DRAFT RFP 091030 FBO.pdf
PDF 787 KB Posted
- Attached to
- Maritime Assault Suit System
- Solicitation number
- H92222-10-R-0004
- Issued by
-
United States Special Operations Command
About this file
MASS Draft Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| solicitation Update1 100311.docx | DOCX document | |
| Questions Received After 13 Nov 2009.pdf | ||
| MASS Questions Through 12 Nov _2_ 091119.pdf | ||
| Amendment 1 DOC 091119.rtf | RTF text file | |
| MASS CDRL A001 091104.pdf | ||
| SOW Modified 091104.pdf | ||
| RFP Modified 091104.doc | DOC document | |
| MASS CDRL.pdf | ||
| MASS Design Evaluation Form.pdf | ||
| MASS SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ USSOCOM SORDAC-K
ATTN: LEATRICE FREDERICK
7701 TAMPA POINT BLVD
MACDILL AFB FL 33621
813-826-6513
813-826-7504
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
X
DO-C9
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
H92222-10-R-0004 30-Oct -2009
b. TELEPHONE NUMBER
813-826-6513
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 30 Nov 2009
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
22. UNIT 23. UNIT PRICE 24. AMOUNT
21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
H92222
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LEATRICE J. FREDERICK
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
315299
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
1 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY
22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT(Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
H92222-10-R-0004
ITEM NO SUPPLIES/SERVICES MAX UNIT UNIT PRICE MAX AMOUNT
0001 QUANTITY
Each
MASS Over-Garment - Small Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder pricing which will allow for the maximum economies of scale.
FOB: Destination
MAX
NET AMT
0002 QUANTITY
Each
MASS Over-Garment - Small Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
0003 QUANTITY
Each
MASS Over-Garment - Small Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
0004 QUANTITY
Each
MASS Over-Garment - Medium Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
0005 QUANTITY
Each
MASS Over-Garment - Medium Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0006 5500 Each MASS Over-Garment - Medium Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0007 5500 Each MASS Over-Garment - Large Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0008 5500 Each MASS Over-Garment - Large Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0009 5500 Each MASS Over-Garment - Large Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0010 5500 Each MASS Over-Garment - XLarge Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder pricing which will allow for the maximum economies of scale.
UNIT UNIT PRICE MAX AMOUNT
0011 5500 Each MASS Over-Garment - XLarge Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0012 5500 Each MASS Over-Garment - XLarge Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0013 5500 Each MASS Over-Garment - XXLarge Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0014 5500 Each MASS Over-Garment - XXLarge Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0015 5500 Each MASS Over-Garment - XXLarge Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0016 UNDEFINED Each Zipper Replacement (MASS) - Front Entry
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) to include other MASS not purchased under this contract.
UNIT UNIT PRICE MAX AMOUNT
0017 UNDEFINED Each Zipper Replacement (MASS)- Relief
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.
UNIT UNIT PRICE MAX AMOUNT
0018 UNDEFINED Each Wrist Gasket (MASS) - Spare Part
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.
UNIT UNIT PRICE MAX AMOUNT
0019 UNDEFINED Each Neck Gasket (MASS) - Spare Part
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.
UNIT UNIT PRICE MAX AMOUNT
0020 UNDEFINED Each Neck Relief Ring (MASS) - Spare Part
FFP
UNIT UNIT PRICE MAX AMOUNT
0021 UNDEFINED Each Suspenders (MASS) - Spare Part
FFP
UNIT UNIT PRICE MAX AMOUNT
0022 UNDEFINED Each Zipper T Bar (MASS) - Spare Part
FFP
UNIT UNIT PRICE MAX AMOUNT
0023 UNDEFINED Each Repair Kit (MASS) w Repair Instructions
FFP
UNIT UNIT PRICE MAX AMOUNT
0024 UNDEFINED Each Laundering (MASS)
FFP
Contractor shall launder MASS in accordance with paragraph 9 of Statement of Work
UNIT UNIT PRICE MAX AMOUNT
0025 UNDEFINED Each Users Manual (MASS)
FFP
Technical Data Item Provide operator manual in accordance with paragraph 1 of the Statement of Work and CDRL A001.
UNIT UNIT PRICE MAX AMOUNT
0026 5500 Each L- MASS Over-Garment - Small Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0027 5500 Each L- MASS Over-Garment - Small Regular
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0028 5500 Each L- MASS Over-Garment - Small Tall
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0029 5500 Each L- MASS Over-Garment - Medium Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0030 5500 Each L- MASS Over-Garment - Medium Regular
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0031 5500 Each L- MASS Over-Garment - Medium Tall
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0032 5500 Each L- MASS Over-Garment - Large Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0033 5500 Each L- MASS Over-Garment - Large Regular
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0034 5500 Each L- MASS Over-Garment - Large Tall
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0035 5500 Each L- MASS Over-Garment - XLarge Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0036 5500 Each L- MASS Over-Garment - XLarge Regular
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0037 5500 Each L- MASS Over-Garment - XLarge Tall
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0038 5500 Each L- MASS Over-Garment - XXLarge Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0039 5500 Each L- MASS Over-Garment - XXLarge Regular
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0040 5500 Each L- MASS Over-Garment - XXLarge Tall
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0041 UNDEFINED Each Zipper Replacement (L-MASS)- Front Entry
FFP
The non-warranted services of the Lightweight Maritime Assault Suit System (L-
MASS)
UNIT UNIT PRICE MAX AMOUNT
0042 UNDEFINED Each Zipper Replacement (L-MASS)- Relief
FFP
The non-warranted services of the Lightweight Maritime Assault Suit System (L- MASS) replacement.
UNIT UNIT PRICE MAX AMOUNT
0043 UNDEFINED Each Gasket (L-MASS) - Wrist
FFP
The non-warranted services of the Lightweight Maritime Assault Suit System (L- MASS) replacement.
UNIT UNIT PRICE MAX AMOUNT
0044 UNDEFINED Each Neck Gasket (L-MASS) - Spare Part
FFP
The non-warranted services of the Lightweight Maritime Assault Suit System (L-
MASS).
UNIT UNIT PRICE MAX AMOUNT
0045 UNDEFINED Each Neck Relief Ring (L-MASS) - Spare Parts
FFP
Replacement part for the Lightweight Maritime Assault Suit System (L-MASS)
UNIT UNIT PRICE MAX AMOUNT
0046 UNDEFINED Each Suspenders (L-MASS) - Spare Part
FFP
Replacement part for the Light Weight (LW) Maritime Assault Suit System
(MASS)
UNIT UNIT PRICE MAX AMOUNT
0047 UNDEFINED Each Zipper T Bar (L-MASS) - Spare Part
FFP
Replacement part for the Light Weight (LW) Maritime Assault Suit System
(MASS)
UNIT UNIT PRICE MAX AMOUNT
0048 UNDEFINED Each Repair Kit (L-MASS) w Repair Instruction
FFP
UNIT UNIT PRICE MAX AMOUNT
0049 UNDEFINED Each Laundering (L-MASS)
FFP
Contractor shall launder Light Weight (LW) MASS in accordance with paragraph 9 of Statement of Work
UNIT UNIT PRICE MAX AMOUNT
0050 UNDEFINED Each Users Manual (L-MASS)
FFP
Technical Data Item Provide operator manual in accordance with paragraph 1 of the Statement of Work, and CDRL A001.
UNIT UNIT PRICE MAX AMOUNT
0051 5500 Each MASS Over-Garment - AOR 1 - Small Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern
UNIT UNIT PRICE MAX AMOUNT
0052 5500 Each MASS Over-Garment -AOR 1- Small Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0053 5500 Each MASS Over-Garment - AOR 1 - Small Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0054 5500 Each MASS Over-Garment -AOR 1- Medium Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0055 5500 Each MASS Over-Garment -AOR 1- Medium Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work
UNIT UNIT PRICE MAX AMOUNT
0056 5500 Each MASS Over-Garment - AOR 1 - Medium Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work
UNIT UNIT PRICE MAX AMOUNT
0057 5500 Each MASS Over-Garment - AOR 1 - Large Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0058 5500 Each MASS Over-Garment -AOR 1- Large Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0059 5500 Each MASS Over-Garment - AOR 1 - Large Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0060 5500 Each MASS Over-Garment -AOR 1-XLarge Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0061 5500 Each MASS Over-Garment -AOR 1-XLarge Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0062 5500 Each MASS Over-Garment -AOR 1- XLarge Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0063 5500 Each MASS Over-Garment - AOR 1- XXLarge Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0064 5500 Each MASS Over-Garment -AOR 1-XXLarge Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0065 5500 Each MASS Over-Garment - AOR 1 -XXLarge Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0066 5500 Each MASS Over-Garment - AOR 2 - Small Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0067 5500 Each MASS Over-Garment - AOR 2 -Small Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0068 5500 Each MASS Over-Garment - AOR 2 - Small Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0069 5500 Each MASS Over-Garment - AOR 2 - Medium Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0070 5500 Each MASS Over-Garment -AOR 2 -Medium Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0071 5500 Each MASS Over-Garment - AOR 2 - Medium Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0072 5500 Each MASS Over-Garment - AOR 2 - Large Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0073 5500 Each MASS Over-Garment -AOR 2- Large Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0074 5500 Each MASS Over-Garment - AOR 2 - Large Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0075 5500 Each MASS Over-Garment - AOR 2 -XLarge Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0076 5500 Each MASS Over-Garment -AOR 2-XLarge Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0077 5500 Each MASS Over-Garment - AOR 2 -XLarge Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0078 5500 Each MASS Over-Garment - AOR 2 -XXLarge Short
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0079 5500 Each MASS Over-Garment -AOR 2-XXLarge Regular
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0080 5500 Each MASS Over-Garment - AOR 2 -XXLarge Tall
FFP
Contractor shall dye MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0081 5500 Each L-MASS AOR 1 - Small Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0082 5500 Each L-MASS AOR 1 - Small Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0083 5500 Each L-MASS AOR 1 - Small Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0084 5500 Each L-MASS AOR 1 - Medium Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0085 5500 Each L-MASS AOR 1 - Medium Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0086 5500 Each L-MASS AOR 1 - Medium Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0087 5500 Each L-MASS AOR 1 - Large Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0088 5500 Each L-MASS AOR 1 - Large Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0089 5500 Each L-MASS AOR 1 - Large Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0090 5500 Each L-MASS AOR 1- XLarge Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0091 5500 Each L-MASS AOR 1- XLarge Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0092 5500 Each L-MASS AOR 1 - XLarge Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0093 5500 Each L-MASS AOR 1 - XXLarge Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0094 5500 Each L-MASS AOR 1 - XXLarge Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0095 5500 Each L-MASS AOR 1 - XXLarge Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 1 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0096 5500 Each L-MASS AOR 2 - Small Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0097 5500 Each L-MASS AOR 2 - Small Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0098 5500 Each L-MASS AOR 2 - Small Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0099 5500 Each L-MASS AOR 2 - Medium Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0100 5500 Each L-MASS AOR 2 - Medium Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0101 5500 Each L-MASS AOR 2 - Medium Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0102 5500 Each L-MASS AOR 2 - Large Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0103 5500 Each L-MASS AOR 2 - Large Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0104 5500 Each L-MASS AOR 2 - Large Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0105 5500 Each L-MASS AOR 2 - XLarge Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0106 5500 Each L-MASS AOR 2 - XLarge Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
UNIT UNIT PRICE MAX AMOUNT
0107 5500 Each L-MASS AOR 2 - XLarge Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0108 5500 Each L-MASS AOR 2 - XXLarge Short
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0109 5500 Each L-MASS AOR 2 - XXLarge Regular
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
0110 5500 Each L-MASS AOR 2 - XXLarge Tall
FFP
Contractor shall dye L-MASS in accordance with paragraph 7 of Statement of Work AOR 2 Camouflage Pattern Ordering Period One: Jan 2010 - Dec 2010
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1001 5500 Each MASS Over-Garment - Small Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1002 5500 Each MASS Over-Garment - Small Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1003 5500 Each MASS Over-Garment - Small Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1004 5500 Each MASS Over-Garment - Medium Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1005 5500 Each MASS Over-Garment - Medium Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1006 5500 Each MASS Over-Garment - Medium Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1007 5500 Each MASS Over-Garment - Large Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1008 5500 Each MASS Over-Garment - Large Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1009 5500 Each MASS Over-Garment - Large Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1010 5500 Each MASS Over-Garment - XLarge Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1011 5500 Each MASS Over-Garment - XLarge Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1012 5500 Each MASS Over-Garment - XLarge Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1013 5500 Each MASS Over-Garment - XXLarge Short
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1014 5500 Each MASS Over-Garment - XXLarge Regular
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1015 5500 Each MASS Over-Garment - XXLarge Tall
FFP
Maritime Assault Suit System (MASS) IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1016 UNDEFINED Each Zipper Replacement (MASS) - Front Entry
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) to include other MASS not purchased under this contract.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1017 UNDEFINED Each Zipper Replacement (MASS)- Relief
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.
UNIT UNIT PRICE MAX AMOUNT
1018 UNDEFINED Each Wrist Gasket (MASS) - Spare Part
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.
UNIT UNIT PRICE MAX AMOUNT
1019 UNDEFINED Each Neck Gasket (MASS) - Spare Part
FFP
The non-warranted services of the Maritime Assault Suit System (MASS) replacement to include other MASS not purchased under this contract.
UNIT UNIT PRICE MAX AMOUNT
1020 UNDEFINED Each Neck Relief Ring (MASS) - Spare Part
FFP
UNIT UNIT PRICE MAX AMOUNT
1021 UNDEFINED Each Suspenders (MASS) - Spare Part
FFP
UNIT UNIT PRICE MAX AMOUNT
1022 UNDEFINED Each Zipper T Bar (MASS) - Spare Part
FFP
UNIT UNIT PRICE MAX AMOUNT
1023 UNDEFINED Each Repair Kit (MASS) w Repair Instructions
FFP
UNIT UNIT PRICE MAX AMOUNT
1024 UNDEFINED Each Laundering (MASS)
FFP
Contractor shall launder MASS in accordance with paragraph 9 of Statement of Work
UNIT UNIT PRICE MAX AMOUNT
1025 UNDEFINED Each Users Manual (MASS)
FFP
Technical Data Item Provide operator manual in accordance with paragraph 1 of the Statement of Work and CDRL A001.
UNIT UNIT PRICE MAX AMOUNT
1026 5500 Each L- MASS Over-Garment - Small Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1027 5500 Each L- MASS Over-Garment - Small Regular
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1028 5500 Each L- MASS Over-Garment - Small Tall
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1029 5500 Each L- MASS Over-Garment - Medium Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
UNIT UNIT PRICE MAX AMOUNT
1030 5500 Each L- MASS Over-Garment - Medium Regular
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1031 5500 Each L- MASS Over-Garment - Medium Tall
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks. The government will specify sock size with each order under this contract line item accordance with requirements.
Ordering Period Two: Jan 2011 - Dec 2011
Offerors shall establish a time period for ordering, as well as, provide stepladder
UNIT UNIT PRICE MAX AMOUNT
1032 5500 Each L- MASS Over-Garment - Large Short
FFP
Lightweight Maritime Assault Suit System (L-MASS), IAW Statement of Work dated 26 Aug 09, with reinforcements in key garment areas, field repair kit, operator manual IAW Exhibit A, and neck tension relief/ring, and integrated socks.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .