DRAFT RFP 091030 FBO.pdf

PDF 787 KB Posted

Attached to
Maritime Assault Suit System
Solicitation number
H92222-10-R-0004
Issued by

About this file

MASS Draft Solicitation

View the file

Other files

File Type Posted
solicitation Update1 100311.docx DOCX document
Questions Received After 13 Nov 2009.pdf PDF
MASS Questions Through 12 Nov _2_ 091119.pdf PDF
Amendment 1 DOC 091119.rtf RTF text file
MASS CDRL A001 091104.pdf PDF
SOW Modified 091104.pdf PDF
RFP Modified 091104.doc DOC document
MASS CDRL.pdf PDF
MASS Design Evaluation Form.pdf PDF
MASS SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ USSOCOM SORDAC-K

ATTN: LEATRICE FREDERICK

7701 TAMPA POINT BLVD

MACDILL AFB FL 33621

813-826-6513

813-826-7504

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

X

DO-C9

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

H92222-10-R-0004 30-Oct -2009

b. TELEPHONE NUMBER

813-826-6513

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 30 Nov 2009

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

22. UNIT 23. UNIT PRICE 24. AMOUNT

21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

H92222

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LEATRICE J. FREDERICK

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

315299

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

1 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY

22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT(Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

H92222-10-R-0004

ITEM NO SUPPLIES/SERVICES MAX UNIT UNIT PRICE MAX AMOUNT

0001 QUANTITY

Each

MASS Over-Garment - Small Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder pricing which will allow for the maximum economies of scale.

FOB: Destination

MAX

NET AMT

0002 QUANTITY

Each

MASS Over-Garment - Small Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

0003 QUANTITY

Each

MASS Over-Garment - Small Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

0004 QUANTITY

Each

MASS Over-Garment - Medium Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

0005 QUANTITY

Each

MASS Over-Garment - Medium Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0006 5500 Each MASS Over-Garment - Medium Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0007 5500 Each MASS Over-Garment - Large Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0008 5500 Each MASS Over-Garment - Large Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0009 5500 Each MASS Over-Garment - Large Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0010 5500 Each MASS Over-Garment - XLarge Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder pricing which will allow for the maximum economies of scale.

UNIT UNIT PRICE MAX AMOUNT

0011 5500 Each MASS Over-Garment - XLarge Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0012 5500 Each MASS Over-Garment - XLarge Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0013 5500 Each MASS Over-Garment - XXLarge Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0014 5500 Each MASS Over-Garment - XXLarge Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0015 5500 Each MASS Over-Garment - XXLarge Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0016 UNDEFINED Each Zipper Replacement (MASS) - Front Entry

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) to include other MASS not purchased under this contract.

UNIT UNIT PRICE MAX AMOUNT

0017 UNDEFINED Each Zipper Replacement (MASS)- Relief

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.

UNIT UNIT PRICE MAX AMOUNT

0018 UNDEFINED Each Wrist Gasket (MASS) - Spare Part

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.

UNIT UNIT PRICE MAX AMOUNT

0019 UNDEFINED Each Neck Gasket (MASS) - Spare Part

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.

UNIT UNIT PRICE MAX AMOUNT

0020 UNDEFINED Each Neck Relief Ring (MASS) - Spare Part

FFP

UNIT UNIT PRICE MAX AMOUNT

0021 UNDEFINED Each Suspenders (MASS) - Spare Part

FFP

UNIT UNIT PRICE MAX AMOUNT

0022 UNDEFINED Each Zipper T Bar (MASS) - Spare Part

FFP

UNIT UNIT PRICE MAX AMOUNT

0023 UNDEFINED Each Repair Kit (MASS) w Repair Instructions

FFP

UNIT UNIT PRICE MAX AMOUNT

0024 UNDEFINED Each Laundering (MASS)

FFP

Contractor shall launder MASS in accordance with paragraph 9 of Statement of Work

UNIT UNIT PRICE MAX AMOUNT

0025 UNDEFINED Each Users Manual (MASS)

FFP

Technical Data Item Provide operator manual in accordance with paragraph 1 of the Statement of Work and CDRL A001.

UNIT UNIT PRICE MAX AMOUNT

0026 5500 Each L- MASS Over-Garment - Small Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0027 5500 Each L- MASS Over-Garment - Small Regular

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0028 5500 Each L- MASS Over-Garment - Small Tall

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0029 5500 Each L- MASS Over-Garment - Medium Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0030 5500 Each L- MASS Over-Garment - Medium Regular

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0031 5500 Each L- MASS Over-Garment - Medium Tall

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0032 5500 Each L- MASS Over-Garment - Large Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0033 5500 Each L- MASS Over-Garment - Large Regular

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0034 5500 Each L- MASS Over-Garment - Large Tall

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0035 5500 Each L- MASS Over-Garment - XLarge Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0036 5500 Each L- MASS Over-Garment - XLarge Regular

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0037 5500 Each L- MASS Over-Garment - XLarge Tall

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0038 5500 Each L- MASS Over-Garment - XXLarge Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0039 5500 Each L- MASS Over-Garment - XXLarge Regular

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0040 5500 Each L- MASS Over-Garment - XXLarge Tall

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0041 UNDEFINED Each Zipper Replacement (L-MASS)- Front Entry

FFP

The non-warranted services of the Lightweight Maritime Assault Suit System (L-

MASS)

UNIT UNIT PRICE MAX AMOUNT

0042 UNDEFINED Each Zipper Replacement (L-MASS)- Relief

FFP

The non-warranted services of the Lightweight Maritime Assault Suit System (L- MASS) replacement.

