Items # Description
Daily Weekly Monthl y
Every Six
Months
Every
Months
1 Monitor all alarms generated on the website and respond text alarm messages. X
Respond and acknowledge each alarm generated within 36 hours. Resolve the problem by sending a techinican to troubleshoot the system in the following time frames:
Communication error: 2 days. Satcon Inverter Faults: 1 Day; Satcon Zones: 3 Days.
Weekends and after hours are not to be included.
X
Enter into website database the parts and service performed to solve each problem encountered for this entire document.
X
Verify each of the separate web pages for the Roof, Ground and Field #1 are reporting daily data as designed.
X
5 View Also Energy colored array production report to verify all strings are performing. X
6 Verify mobile applications are still running for smart phones and iPads. X
Compare previous year monthly kWH for each of the (16) inverters is within 2% given same conditions.
X
8 Monitor string combiner box amperage to detect a loss of more 10% of baseline value. X
Compare monthly kWH production between Siemens and Satcon and report any discrepencies between systems.
X
For each of the (16) arrays sum field commissioning report for a single random combiner box and compare it to the PV Zone value for the same time and date.
X
11 Adjust PV Zone alarm settings baseline down by 1% for panel degradation. X
1 Verify ambient temperatures, panel temperatures, wind speed, pyranometer. X
2 Verify panel temperatures between devices. X
3 Verify wind speed between devices. X
4 Verify pyranometer. X 1 Verify all cameras are uploading. X
2 Verify all camera and light is working at night. X
1 Verify system performance is updating. X
2 Verify cameras and videos are working on website. X
3 Verify GHG levels are being updated. X
View advanced meter website and verify all PV field meters are recording and communicating to main system.
X
2 Verify Siemens pyranometer is reporting data. X
Review PV production reports and compare to the same month last year. Report any anomalies and provide possible causes.
X
Review yearly production totals for kWH and write a yearly production report for review by GSA. The report shall include the following items: Expected production, actual production, and probable reasons for under or over producing for this fiscal year.
X
Siemens Website
Public Website
PV Systems 12 Month Website Operations and Maintenance Schedule DFC Solar PV Website Schedule