MAX COST

CLIN 0004 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

0004 30 Each Recertification Training

FFP

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and per diem required to conduct refresher training leading to NREMT recertification at the FBNC location as described in paragraph 5.15.

Each = 1 student per course up to five (5) students per course.

PURCHASE REQUEST NUMBER: W580XL70100006

MAX

NET AMT

CLIN 1003 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

1003 UNDEFINED Each

OPTION ODC

CLIN 1004 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

1004 30 Each OPTION Recertification Training

FFP

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and

CLIN 2003 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

2003 UNDEFINED Each

OPTION ODC

CLIN 2004 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

2004 30 Each OPTION Recertification Training

FFP

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and

CLIN 3003 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

3003 UNDEFINED Each

OPTION ODC

CLIN 3004 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

3004 30 Each OPTION Recertification Training

FFP

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and

CLIN 4003 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

4003 UNDEFINED Each

OPTION ODC

CLIN 4004 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

4004 30 Each OPTION Recertification Training

FFP

Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

UNITED STATES ARMY SPECIAL OPERATIONS COMMAND

SPECIAL OPERATIONS FORCES AUSTERE CARE COURSE

Part 1

General Information

1. GENERAL: This is a non-personnel services contract to provide Special Operations Forces Austere Care Course training. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, and any other items or non-personal services necessary to perform Special

Operations Forces Austere Care Course instruction as defined in this Performance Work Statement, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2. Background: Small teams (MIST, ODG, CAT-A minus) and/or other designated units/personnel ISO Sensitive

Activities and Special Warfare are conducting low-visibility operations in areas devoid or denied relevant and developed health service support platforms (FST,CSH, medevac, supply). These teams lack organic medical assets

(18D or 68WW1) and mission sets place them squarely in remote locales devoid of the conventional medical assets enjoyed throughout the peak of OEF/OIF/OND campaigns. Some mission sets support coastal and maritime operations. Medical Logistics supply lines are absent or severely restricted by distance, terrain and other factors. In

2014, the 1st SF Commanding General approved an Office of Special Warfare Non-Standard Medical Section

(OSW NS-MED) managed medical training program supporting these teams a/o other designated units/personnel

ISO Sensitive Activities and Special Warfare named the Special Operations Forces Austere Care Course

(SOFACC).

1.2.1. The attendees will consist of non-medical personnel (i.e. 18 series, 35M, 37F, 38B) selected by their command’s surgeon and leadership with aptitude and skill set to successfully complete this course. It will teach them the enhanced medical treatment skills exceeding First-responder Trauma Combat Casualty

Care (TCCC) scope. Attendees earn national certification as Emergency Medical Technicians (EMT).

NREMT certified personnel are qualified to provide EMT-Basic level care, perform Basic Cardiac Life

Support (BLS) and serve as a United States Coast Guard-qualified Medical Care Person in Charge

(MCPIC). MCPIC embodies Occupational Safety & Health Administration (OSHA) certifications that are requirements in supporting many interagency missions. Soldiers learn traditional and non-standard casualty evacuation techniques, and are also introduced to medical intelligence planning methods for teams operating in austere or denied areas across AORs.

1.2.2. The course is four weeks long and consists of two phases. Phase 1 is classroom/didactic-driven instruction and certification. Phase 2 provides validation exercises and practical testing to cement Phase 1 material. SOFACC attendees will familiarize themselves with private sector and DOD health service support systems IOT improve their MEDEVAC/CASEVAC planning capabilities. SOFACC-qualified teams have demonstrated (and reported) that their training enabled them to mitigate risk and conduct operations in areas that were previously restricted.

1.3. Objectives: The basic objective of this training is to ensure that 1ST SF Command operators and all course attendees are certified in compliance with NREMT and MCPIC and meet all certification requirements, which allows them to perform casualty care operations critical for mission success in support of combat operations.

1.4. Scope: NREMT and MCPIC-Instructor-trainers do not exist in the US Army at this time. The OSW-NS MED

SOFACC course is run through extensive Contractor support. The 4-week SOFACC program of instruction uses a collaborative model developed by OSW NS Medical Section and Medical Sections across 1st Special Forces

Command. Non-certificate training will be conducted by a mix of military and civilian instructors. Certification-producing training and certification exams for NREMT and MCPIC will be conducted by civilians nationally accredited to train and certify.

1.4.1. OSW plans on funding up to six (6) courses per contract year. SOFACC training is intended to be conducted at the Eureka Springs SOCoE Training facility. The facility is located near Fort Bragg but not located on main post. There is no requirement to conduct mobile training team events. There will be onsite

OSW subject matter expert for both phases of training. Phase 2, the government will provide over-arching military scenario parameters.

1.4.2. Phase 1. (Didactic): The Contractor shall be in the primary role leading medical training resulting in credentialing and certification as a NREMT and MCPIC with an OSW Military subject matter expert onsite. Training and certification will equip non-medical personnel with 1) a working knowledge base of medical risk mitigation; 2) an increased knowledge of disease, medications and treatment modalities; and

3) an enhanced understanding civilian medical infrastructure development. In addition to the initial test, each student must be allowed one retest per certification. Phase 1 Location: Eureka Springs SOCoE

Training facility

1.4.3. Phase 2. (Hands-on Exercise): The Contractor shall be leading and conducting a training support package (TSP), supporting a practical medical exercise that develops and ingrains didactic information with an OSW Military subject matter expert is onsite. The Government provides the over-arching military scenario parameters and the Contractor provides and leads training events consisting of at least 4 disease and non-battle injury centric medical scenarios requiring student return demonstration of assessment and application of treatment modalities consistent with the scopes of practice for NREMT and MCPIC-certified personnel. The Contractor will provide (1) simulated casualties via role players per training team per day;

along with all facets of moulage and patient scenarios for said simulated casualties; cost, procurement, oversight and a mechanism to supply students with funds to procure commercial off-the-shelf products to facilitate low- visibility medical training during the practical exercises. Contractor will use patient simulator models for all invasive medical procedures for example Foley catheter, advanced airway management, oral and nasal airway, nasogastric and orogastric tube, venipuncture, and intravenous catheter placement. Fresh whole blood transfusions (FWB) will be performed by students on other students as a team event. Phase 2 Location: Hand-on Eureka Springs; CULEX moving toward Jacksonville, NC.

1.4.4. CULEX (Phase 2): Contractor lead, CULEX general scheme of maneuver, 3 part exercise that simulates an extended casualty evacuation across 2/3 of NC:

- Part 1: 0530 link up (LU) FBNC. 0700 LU in "Pineland" in vicinity of (IVO) Biscoe, NC. 12 hrs. in a rural, resource poor, environment. (ex. woods, chicken coops, and hiding) - Movement through populated area, resupply, and move to second rural area.

- Part 2: Rural lay-up and short stop South East NC. Movement to the coast. Hotel required IVO

Jacksonville, NC (within 10 miles North or South)

- Part 3: Populated area / hotel / cabin LU. Boat movement to Airfield for evacuation starting 1500

UTC.

1.5. Period of Performance: The period of performance shall be an ordering period for one (1) Base Year of 12 months with Four (4) 12 month Option Periods.

1.6. General Information

1.6.1. Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government.

1.6.1.1. Quality Control Program: The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the government recipient of services.

This relationship shall be achieved through an effective prevention based Quality Control Program dedicated to ensuring the best possible products and services to end users. The Contractor shall provide their final written Quality Control Plan (QCP) no later than (NLT) 15 days after award and within five (5) days of any proposed changes.

1.6.1.1.1. The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection;

discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies;

procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints.

1.6.1.1.2. Within 7 days of completion of each iteration the Contractor shall provide, all reports generated as a result of the Contractor’s quality control efforts. This shall include any summary information used to track quality control, including any charts/graphs.

1.6.1.1.3. The Contractor’s QCP shall be incorporated into and become part of this contract after the plan has been accepted by the KO. Proposed changes made after KO acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision. The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract.

1.6.1.2. Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a

CDR will be issued. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.6.2. Quality Assurance: The COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

When an observation indicates defective performance, the COR will require the Contractor or designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance.

1.6.3. Recognized Holidays: The contractor shall not be required to perform services on recognized Federal

Holidays.

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

1.6.3.1. When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday. The contractor shall work on the days the Government is scheduled to work.

1.6.3.2. When an unforeseen installation closure occurs on a regularly scheduled day of work, the

Contractor will have the following options:

1.6.3.3. Reschedule the work so it is performed the following day unless the following day falls on a weekend.

1.6.3.4. Reschedule the work on any day that is mutually satisfactory

1.6.4. Hours of Operation: The contractor is responsible for establishing a POI and work schedule to conduct training that meets the requirements of this PWS. Facilities are not available during Federal Holidays or when the

Government is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor is authorized to conduct training on Saturdays in order to maintain course standards and to meet operational requirements in this PWS. In Phase 2, specifically during the CULEX, the hours will vary

(36 hour exercise). The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5. Place of Performance: The work to be performed under this contract will be performed at the Eureka Springs

SOCoE Training Facility on MacArthur Rd near Fort Bragg NC. The contractor will coordinate with the COR prior to the training event to ensure the facilities are reserved and available.