UNIT UNIT PRICE MAX AMOUNT

0043 UNDEFINED Each Gasket (L-MASS) - Wrist

FFP

The non-warranted services of the Lightweight Maritime Assault Suit System (L- MASS) replacement.

UNIT UNIT PRICE MAX AMOUNT

0044 UNDEFINED Each Neck Gasket (L-MASS) - Spare Part

FFP

The non-warranted services of the Lightweight Maritime Assault Suit System (L-

MASS).

UNIT UNIT PRICE MAX AMOUNT

0045 UNDEFINED Each Neck Relief Ring (L-MASS) - Spare Parts

FFP

Replacement part for the Lightweight Maritime Assault Suit System (L-MASS)

UNIT UNIT PRICE MAX AMOUNT

0046 UNDEFINED Each Suspenders (L-MASS) - Spare Part

FFP

Replacement part for the Light Weight (LW) Maritime Assault Suit System

(MASS)

UNIT UNIT PRICE MAX AMOUNT

0047 UNDEFINED Each Zipper T Bar (L-MASS) - Spare Part

FFP

Replacement part for the Light Weight (LW) Maritime Assault Suit System

(MASS)

UNIT UNIT PRICE MAX AMOUNT

0048 UNDEFINED Each Repair Kit (L-MASS) w Repair Instruction

FFP

UNIT UNIT PRICE MAX AMOUNT

0049 UNDEFINED Each Laundering (L-MASS)

FFP

Contractor shall launder Light Weight (LW) MASS in accordance with paragraph 9 of Statement of Work

UNIT UNIT PRICE MAX AMOUNT

0050 UNDEFINED Each Users Manual (L-MASS)

FFP

Technical Data Item Provide operator manual in accordance with paragraph 1 of the Statement of Work, and CDRL A001.

UNIT UNIT PRICE MAX AMOUNT

0051 5500 Each MASS Over-Garment - AOR 1 - Small Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern

UNIT UNIT PRICE MAX AMOUNT

0052 5500 Each MASS Over-Garment -AOR 1- Small Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0053 5500 Each MASS Over-Garment - AOR 1 - Small Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0054 5500 Each MASS Over-Garment -AOR 1- Medium Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0055 5500 Each MASS Over-Garment -AOR 1- Medium Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work

UNIT UNIT PRICE MAX AMOUNT

0056 5500 Each MASS Over-Garment - AOR 1 - Medium Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work

UNIT UNIT PRICE MAX AMOUNT

0057 5500 Each MASS Over-Garment - AOR 1 - Large Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0058 5500 Each MASS Over-Garment -AOR 1- Large Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0059 5500 Each MASS Over-Garment - AOR 1 - Large Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0060 5500 Each MASS Over-Garment -AOR 1-XLarge Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0061 5500 Each MASS Over-Garment -AOR 1-XLarge Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0062 5500 Each MASS Over-Garment -AOR 1- XLarge Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0063 5500 Each MASS Over-Garment - AOR 1- XXLarge Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0064 5500 Each MASS Over-Garment -AOR 1-XXLarge Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0065 5500 Each MASS Over-Garment - AOR 1 -XXLarge Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0066 5500 Each MASS Over-Garment - AOR 2 - Small Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0067 5500 Each MASS Over-Garment - AOR 2 -Small Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0068 5500 Each MASS Over-Garment - AOR 2 - Small Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0069 5500 Each MASS Over-Garment - AOR 2 - Medium Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0070 5500 Each MASS Over-Garment -AOR 2 -Medium Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0071 5500 Each MASS Over-Garment - AOR 2 - Medium Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0072 5500 Each MASS Over-Garment - AOR 2 - Large Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0073 5500 Each MASS Over-Garment -AOR 2- Large Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0074 5500 Each MASS Over-Garment - AOR 2 - Large Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0075 5500 Each MASS Over-Garment - AOR 2 -XLarge Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0076 5500 Each MASS Over-Garment -AOR 2-XLarge Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0077 5500 Each MASS Over-Garment - AOR 2 -XLarge Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0078 5500 Each MASS Over-Garment - AOR 2 -XXLarge Short

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0079 5500 Each MASS Over-Garment -AOR 2-XXLarge Regular

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0080 5500 Each MASS Over-Garment - AOR 2 -XXLarge Tall

FFP

Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0081 5500 Each L-MASS AOR 1 - Small Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0082 5500 Each L-MASS AOR 1 - Small Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0083 5500 Each L-MASS AOR 1 - Small Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0084 5500 Each L-MASS AOR 1 - Medium Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0085 5500 Each L-MASS AOR 1 - Medium Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0086 5500 Each L-MASS AOR 1 - Medium Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0087 5500 Each L-MASS AOR 1 - Large Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0088 5500 Each L-MASS AOR 1 - Large Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0089 5500 Each L-MASS AOR 1 - Large Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0090 5500 Each L-MASS AOR 1- XLarge Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0091 5500 Each L-MASS AOR 1- XLarge Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0092 5500 Each L-MASS AOR 1 - XLarge Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0093 5500 Each L-MASS AOR 1 - XXLarge Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0094 5500 Each L-MASS AOR 1 - XXLarge Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0095 5500 Each L-MASS AOR 1 - XXLarge Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0096 5500 Each L-MASS AOR 2 - Small Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0097 5500 Each L-MASS AOR 2 - Small Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0098 5500 Each L-MASS AOR 2 - Small Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0099 5500 Each L-MASS AOR 2 - Medium Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0100 5500 Each L-MASS AOR 2 - Medium Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0101 5500 Each L-MASS AOR 2 - Medium Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0102 5500 Each L-MASS AOR 2 - Large Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0103 5500 Each L-MASS AOR 2 - Large Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0104 5500 Each L-MASS AOR 2 - Large Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0105 5500 Each L-MASS AOR 2 - XLarge Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0106 5500 Each L-MASS AOR 2 - XLarge Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

UNIT UNIT PRICE MAX AMOUNT

0107 5500 Each L-MASS AOR 2 - XLarge Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0108 5500 Each L-MASS AOR 2 - XXLarge Short

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0109 5500 Each L-MASS AOR 2 - XXLarge Regular

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

0110 5500 Each L-MASS AOR 2 - XXLarge Tall

FFP

Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1001 5500 Each MASS Over-Garment - Small Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1002 5500 Each MASS Over-Garment - Small Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1003 5500 Each MASS Over-Garment - Small Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1004 5500 Each MASS Over-Garment - Medium Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1005 5500 Each MASS Over-Garment - Medium Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1006 5500 Each MASS Over-Garment - Medium Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1007 5500 Each MASS Over-Garment - Large Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1008 5500 Each MASS Over-Garment - Large Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1009 5500 Each MASS Over-Garment - Large Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1010 5500 Each MASS Over-Garment - XLarge Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1011 5500 Each MASS Over-Garment - XLarge Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1012 5500 Each MASS Over-Garment - XLarge Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1013 5500 Each MASS Over-Garment - XXLarge Short

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1014 5500 Each MASS Over-Garment - XXLarge Regular

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1015 5500 Each MASS Over-Garment - XXLarge Tall

FFP

Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1016 UNDEFINED Each Zipper Replacement (MASS) - Front Entry

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) to include other MASS not purchased under this contract.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1017 UNDEFINED Each Zipper Replacement (MASS)- Relief

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.

UNIT UNIT PRICE MAX AMOUNT

1018 UNDEFINED Each Wrist Gasket (MASS) - Spare Part

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.

UNIT UNIT PRICE MAX AMOUNT

1019 UNDEFINED Each Neck Gasket (MASS) - Spare Part

FFP

The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.

UNIT UNIT PRICE MAX AMOUNT

1020 UNDEFINED Each Neck Relief Ring (MASS) - Spare Part

FFP

UNIT UNIT PRICE MAX AMOUNT

1021 UNDEFINED Each Suspenders (MASS) - Spare Part

FFP

UNIT UNIT PRICE MAX AMOUNT

1022 UNDEFINED Each Zipper T Bar (MASS) - Spare Part

FFP

UNIT UNIT PRICE MAX AMOUNT

1023 UNDEFINED Each Repair Kit (MASS) w Repair Instructions

FFP

UNIT UNIT PRICE MAX AMOUNT

1024 UNDEFINED Each Laundering (MASS)

FFP

Contractor shall launder MASS in accordance with paragraph 9 of Statement of Work

UNIT UNIT PRICE MAX AMOUNT

1025 UNDEFINED Each Users Manual (MASS)

FFP

Technical Data Item Provide operator manual in accordance with paragraph 1 of the Statement of Work and CDRL A001.

UNIT UNIT PRICE MAX AMOUNT

1026 5500 Each L- MASS Over-Garment - Small Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1027 5500 Each L- MASS Over-Garment - Small Regular

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1028 5500 Each L- MASS Over-Garment - Small Tall

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1029 5500 Each L- MASS Over-Garment - Medium Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

UNIT UNIT PRICE MAX AMOUNT

1030 5500 Each L- MASS Over-Garment - Medium Regular

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1031 5500 Each L- MASS Over-Garment - Medium Tall

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.

Ordering Period Two: Jan 2011 - Dec 2011

Offerors shall establish a time period for ordering, as well as, provide stepladder

UNIT UNIT PRICE MAX AMOUNT

1032 5500 Each L- MASS Over-Garment - Large Short

FFP

Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .