This document is a Local Site Approval Request for a generator installation and electrical project at Naval Submarine Base New London. The project involves installing a permanent standby generator at Building B564, located on the east side of the building in an existing parking area. Construction activities will include asphalt saw cutting, excavation, and concrete work. A crane may be used to set the generator on an equipment pad, and new conduit and cable will be installed overhead from an exterior-mounted generator.
The project scope includes installing a new generator circuit breaker/interlock, wiring to connect both temporary and permanent generators, and rerouting conduit along the building's length. An automatic transfer switch will be installed to replace an existing manual transfer switch, and the electrical room will be reconfigured to accommodate the new equipment. The estimated project timeline runs from 20 June 2025 to 01 April 2026, with 4-5 personnel expected to work during a typical workday (0800-1600). The document is signed by the SUBASE Explosive Safety Officer and includes specific safety and operational guidelines for the installation.