1.6.6. Type of Contract: The government will award an Indefinite Delivery/Indefinite Quantity (ID/IQ) Firm Fixed price (FFP) contract.

1.6.7. Physical Security Requirements: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. During training at government facilities, at the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.8. Special Qualifications: The contractor shall be responsible for providing the appropriate number of instructors that must be certified, qualified and accredited to provide training, assessment and national certification testing awarding National Registry Emergency Medical Technician-Basic, BLS, and MCPIC.

1.6.8.1. The Contractor shall have experience providing and teaching National Registry EMT (NREMT) certification within austere conditions and teaching United States Coast Guard Medical Care Provider In-

Charge (MCPIC) certification. The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS.

1.6.8.2. SOFACC Training Assessment Mechanisms: OSW-NS-MED is responsible for collecting, analyzing, and delivering quantitative and qualitative student and course data on both performance and testing. This data will be used to tailor the POI and training to achieve minimum board pass rates consistent with the current national and state average pass rate for certifying exams. Contractor will conduct periodic quizzes (learning checks) and quiz retesting will be decided by the Contractor on a case-by-case basis. Retesting rates, End of Course Evaluations and After Action Review data sets are collected and reviewed by the Contracting Officer Representative to determine the training value of Contractor training. The Contracting Officer Representative (COR) or Contracting Officer (KO) disseminates results of the interpreted data sets to the Contractor within 14 working days of completion of training. These data will also be formatted to be filtered by MOS, Unit, Experience/Years in SOF, age, and any other sub-category identified by the OSW NS Med. All data, and associated products derived from the data, is the property of the United States Government.

1.6.8.3. The Contractor will provide written acknowledgement of feedback received from the COR or KO and, when necessary, submit change recommendations aimed at mitigating training deficits prior to the next

SOFACC iteration. Plans of Instruction and individual Lesson Plans will evolve to capture identified needs.

1.6.8.4. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements. They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

1.6.8.5. Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

1.6.8.6. All Contractor employees, including sub-contractor employees, requiring access to an Army or

USSOCOM controlled installation, facility, or area shall comply with applicable security policies and procedures (provided by the government representative). This includes policies pertaining to the use or prohibition of electronic recorders, devices, cameras, etc. If the Contractor is required to take photographs or videos on a Government Installation, the Contractor must obtain written permission from the Senior

Commander. The Contractor shall also provide all information required for background checks to meet installation and facility access requirements to be completed by the installation Provost Marshall Office, Director of Emergency Services, or Security Office. The Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, USSOCOM, USASOC and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should

Force Protection Condition (FPCON) at any individual facility or installation change, the government may require changes in Contractor security matters or processes.

1.6.8.7. All contractor employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials. The Contractor will coordinate with the COR and/or the facility security office for access if/when required.

1.6.8.8. Pre-screen applicants using E-Verify Program. The Contractor must pre-screen applicants using the

E-verify Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the applicant has two valid forms of government issued identification. Contractor responsible for ensuring security documentation is completed by applicants. The

Contractor must facilitate the security screening process for CRPs (US/non-US citizens who do not require a security clearance and/or access to classified information) by ensuring the applicants complete the required security documentation (Privacy Act Advisement, SF 85P, Fingerprint Cards, OFI Form 86C

Special Agency Check (SAC), Intelligence Security Questionnaire, and a National Intelligence Agency

Spreadsheet). A blank security CI-screening packet will be provided to the Contractor by the Contracting

Office upon request. An initial list of applicants must be provided to the COR no later than 7 business days after the initial contract award to start the CI-focused security screening process.

1.6.8.9. NCIC and terrorist threat data base screening required. All contractor employees, including subcontractor employees, who are not in possession of a current Common Access Card (CAC) will be vetted by the local security office to determine fitness and eligibility for access IAW DTM 09-012, paragraph 2.b(4) to include but not limited to an NCIC III and Terrorist Database screening. The Contractor will ensure that the government has sufficient biographical information to conduct said screening including, but not limited to the person’s name, date of birth, and social security number.

1.6.8.10. Contractors must provide completed packets at least 70 days prior to the start of the training event/exercise in a sealed envelope/box to the designated security office conducting the CI-focused security screenings. The Contractor must ensure that applicants are available for scheduled interviews. The

Contractor must provide the COR notification of those applicants who will not be available for interviews prior to the scheduled event.

1.6.8.11. COR notification to the Contractor. The COR will notify the Contractor of the access determination for each applicant after the CI-focused screenings are complete. The Contractor must provide a final list of vetted/approved applicants to the COR at least 7 business days prior to the start of the training/exercise event to ensure that the Installation Security Office is notified in advance.

1.6.8.12. iWATCH training. The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the government requiring activity

Antiterrorism Officer (ATO)). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the designated security office. Training shall be completed within 60 calendar days of contract award and within 30 calendar days of new employees' commencing performance with the results reported to the COR no later than 30 days after contract award and new employees' commencing performance.

1.6.9. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal

Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.10. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration the COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the

Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the

Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11. Key Personnel: The Contractor shall provide a Program Manager (PM) who shall be responsible for the performance of the work under this contract. The name of this person, and an Alternate PM (APM), who shall act for the Contractor when the PM is absent, shall be designated in writing to the KO at the post award conference.

The PM or APM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. This position is expected to forecast course and contractor needs for long, medium, and short range management. This position is to ensure contractor portion of training is finalized prior to training at least one quarter

(three months), or two iterations ahead, whichever is greater. The PM or APM shall be available between the hours of 8:00 AM to 5:00 PM, Monday through Friday, except federal holidays or when the government facility is closed for administrative reasons.

1.6.12. Contractor Personnel: The Contractor shall develop, maintain, and provide to the COR an updated roster which shall include names and positions of all Contractor personnel. The Contractor shall submit initial roster to the

COR within ten (10) calendar days after commencement of base period of performance.

1.6.12.1. Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents. Contractor personnel shall be neatly groomed and dressed in business casual attire to present a professional appearance at all times.

1.6.12.2. Identification of Contractor Employees: All contract personnel attending meetings, answering

Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. In secure government facilities, the wear of badges may be required during the performance of these services. The COR or designated representative will coordinate for obtaining badges as necessary for contractor employees.

1.6.13. Travel Rescinded: “Fixed price is inclusive of all labor, supplies, facilities, and contractor travel and per diem required to conduct training at the FBNC and CULEX locations. Fixed Price is also inclusive of CULEX lodging for students as described in paragraph 4.2 of the PWS.”

1.6.14. Data Rights: The Government has unlimited rights to all documents/material produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be

Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other

Government rights. The Government does not have these rights with regard to training material provided by the contractor not produced under this contract.

1.6.15. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information

(e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the

Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.5. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.6. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.7. QUALITY ASSURANCE. The government procedures to verify that services being performed by the

Contractor are performed according to acceptable standards.

2.1.8. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.9. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.10. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.11. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative

AR Army Regulation

CFR Code of Federal Regulations

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTS Commercial-Off-the-Shelf

CULEX Culmination Exercise

DA Department of the Army

DD250 Department of Defense Form 250 (Receiving Report)

DD254 Department of Defense Contract Security Requirement List

DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center

DOD Department of Defense

FAR Federal Acquisition Regulation

HIPAA Health Insurance Portability and Accountability Act of 1996

IAW In Accordance With

JTWS Joint Threat Warning System

KO Contracting Officer

OCI Organizational Conflict of Interest

ODC Other Direct Costs

OSW Office of Special Warfare

PIPO Phase 1n/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

NREMT National Registry of Emergency Medical Technicians

SOFACC Special Operations Forces Austere Care Course

SOFARS Special Operations Federal Acquisition Regulation Supplement

TCCC Trauma Casualty Care Course

TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: none

3.2. Facilities/Utilities: OSW NS MED to coordinate access and management of the Eureka Springs SOCoE

Training Facility off of MacArthur Rd near Fort Bragg. Storage of equipment and class VII will be allowed at training site.

3.3. Equipment: Audio/Visual aids are available

3.4. Materials:

- Austere Medical Handbook (1 per student)

- OSW-NS Medical Bag - OSW NS MED will issue each medic a stocked aid bag for the course filled with all class VIII medical supplies needed. Students will return aid bags at course completion.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.1.1. The contractor must produce a program of instruction approach with the understanding that based on feedback and mission changes could evolve over time to fit identified needs.

4.1.2. All equipment will be supplied by Contractor for phase 1. Contractor will provide National

Registry recommended textbooks; new/unopened consumable medical supplies per student each day IAW

US medical standards of quality for patient care. See Technical Exhibit 5 for medical supplies list. The

Contractor is responsible for all items, associated costs, transport, procurement, and anything not listed necessary to fulfill phase 2 support requirements (Moulage requirement examples per Technical Exhibit 6).

4.1.3. Labor/Non-Labor Summaries: The Contractor shall provide the COR invoice summaries detailing current courses labor, non-labor and ODC data, and cumulative labor, non-labor, and ODC data. The

Contractor shall provide the COR invoice summaries (labor, non-labor, ODC data) within thirty days of the last day of each course.

4.2. Facilities: Performed at the Eureka Springs SOCoE near Fort Bragg NC. The contractor will coordinate with the

COR prior to the training event to ensure the Government facilities are reserved and available.

4.2.1. The CULEX shall be a fluid 36 hours movement toward coast of NC (ref para. 1.4.4.). The contractor shall provide one (1) commercially available hotel room (3-star equivalent) with double beds per team in addition to rooms to support instructors and role players for one night to facilitate the SOFACC

CULEX during each iteration of training. The location shall be in the vicinity of Jacksonville, NC (North or

South 10 miles). The contractor shall also provide one non-standard commercial facility in an urban location in the vicinity of Fayetteville, NC to use as an urban extraction environment during the first day of the CULEX. The locations are to be fully operational and ready for training with OSW-NS MED personnel Tuesday thru Thursday of week four (Phase 2) of each SOFACC course, and will depend on

Exercise scenario.

4.3. Materials & Equipment: The Contractor shall provide all equipment listed in below for each training event as well as all further unclassified training materials and supplies necessary to meet the requirements under this PWS.

4.3.1. The Contractor will provide all necessary equipment and materials to conduct phase 1 training;

including, but not limited to all medical supplies, office supplies, and text books. The maximum number of students per iteration is 18 individuals.

4.3.2. All consumable medical supplies are expected to be consumed during the course; each student will have the availability to train using new expendable materials each day. Intent: expose students in training to what will be used in a real emergency scenario; including packaging of supplies. This does not imply materials will not be reused, e.g. commercial tourniquets can be reused; the intent is for students to experience employing material from commercial packaging to patient application at least once per item per course.

4.3.3. Office Supplies will be: 18 each count notebook, 36 each pen and pencil, 6 each multicolored dry erase marker sets, 6 each dry erase easels, 6 each clipboards, one spool of 1" tubular nylon greater than

100', 30 ea. AA, AAA, C, and D batteries, and additional office supplies per SOFACC course lifespan as identified by either OSW NS MED or Contractor.

4.3.4. Medical supplies needed: Per Attachment 2. This is a minimum list that must fulfill the needs of

18 students/course and be adjusted for currency in medical treatment protocols as appropriate; final discretion residing with OSW NS MED.

4.3.5. The contractor shall provide vehicle support for instructors and students. The vehicles shall be equivalent to Panel Vans and contractor shall provide 1 per team (team = 3 students, 1 Role Player Patient, 1 Instructor). Students will be driving to simulate actual patient extraction experience during CULEX. The contractor shall be responsible for refueling vehicles throughout the exercise. The vehicles are to be fully operational, fueled and ready for training CULEX during phase 2.

4.3.6. All associated testing cost and supplies.

PART 5

SPECIFIC REQUIREMENTS/TASKS

5. Specific Contractor Requirements/Tasks:

5.1. Contractor personnel shall be able to pass a basic US Government background check in order to gain access to US Military bases.

5.2. Contractor personnel shall be certified, qualified and accredited to provide training, assessment and national certification testing awarding National Registry Emergency Medical Technician-Basic, Basic Life Saving

(BLS), and Medical Care Provider in Charge (MCPIC).

5.3. The Contractor shall have experience providing and teaching NREMT certification and teaching United

States Coast Guard MCPIC certification.

5.4. The Contractor assumes all liability for their personnel, Contractors, and products. The US Government assumes all liability for their personnel, products, and vehicles operated by government employees.

5.5. The Contractor shall be responsible for coordinating and scheduling on-post or off-post testing facility that meets National Registry Emergency Medical Technician-Basic and MCPIC requirements/constraints.

5.6. Contractor shall provide one (1) simulated casualties via role players per training team per day for Phase 2

(hands on scenarios and CULEX). Contractor role players can be locally hired however, the contractor is liable for providing medical coverage in the event of an adverse outcome. They shall be physically able to endure extended exercise scenarios, as well as endure local outdoor and seasonal weather conditions. They must also be able to provide realistic patient reactions during exercise scenarios. The Contractor assumes all liability and responsibility for role players during medical training scenarios. The Contractor provides simulators and mannequins for use whenever feasible.

5.7. The Contractor shall provide a Program Manager (PM) who shall be responsible for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .