Pre-proposal_Conf_Slides_DB_Richland_FB_Elev.pdf
PDF 260 KB Posted
- Attached to
- Richland Federal Building Elevator Modernization Federal contract opportunity
- Solicitation number
- GS-10P-14-LT-R-0048
About this file
Pre-proposal Conference Slides
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA PUBLIC BUILDINGS SERVICE
DB RICHLAND FB ELEVATOR MODERNIZATION
AGENDA
• Introductions
• Project Facts/Project Objective/Project Scope
• Contract Scope
• Rules of the Road (Solicitation Phase)
• Solicitation Particulars
• Evaluation Criteria / Pricing
• Lessons Learned
• Questions and Answers
Introductions and Contact Information
Contracting Officer: Dawn Ashton
Ph: 253-931-7784, EMAIL: dawn.ashton@gsa.gov
Project Manager: Shawn Duffee
Ph: 253-931-7241, EMAIL: shawn.duffee@gsa.gov
Property Manager: Arthur Hall
Ph: 509-372-1121, EMAIL: arthur.hall@gsa.gov
Construction Management Assist: Lerch Bates (Solicitation Phase)
NOTE: All questions should be sent to CO with a cc to the Project Mgr
Project Facts:
One portion of a Capital Project; the other scope is for electrical upgrades
Project is to upgrade the five passenger elevators and 1 freight elevator that are at the end of its useful life
Building was constructed in 1964 and the elevators were installed at that time. A modernization was completed in the mid-1990s.
Tenant includes: DOE, US Courts, US & Post Office
Scope is performance based and should follow the recommendations in the Project Development Study.
Building Size: Eight levels including basement
Determined eligible for the National Register of Historic properties
Project Range $1.0M - $2.0M
Goal/Project Objectives:
• Goal: Provide Reliable Service for the next 20 years
• Install most modern and relevant upgrades
• Reduce maintenance costs
• Minimize disruption to tenant operations during construction
• Reliable & Responsive Operations & Maintenance
• No LEED Certification
• Increase Small Business Participation
Project Scope:
Project will consist of the following major components:
1. New operation and motor controls, governors, hoist ways
2. New door operators and related hardware
3. New cab interiors and fixtures
4. Addition of Seismic Devices
5. Replace existing geared traction machine with AC gearless traction machine for freight elevator
6. Regenerative Drive
7. Option for AC Gearless Machines for primary elevators.
FCS B12021 REDEVELOPMENT
Overall Contract Scope of Work
1. DB services will consist of 2 phases.
• Design development based on PDS and submitted IAW the SOW..
• Construction phase will include construction, Div 1 - General Requirements, and other construction management like services (meeting documentation, technical recommendations, on-going constructability and value engineering)
2. CONTRACT WILL BE AGGRESSIVELY PARTNERED WITH AND WILL INCLUDE ASSISTANCE
BY A THIRD PARTY CONSULTANT ACTING IN THE CAPACITY OF A CMA (Lerch Bates)
3. Contractor will be expected to coordinate/accommodate the electrical work that may be performed concurrently.
4. Contractor must comply with historical requirements relative to pre-qualification of employees.
5. The resultant contract will be Firm Fixed Price.
6. Award will represent best value to Government using LPTA, with a targeted award of August 25, 2015.
DB RICHLAND FB ELEVATOR MODEERNIZATION
Rules-of-the-Road (During Solicitation Phase)
1. Offerors should submit all questions and/or confirm all discussions in writing to the Contracting Officer with cc to Project Manager.
2. Questions raised during the Site Visit are due within 5 workdays.
Other inquiries are requested as soon as possible and should be received 5 days prior to RFP closing date.
3. The Federal Business Opportunities web site (http://www.fbo.gov) will continue t be used to post/distribute all solicitation related documentation.
Solicitation Particulars
1. Single Phase Competitive Negotiated (FAR 15) procurement
2. Offerors will submit a Technical Proposal and Price Proposal by the due date in the RFP (July 13, 2015 at 2:00pm local time).
3. This will be a Best Value Source Selection using Lowest Price Technically Acceptable (LPTA) technique (FAR 15.301).
- Technical Proposals will be evaluated on a Pass/Fail basis
- Price Proposals will be evaluated for price reasonableness
- Award will be made to the offeror that submits an acceptable proposal that offers the lowest reasonable price.
4. Offerors should submit their best offer because the government anticipates making an award based on initial offer; the government does not anticipate discussions.
EVALUATION FACTORS
1. FACTOR 1 – COMPREHENSIVE SCHEDULE AND
RESOURCE/STAFFING PLAN
2. FACTOR 2 – QUALITY CONTROL PLAN
3. FACTOR 3 – OPERATION AND MAINTENANCE
PLAN
4. FACTOR 4 – COLLABORATION
5. FACTOR 5 – PAST PERFORMANCE
- PIPRS or Customer Satisfaction Survey
Offeror must receive a ‘Pass’ (Acceptable Rating) for every evaluation factor to receive an overall Acceptable Rating and be eligible for an award.
PRICING
1. Cover Letter
2. SF1442 (must be signed by the offeror)
3. Bid Guarantee
4. The Agreement
5. Pricing Schedule and Total Evaluated Price Worksheet
6. - CSI Masterformat Level 3 break-out to be included
7. Representations and Certifications
8. Joint Venture Agreement (as applicable)
(Suggested) Lessons Learned (issues raised in past debriefs)
1. Don’t recycle old proposals. Default position should be to start with a blank page.
2. Comply with submittal instructions including required signatures, formats, page limits, etc.
3. Limit proposals to the information requested; do not submit extraneous information as it will not be considered in the evaluation.
4. Don’t assume we know something, if in doubt make sure you state exactly what you want the source selection board to consider.
5. The technical factors are designed to demonstrate/prove a capacity and how that (capacity) applies to the current project.
6. Ensure material submitted maps to factors listed.
DB RICHLAND FB ELEVATOR MODENIZATION
QUESTIONS AND ANSWERS
FCS B12021 REDEVELOPMENTDB RICHLAND FB ELEVATOR MODERNIZATION
SITE WALK
Tour of Richland FB
| GSA PUBLIC BUILDINGS SERVICE | |
| GSA PUBLIC BUILDINGS SERVICE | |
| DB RICHLAND FB ELEVATOR MODERNIZATION | |
| GSA PUBLIC BUILDINGS SERVICE | |
| GSA PUBLIC BUILDINGS SERVICE | |
| GSA PUBLIC BUILDINGS SERVICE | |
| FCS B12021 REDEVELOPMENT | |
| DB RICHLAND FB ELEVATOR MODERNIZATION | |
| FCS B12021 REDEVELOPMENT | |
| FCS B12021 REDEVELOPMENT | |
| FCS B12021 REDEVELOPMENT | |
| FCS B12021 REDEVELOPMENT | |
| FCS B12021 REDEVELOPMENT | |
| FCS B12021 REDEVELOPMENT |
File details come from the government source that posted it. Updated .