RFP_AM01_Janitorial_FCS_1202_Oxbow_2013_12_17.pdf
PDF 165 KB Posted
- Attached to
- Janitorial & Related Services Federal contract opportunity
- Solicitation number
- GS-10P-14-LS-D-0003
About this file
GS-10P-14-LS-D-0003 AMENDMENT NO. AM01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_AM02_Sectioon_J_2013_12_20a.pdf | ||
| Pre-Proposal_Q_ _A_12-19-13.pdf | ||
| Pre-Proposal_Q_ _A_12-18-13.pdf | ||
| Pre-Proposal_Q_ _A_12-17-13.pdf | ||
| RFP_Janitorial_FCS_1202_Oxbow_2013_12_17_FBO.docx | DOCX document | |
| Pre-Proposal_Sign-In_Sheet_2013_12_17.pdf | ||
| RFP_Janitorial_FCS_1202_Oxbow_2013_12_06_FBO.docx | DOCX document | |
| CIW_v.4_Change_12-02-10.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
MAE C. SMITH
Contracting Officer
15B. Contractor/Offeror 15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
(Signature of person authorized to sign)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. Project No. (if applicable)
AM01 12/17/13
6. ISSUED BY Code 7. ADMINISTERED BY (If other than item 6) Code
General Services Administration Service Contracts Branch (10PMM) 400 15 th Street SW
Auburn, WA 98001-6599
See Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATIONS
X
GS-10P-14-LS-D-0003
9B. DATED (SEE ITEM 11)
Dec 6, 2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
a) THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
JANITORIAL & RELATED SERVICES
FEDERAL CENTER SOUTH BUILDING 1202 OXBOW
SEATTLE, WASHINGTON
The purpose of this amendment is to make changes in Solicitation GS-10P-14-LS-D-0003.
See attach pages.
SF30 Continuation of Block Narrative Page 2 of 2
GS-10P-14-LS-D-0003 AMENDMENT NO. AM01
Page - 2 OF 2
Solicitation GS-10P-14-LS-D-0003 Amendment AM01 Janitorial & Related Services Federal Center South Building 1202 Oxbow Seattle, Washington
1. The purpose of this amendment is to make the following changes:
a) Cover Page
Remove “DOES INPUT” under GSA logo and address.
b) SF 1449, Block 25
Remove “Accounting & Appropriation Data will be identified with each individual task orders”.
c) SF 1449, Block 26
Remove “Funding will be obligated via individual task orders”.
d) Page 23, Paragraph C.5.1.8 High Cleaning
“High Surfaces: Surfaces above 70 inches shall be cleaned and free of dirt, dust, and cobwebs ANNUALLY. Where glass is present, both sides shall be clean and free of streaks. Included in high cleaning is exposed piping. This does not include the removal of vents, tiles, or fixtures.
High density roller file cabinets located in the library shall be dusted quarterly.”
e) Page 29, Paragraph C.5.4.5 Mowing & Edging
”Contractor shall mow and edge all turf areas twice a year (late spring and early fall) per architecture design. Mulching mowers shall be used; however, non-mulching mowers are permitted at some sites and shall be approved by the CO or their designee. Grass clippings shall be cleared from walkways and roadways and blown onto the grass. As appropriate, grass clippings shall be left in place, composted, or mulched as coordinated by the CO or their designee.”
f) Page 49, Paragraph C.18 Contractor Submittals/Deliverables Chart
Change from “PRIOR TO THE START OF WORK” to “START OF WORK”.
Change from “AFTER THE START OF WORK” to “START OF WORK”.
g) Page 96, Exhibit 1 – Building Information Sheet, Part 2 Building Statistics and Itemized
Remove “RENTABLE” and replace with “CLEANABLE”.
Remove “clean before 4 pm” and replace with “Security Offices, EOC, RCC, Radio Room & NOC (Contractor shall coordinate with COR and tenant).
File details come from the government source that posted it. Updated .