Responses_to_Questions.pdf

PDF 65 KB Posted

Attached to
Richland Federal Building Elevator Modernization Federal contract opportunity
Solicitation number
GS-10P-14-LT-R-0048
Issued by
General Services Administration Public Buildings Service Region 10

About this file

Responses to Questions

View the file

Other files for this federal contract opportunity

Other files attached to Richland Federal Building Elevator Modernization, newest first.
File Type Posted
Amend_003.pdf PDF
Atch4a_WD_WA30_07.10.15_DB_Richland_FB_Elev.pdf PDF
CoverPage_ _1442_Rev2_DB_Richland_FB_Elev.pdf PDF
Atch_2_Div_1_Rev1_DB_Richland_FB_Elev.pdf PDF
Atch_1_SOW_Rev1_DB_Richland_FB_Elev.pdf PDF
Atch_1b_Specs_Rev1_DB_Richland_FB_Elev.pdf PDF
Amend_002.pdf PDF
Amend_001_DB_Richland_FB_Elev.pdf PDF
CoverPage_ _1442_Rev1_DB_Richland_FB_Elev.pdf PDF
Pre-proposal_Conf_Slides_DB_Richland_FB_Elev.pdf PDF
The_Agreement_Rev1_DB_Richland_FB_Elev.pdf PDF
The_Solicitation_Rev1_DB_Richland_FB_Elev.pdf PDF
Pre-proposal_Confer_Attendees_DB_Richland_FB_Elev.pdf PDF
The_Solicitation_DB_Richland_FB_Elev.pdf PDF
The_Agreement_DB_Richland_FB_Elev.pdf PDF
Atch_4a_WD_WA30_6.12.15_DB_Richland_FB_Elec.pdf PDF
Atch_3_HP_Zoned_Plan_DB_Richland_FB_Elev.pdf PDF
Atch_2_Div_1_DB_Richland_FB_Elev.pdf PDF
Exhibit_5_SF_24-98_DB_Richald_FB_Elev.pdf PDF
Exhibit_3_Perform_Eval_Form_DB_Richland_FB_Elev.docx DOCX document
Atch_4b_SC_WD1985-1233_Rev_29_dtd_5.6.15.pdf PDF
Exhibit_2_Resume_Format_DB_Richland_FB_Elev.docx DOCX document
Atch_1_Tech_Docs.zip ZIP file
Exhibit_4_Security_Pkg_Elev.zip ZIP file
CoverPage_ _1442_DB_Richland_FB_Eev.pdf PDF
Exhibit_1_Pricing_Schedule_DB_Richland_FB_Elev.xlsx XLSX spreadsheet
Reps_and_Cert_C301_APR_15.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation GS-10P-14-LT-R-0048 Design Build Richland Federal Building Elevator Modernizaton

Responses to Questions:

The Design Process is in actuality a submittal approval process. Contractor shall provide an initial design that consists of the submittals required under Section 14220, para 1.7 along with submittals for the related building components. The government will have 14 days to review the initial design (submittal package). Contractor shall provide a final design (submittal package) that reflects the design review comments and resolution. The SOW & Division 1 will be corrected to reflect this change.

Installation Schedule: The property manager desires the freight elevator (car 6) be completed first followed by passenger elevator 1. No repairs will be required of elevator 1. The contractor can begin the upgrade. The Interim Maintenance will begin upon issuance of Notice to Proceed with the construction.

Bidder’s may assume that there will be available storage space outside the building near the loading dock where they can store material in a container provided by them for the duration of the project. No space outside of elevator machine room spaces is available for storage within the building.

The government is contemplating changing the freight elevator to a new AC geared machine and the passenger elevators to new AC gearless machines. This will be updated in the Specifications.

The vertical access panel from floor 7 near the passenger elevators is located in the ceiling of the men’s bathroom.

File details come from the government source that posted it. Updated .